(q UNITED STATES q
g NUCLEAR REGULATORY COMMISSION g
- j WASHINGTON, D. C. 20555 CONSUMERS POWER COMPANY DOCKET N0. 50-255 PALISADES PLANT
~
AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 71 License No. DPR-20 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Consumers Power Company (the licensee) dated July 6,1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
~
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
i 821EO70201 821201 PDR ADOCK 05000255 P
pop l
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Provisional Operating License No. DPR-20 is hereby amended to read as follows:
- 8. Technical Specifications The Technical Specifications contained in Appendices A' and B (Environmental Protection Plan), as revised through Amendment No. 71 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications. -
3.
This license amendment is effective as of the date of its issuance.
~
FOR THE NUCLEAR REGULATORY COMMISSION Dennis M. Crutc ield Chief Operating Reactors Branch #5 Division of Licensing r, s.
Attachment:
Changes to the Technical Specifications Date of Issuance: December 1, 1982 W
l y
-,,,.----v-
ATTACHMENT TO LICENSE AMENDMENT NO. 71 PROVISIONAL OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Revise Appendix A Technical Specifications by removing the following pages and by inserting the enclosed pages.
The revised pages contain the captioned amendment number and marginal lines indicating the area of change.
PAGES 4-28 4-29 1
m e.
~
a
B
~
4 45 CONTAIMEI;T TESTS (Contd)
(2)
If repairs are not completed and conformance to the acceptance criterion of 4 5 2.b is not demonstrated within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be shut down and depressurized until repairs are effected and the local leakage meets this acceptance criterion.
d.
Test Frequency (1)
Individual penetrations and containment isolation valves shall be leak rate tested at a frequency of'at least every s'ix months prior to'the first postoperational integratad leak rate test, and at a frequency of at least every refueling thereafter, dot ex-ceeding a 2-year interval, except as specified in (a)-and (b) below:
(a) The containment equipment hatch and the fuel transfer tube shall be tested at each refueling shutdown or after each time used, if that be sooner.
(b) The personnel air lock seals shall be tested at six-month intervals, except when the air locks are not opened during the interval. In that case, the test is to be performed after each opening, except that no test interval is to exceed twelve months.
(2)
Each three months the isolation valves mus't be stroked to the position required to fulfill their safety function unless it is established that such operation is not practica'1 during plant operation. The latter valves shall be full-stroked du' ing each' r
cold shutdown.
453 Recirculation Heat Removal Systems a.
Test I
(1) The portion of the shutdown cooling system that is outside the containment shall be tested either by use in normal operation or hydrostatically tested at 255 psig at the interval specified in 6.15.
(2) Piping from valves CV-3029 and CV-3030 to the discharge of the safety injection pumps and containment spray pumps shall be hydrostatically tested at no less than 100 psig at the interval specified in 6.15.
~
~
l 9
i 4-28 Change No. /
j Amendment No. 71
[
h.5 CONTAI?34ENT TESTS (Contd)
~
(3) Visual inspection shall be made for excessive leakage from components of the system at the interval specified in 6.15.
Any l
significant leakage shall be measured by collection and weighing or by another equivalent method.
b.
Acceptance Criterion The maximum allovable leakage from the recirculation heat removal.
systems' components (which include valve stems, flanges and pump seals) shall not exceed 0.2 gallon per minute under the normal hydrostatic head from the SIRW tank (approximately,hh psig).
c.
Corrective Action Repairs shall be made as required to maintain leakage within the acceptance criterion of 4.5.3.b.
.?_
h.S.h*CSurveillance for Prestressing System a.
Tendon inspection shall be accomplished in accordance with the following schedule:
3 1.
One year after initial structural integrity test.
2.
Thrce yccro nfter initial structural integrity test.
3.
Five years after initial structural integrity test.
h.
At five-year intervals thercarter for the life of the planL.
b.
Surveillance tendons for the one-year inspection shall be the nine designated surveillance tendons plus V-10h and V-200.
In addition,15 vertical tendons shall be tested for lift-off forces only.
c.
For the three-year inspection, the curveillance tendens shall consist of the 11 tendons inspected during the one-/ car test plus an additional 10 vertical tendons to be tested for lift-off force only.
The additional 10 tendons shall be selected from tendons other than those tendons tested for lift-off force during the one-year inspection.
e 4-29 Amendment No. X, [. 71
-