ML20069P342
| ML20069P342 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/09/1994 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1-SR-94-001, 1-SR-94-1, 192-00896-JML-B, 192-896-JML-B, NUDOCS 9406240156 | |
| Download: ML20069P342 (1) | |
Text
l
^
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION j
PHOENIX, ARIZONA 85072-2034 P O DOX 52034 102-03002-JMUBAG/PJC
- ^ues u ocvise wJsLi%s?L~
June 9,1994 This is a corrected copy to change the letter # to:
192-00896-JMUBAG/PJC U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D. C. 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1 and 2 Docket No. STN 50-528 (License No. NPF-41)
Docket No. STN 50-529 (License No. NPF-51)
Special Report 1-SR-94-001 File: 94-020-404 Enclosed please find Special Report 1-SR-94-001 prepared and submitted pursuant to the requirements of the PVNGS Offsite Dose Calculation Manual and Technical Specification 6.9.2.
This report discusses the Plant Ventilation System High Range Effluent Monitors (RU-144) in Units 1 and 2 being inoperable for a period greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, if you have any questions, please contact Burton A. Grabo, Supervisor, Nuclear Regulatory Affairs, at (602) 393-6492.
Sincerely, Gp 1
JMUBAG/PJC f
Enclosure cc:
L. J. Callan (all w/ enclosure)
K. E. Perkins K. E. Johnston
]
v1(h OWro n 9406240156 940609 1 0 PDR ADOCK 05000528 g