Updates 940414 Response to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers
ML20069Q019
Person / Time
Site: Pilgrim
Issue date: 06/17/1994
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-072, 94-72, IEB-93-002, IEB-93-2, NUDOCS 9406270208
Download: ML20069Q019 (4)


Text

1 5

BOSTON EDISON Pilgum Nucmar Power Station NRCB 93-02, Supplement 1 Rocky Hd! Road P!yrnouth, Massachusetts 02360 June 17,1994 BECo Ltr. 94- 072 E. T. Boulette, PhD Senior Vice Presider.t - Nuclear U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 Response to NRC Bulletin 93-02, Supplement 1

" Debris Plugging of Emergency Core Cooling Suction Strainers" NRC Bulletin 93-02, Supplement 1, requested ov ner s of Boiling Water Reactors (BWRs) to take interim actions to enhance the capability to prevent or mitigate loss of Emergency Core Cooling System (ECCS) following a Loss of Coolant Accident (LOCA) due to suppression pool strainer clogging. This letter updates our sixty day response (Reference BECo Ltr.94-042, dated April 14,1994) and documents completion of the requested interim actions of NRC Bulletin 93-02, Supplement 1. Revision bars identify the updated information.

REQUESTED ACTION Provide training and briefings to apprise operators and other appropriate emergency response personnel of the information contained in NRC Bulletin 93-02, Supplement 1, and in the referenced NRC Information Notices regarding the potential for suppression pool strainer clogging.

RESPONSE

The information contained in Bulletin 93-02, Supplement 1, and in the referenced NRC l Information Notices regarding the potential for suppression pool strainer clogging was I incorporated into the Operator Requalification Training Program and was completed on i May 15,1994, with the exception of one SRO on loan to INPO.

l Training for appropriate Emergency Response Personnel was conducted on April 20,  !

1994. Included in this group were the E:nergency Directors and Emergency Plant j Managers. j 9406270208 940617 1 i PDR ADOCK 05000293 [,I \ I G PM ev

I REQUESTED ACTION Assure that the Emergency Operating Procedures (EOPs) make the operator aware of possible indications of ECCS strainer clogging and provide guidance on mitigation.

RESPONSE

The Pilgrim Station symptom-based Emergency Operating Procedures (EOPs)

(flow / logic diagrams) are based on the BWROG Emergency Procedure Guidelines, currently Rev. 4. On loss of the ECCS Pumps (regardless of reason), the EOPs direct l the operators to lineup alternate sources of water for reactor cooling /fillif ECCS pumps are not capable of maintaining reactor water level. Indications of suction strainer plugging are available to the operator and include pump flow and reactor water level indications in the Control Room.

REQUESTED ACTION Institute procedures and other measures to provide compensatory actions to prevent, delay, or mitigate a loss of available Net Positive Suction Head (NPSH) margin under LOCA conditions. Such measures should be consistent with providing the design basis emergency system functions for core and containment cooling.

RESPONSE

Pilgrim Station Procedures 2.2.19, " Core Spray", and 2.2.20, " Residual Heat Removal",

were revised and issued on May 17,1994, to provide guidance on identifying the l symptoms of strainer clogging and measures to provide compensatory actions to l prevent, delay, or mitigate a loss of available NPSH margin under LOCA conditions.

Pilgrim Station procedures for the High Pressure Coolant Injection (HPCI) System and l Reactor Core Isolation Cooling (RCIC) System were reviewed and found satisfactory.

The EOPs direct the HPCI pump suction to be from the Condensate Storage Tanks >

(CST) that are not equipped with strainers or to bypass the Suppression Pool / CST I transfer function when the CST is available. The RCIC System is not part of the ECCS. )

Regardless, the EOPs direct the RCIC pump suction to be from the CST or to bypass j the Suppression Pool / CST transfer function when the CST is available.

BACKGROUND in 1984, Boston Edison Company requested General Electric Company to perform an analysis to evaluate containment emergency sump (suppression pool) performance in accordance with I Regulatory Guide (RG) 1.82.

The primary concern was poter.!tial clogging of the Residual Heat Removal (RHR) and Core Spray (CS) Systems suction strainers in the torus (suppression pool) by insulation debris during a design basis LOCA. The evaluation was performed in accordance with the methods in the August 25,1983, draft of RG 1.82, Rev.1. The analysis concluded the area of the RHR I and CS suction strainers had to be enlarged based on the maximum calculated insulation  !

debris loading. In 1984, six new suction stra;ners (2 for CS and 4 for RHR) were installed I having an open strainer area three times greater than the six strainers removed. The NPSH l was evaluated, at 1750F, maximum debris loading on the strainers, and no overpressure condition in torus. This temperature is greater than the maximum bulk pool temperature for the worst case transient (1600F) or post accident condition (1660F). The above actions provided reasonable assurance the NPSH for RHR and CS pump would be appropriate for all conditions.

1

. i During this same time frame, the insulation on the piping systems located in the drywell was removed and replaced with the blanket type NUCON insulation. Although some degree of shredding of the NUCON blanket insulation is expected during a design basis LOCA, much of the displaced insulation would consist of complete blanket sections or portions of blanket sections and would not degrade due to alkaline conditions because of the neutral pH of the Pilgrim Station suppression pool. 1 Unlike the Barseback and Perry Plant design, Pilgrim Station has an enclosed suppression pool (torus). The insulation displaced from the drywell piping during a Design Basis Accident would have to travel a torturous path to reach the water in the suppression pool. Calculations  !

indicate the amount of debris reaching the pool would not be sufficient to result in j simultaneous clogging of the six strainers for the RHR and Core Spray Systems. As stated in 1 BECO's response to Bulletin 93-02, unlike the open suppression pool of the Mark til I Containment, the torus is closed except for vent pipes connecting the torus to the drywell.

Procedural controls are in place to provide inventory control when the torus is open. This design in conjunction with the procedura! w trols minimizes the entry of dust, dirt, and other foreign material into the suppression chamber.

The Pilgrim torus is maintained clean. The torus was partially drained and inspected during Refueling Outage (RFO) No. 7 (1986-1988). During RFO No. 8 (1991) the torus was cleaned and inspected utilizing underwater divers and a vacuum pump to remove minor amounts of accumulated sediment and one respirator face mask. The divers were inspecting the condition of the torus in conjunction with NRC Information Notice (IN) 88-82. Ten of the sixteen bays were painted. Due to the cleanliness of the suppression pool, further clogging of suction strainers by filtration of pre-existing debris following a design basis LOCA is not considered to i be significant for Pilgnm Station. I Based on the above discussion, Pilgrim Station's design, procedural and administrative controls are in place to preclude events similar to those referenced in Bulletin 93-02, Supplement 1. _

(b L>G d b E.T. Boulette, PhD l

Commonwealth of Massachusetts)  !

County of Plymouth) l l

Then personally appeared before me, E.T. Boulette, who is duly sworn, did state that he is  !

Senior Vice President - Nuclear of Boston Edison Company and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best on his knowledge and l belief. l My commission expires: MAR 4 - 1000 DATE

~~

/85 NOTARY PUBLIC GERALD G. WHITNEY, Notary Public l

?/...T My Commission Expires March 4,1999 4 .ow,

  • g:w .w z
v. .:

W ),k i; ,

q,9 m

A 4 8 e

l

)

cc: Mr. Thomas T. Martin Regional Administrator, Region i 475 Allendale Road King of Prussia, PA 19406 Mr. R. B. Eaton Div. of Reactor Projects 1/11  !