Text
e
]
i e
. DOCUMENT TRANSMITTAL 15532 FOR DOCUMENT NOTIFICATION AND/OR TRANSMITTAL To: NRC (DC DESK)
MAC: NlA DESTINATION:
DESCRIPTION:
DATE:
Sat May 28 12:58:24 1994 CPY COPY TOTALS DOCUMENT REV COMMENTS INFO CNTL MSTR AP1050 2
7 1
0 0
i 1
i I
i i
i 0
1 C$iRUC710N8101HE ADDRISSEf; if VOU ARE A HOLDER Of A HARD COPY,PLEAtt VERIFY THE DOCUNifNiillRECilVED AGREES WiTH THE ABOVE DESCRIP1104.
BE SURI10 DESTROY 00Cualf Wils) DR PORT 10NS Of DOCUtif NTisi $UPERSEDED BY 111f A90VE.
THE $1CNATURE INDICATE $ THAT VDU HAVE RE AD AND UNDE ASTAND THESt INE1RUCilDNS A*3 sd Ce ANGES 10 THE DOCUMENTS.
METURW 81GNED ANO DATED IRAN 0tifiT AL TO DOCUMENI CONTROL WITHIN t0 D AYS Ai M AIL CODE:
_X_
NR2B
~ SA16 i
NA1C
[ flerlAe Power Ce9eraties Desement Central Crystal River Emgy Comples l
15700 W. Pont Lies St Cryotel lUwer,fL 344254700 SIGNATURIOf ADDRESSE 1iw A '
DATE
' INDfPENDINI VEntflCAll0N ICesarol fleem Deesmeste Only)
DAff 9406230233 940Sce fM ADOCK 05000302
(
PDA i
j
BPS M
t FLOOD REV 02 AP-1050 l
FLOODING 1.0 ENTRY CONDITIONS JE "COND PUMP PIT SUMP LEVEL HIGH" annunciator alarms, AND any of the following conditions exist:
o Any running CDP decouples or trips
- a 2="".g' o Indication of flooding, r e m ;.r.
tP, i-. cu m ant C e r.u n pn t'
THEN use this procedure.
7ggg ggL g C. R. Nuclear g?
g
,,,,,,,,,memmme+ +===* *"**"
2.0 IMMEDIATE ACTIONS Note o
There are NO Immediate Actions in this procedure.
This Procedure Addressey Safety Related Components DateI!dk/
Approved by MNPO
/4
/SyNgURF/GN TILE)
AP-1050 PAGE 1 of 5 FLOOD l
i
4 i
O 1
BLANK PAGE AP-1050 REV 02 PAGE 2 of 5 FLOOD
3.0 FOLLOW-UP ACTIONS ACTIONS DETAILS 3.1 Notify personnel of plant S0TA conditions as required.
Plant Operators SS00 to evaluate plant conditions for potential entry into the Emergency P1an.
3.2 Determine source of the leak Notify Turbine Building JAN Isolate the leak Operator to determine the QB Trip affected CWP.
source of the leak.
3.3 lE Flooding is excessive and source cannot be determined, JJiEH GO TO STEP 3.7.
3.4 Ensure Reactor Power is reduced Maintain CW inlet to outlet AT
~
below allowable limit for 3 CWP below 21*F.
Operation.
Refer to computer point A869 0
3.5 CONCURRENTLY PERFORM VP-540 Runback Verification Procedure.
3.6 Determine equipment Flooded equipment should not be availability n affected operated areas.
3EHGOTOStep3.11 in this procedure.
3.7 Trip All Running CWPs.
Note The main condenser is no longer available as a heat sink. Core heat removal is accomplished via EFW and use of the ADVs.
3.8 IF in Modes 5 or 6 TRENGOTOStep3.10 in this procedure.
AU AP-1050 REV 02 PAGE 3 of 5 FLOOD
1 i
J
]
l 5
l l
i BLANK.PAGE t
i t
i 4
5 AP-1050 REV 02 PAGE 4 of 5 FLOOD
+
j 3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.9 Ensure the Reactor is tripped
^
a@ Trip Both MFWPs, JEN GO TO E0P-2 VITAL SYSTEM STATUS VERIFICATION, beginning with Step 2.1.
3.10 Restart CWPs necessary for plant cooling which are known to have intact system piping and components.
i 3.11 Exit this procedure.
Maintain stable plant conditions per SS00 direction.
i O
O AP-1050 REV 02 PAGE 5 of 5 (LAST PAGE)
FLOOD
..