Requests Approval to Implement Alternative Rules of ASME Section XI Code Case N-498-1 for Class 1,2 & 3 Sys Approved by ASME in May 1994
ML20070B532
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/24/1994
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C311-94-2093, NUDOCS 9406300197
Download: ML20070B532 (2)


Text

-

cm #

GPU Nuclear Corporation G U Muclear w'n:r Middletown, Pennsylvania 17057-0480 (717) 944-7621 Writer's Direct Dial Number:

(717) 948-8005 June 24, 1994 C311-94-2093 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Request for Approval to Use ASME Code Case N-498-1

" Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems,Section XI, Division 1" In accordance with 10 CFR 50.55a(a)(3), GPU Nuclear requests approval to implement the alternative rules of ASME Section XI Code Case N-498-1 for Class 1, 2, and 3 systems which was approved by the ASME in May 1994. Code Case N-498-1 allows a VT-2 visual leakage examination to be performed at nominal operating pressure as an alternative to the 10-year system hydrostatic pressure test. Code Case N-498 applies to Class 1 and 2 systems and was approved by Revision 9 of Regulatory Guide (R.G.) 1.147, dated April,1992.

Code Case N-498-1 extends applicability of the alternative rules to Class 3 systems as required by Table IWD-2500-1, Categories D-A, D-B, and D-C of the Section XI Code.

l In a letter dated February 16, 1993 GPU Nuclear requested schedular relief from the ASME Section XI Code requirement to perform a hydrostatic test of the o- Class 3 Main Steam System piping segments extending frnm MS-V2A/B to the

,@@ turbine driver for the Turbine-driven Emergency Feedwater (EFW) Pump, EF-Pl.

N o n- Relief was requested based upon hardship posed by the hydrostatic test h

.So requirement with essentially no benefit because the increase in pressure to perform the test does not significantly stress or challenge the pressure w boundary. Schedular relief was requested pending issuance of Code Case 498-1. l og In a letter dated September 1, 1993 the NRC granted relief to defer the i 85 hydrostatic test until the TMI-l Cycle 11 Refueling Outage (llR) as requested.

O*

4 Since Code Case 498-1 has only recently been approved by the ASME, we 88 understand that NRC approval through incorporation in to R.G. 1.147 will l c o.a. require an additional two years. Therefore, specific approval is needed for l ud GPU Nuclear CorporatFon is a subsidiary of General Pubhc Ut:hties Corporat>on ,

k1

e- f C311-94-2093 Page 2 use of Code Case 498-1 prior to the llR Outage, which is currently scheduled to begin in September 1995. Approval is requested by January 1995 to facilitate the budgeting and scheduling of activities for the 11R Outage.

Sincerely, fib bb

  • T.G.Brodbton  ;

Vice President and Director, TM1 MRK cc: Region I Administrator i TMI-l Senior Project Manager  !

TMI Senior Resident Inspector i