ML20069P925
| ML20069P925 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/03/1982 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Clark R Office of Nuclear Reactor Regulation |
| References | |
| LIC-82-395, NUDOCS 8212080380 | |
| Download: ML20069P925 (2) | |
Text
/ '
Omaha Public Power District 1823 HARNEY m OMAHA, NEBRASKA 68102 a TELEPHONE S36-4000 AREA CODE 402 December 3, 1982 LIC-82-395 Mr. Robert A. Clark, Chief U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.
20555
Reference:
Docket No. 50-285
Dear Mr. Clark:
This is to document information provided to you via telephone on December 2, 1982 concerning the Omaha Publi. Power District's Emergency Operations Facility (E0F). A conceptual design covering much of this information was provided in the District's June 1,1981 letter.
1)
E0F Construction Schedule a)
Bid award date - February 18, 1982.
b)
Construction commenced - April 13, 1982.
c)
Construction completed - October 1, 1982.
2)
Type of Construction Single storied pre-engineered insulated metal clad building.
3)
E0F Location 17 miles from the Fort Calhoun Station site.
4)
Interim EOF Location At the Fort Calhoun Station site.
5)
Backup E0F Location 17 miles from the Fort Calhoun Station site.
(Backup E0F used in conjunction with the interim EOF.
Backup E0F will be deactivated upon activation of the new EOF.)
Of 6)
EOF Habitability The new E0F is located outside of the ten mile radius; therefore, radiological habitability requirements are not applicable.
8212080380 821203 PDR ADOCK 05000285 F
Mr. Robert A. Clark LIC-82-395 i
Page Two The new EOF is presently being activated and we anticipate that com-munications will be installed within the next one to two months, at which time the EOF will be declared operational.
In the interim, the existing E0F is operational. We plan to notify your office upon acti-vation of the new E0F.
Sincer.ely, s
lj9 --
s W. C. Jones i
Division Manager Production Operations 4
WCJ/KJM:.jmm cc:
LeBoeuf, Lamb, Leiby & itacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 Mr. E. G. Tourigny, NRC Project Manager 1
I
.