INDIANA & MICHIGAN ELECTRIC COMPANY DONALD, q. COOK NUCLEAR PLANT D
PROCEDURE COVER SHEET Procedure No. PMP 2080 EPP.0ll Revision No.
I TrrLE NATURAL EMERGENCY GUIDELINES SCOPE OF REVISION Rev. I - Revised references to an earthquake to reflect present capabilities.
SIGNATURES ORIGINAL R*V I REV.2 R*V 8 AQwe!?_5, PREPARED BY ggg gQ, U
ASSURANCE ~
t INTERFACING DEPARTMENT u-
/
HEAD CONCURRENCE N.A.
D DEPARTMENT HEAD APPROVAL N.A.
pg PLANT NUCLEAR h
g SAirrY COMMITTEE PLANT MANAGER j
APPROVAL N
W,,
t 3
DATE OT ISSUE 3-31-81
//-Afdk O
~
Fonn No. PW 20101 - may, s l
i
' 8212010039 821124-PDR ADOCK 05000315 l
F PDR
4 i
!. 0 t
l LIST dF EFFECTIVE PAGES I
'h j
Pase Number Revision Number and Date
,t J
Page 1 of 3 Revision 1 15-82 l
l 1l 4
Page 2 of 3 Revision 1 15-82 i
i Page 3 of 3 Revision 1 15-82 i
o 1
I 1
l i
l 1
e 2
O i
i r
i i
l l
t l
i l
i 1,
I i
t Page 1 of 1 j
p Revision 1, 11-15-82 U
i 1
1 i
l i
I'
_ _ _ _ _ _ _ _ _ _ _ _. _ ~ _ _ - _.. _.. _,,.... _ _. _.. _ _ _ _ _ _ _. _ _ -, _, -... -, - _ _ _, _. - - - - _..., _ _ _..,,
- - _ ~
PMP 2080 EPP.011 INDIANA I MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT NATURILEMERGENCYGUIDELINES 1.0 OBJECTIVES t
The objective of this procedure is to facilitate preparation and response to a natural emergency (if adequate warning is available) and to mitigate the radiological impact that may be associated with such an emergency.
2.0 RESPONSIBILITIES The Shift Operating Engineer (SOE)/On-Site Emergency Coordinator (OSEC) has primary responsibility for evaluating natural emergency conditions and implementing the appropriate emergency response actions set forth in this procedure.
3.0 APPLICABILITY This procedure specifies preparatory actions required of key personnel to identify selected emergency functions before or during a natural emergency.
Included among the events classified as natural emergencies are earthquakes, seiches, tornadoes, and associated winds and floods.
This procedure shall be implemented in the event:
a)
A tornado warning or tornado watch is declared.
b)
A seiche is imminent or has occurred.
c)
An earthquake has occurred as indicated by the Strong Motion Recording System.
4.0 INSTRUCTIONS
-CAUTION-RADIATION SAFETY TAKES PRECEDENCE OVER REPAIR OR DAMAGE CONTROL FUNCTIONS 4.1 The SOE assumes the role of the On-Site Emergency Coordinator as necessary and records information on the procedure checklist as information is received.
4.2 As reports are received, determine the need for and activate the Reentry and Rescue Team.
O Page 1 of 3 Revision 1
PMP 2080 EPP.011 FOR TORNADOES
^3 w/
4.3 If notified of a Torn, ado Warning by the Systems Operator:
4.3.1 Verify Emergency Diesel Generators are available, as per Technical Specifications requirements. Take all reasonable steps to return inoperable diesels to service.
4.3.2 Verify diesel-driven pumps are available. Take all reasonable steps to return inoperable diesel-driven pumps to service.
Manual starting capability may be lost if Screen House damage is imminent.
4.3.3 Inspect exterior areas of the plant to ensure that all loose material and equipment are tied down or secured.
4.3.4 Halt irradiated fuel handling and properly store all irradiated fuel.
4.4 Determine whether to continue operating the plant based on capabilities of the plant and plant safety.
NOTE: GO TO STEP 4.11 IF CONDITIONS FOR SEICHES OR EARTHQUAKES DO NOT EXIST.
FOR SEICHES 4.5 Oi Contact the U.S. Coast Guard and meteorological personnel at the nearest weather bureau, per Appendix A, to obtain the latest pertinent meteorological information.
4.6 Call out additional plant personnel to assemble at the plant site for possible emergency action as directed.
4.7 Direct plant operators stationed at key locations in the plant to report any leakage into the plant or of malfunctioning equipment.
4.7.1 If the water level reaches elevation 590' (per control room instrumentation), shut the plant down and start cooldown of the RCS.
4.7.2 If the water level continues to rise, start emergency diesel generators and stand by for a rapid shutdown of the plant.
NOTE:
GO TO STEP 4.11 IF EARTHQUAKE CONDITIONS ARE NOT NET.
FOR EARTHQUAKES When the event indicator on the Strong Motion Recording System changes from black to white, the recording system has been actuated by remote starter unit. This signifies that the ground acceleration threshold has been exceeded.
Page 2 of 3 Revision 1
s.
PNP 2080 EPP.011 4.8 Initiate PMP 2080 EPP.001, Emergency Plan Activation and O
Condition Classification, and classify the event as per ECC-3.
4.9 Conduct a comprehensive physical inspection of the plant per Procedure 4023.001.012.
4.10 Trip the reactor if there is any significant observable damage to the plant or surrounding structures.
Initiate plant cooldown at the maximum rate.
4.11 Log the events and the emergency action taken.
4.15 Refer to PMP 2080 EPP.001 and continue to review Emergency Action Levels.
4.13 When conditions stabilize and units are safe, terminate this procedure.
t 9
1 i
i i
l i
l l
O Page 3 of 3 Revision 1
J I
INDIANA & MICHIGAN ELECTRIC COMPANY' DONALD. C. COOK NUCLEAR PLANT PROCEDURE COVER SHEET Proceuvre No. FhP 2082 EPP.009 Revision No. 2 TITII MAINTENANCE OF THE EMERGENCY PLAN PROCEDURES SCOPE OF REVISION Rev.1 - Minor changes.
Rev. 2 - Revised to agree with present commitments.
JCR
-I NOV 161982 0
1 SIGNATURES ORIGINAL Rev.I REV.2 Rev.S '
PREPARED BY 79, AI g ASSURANCE
[J O~
O' INTERFACING DEPARTMENT /['N. A.
M/h HEAD CONCURRENCE
(
DEPARTMENT HEAD U
APPROVAL N.A.
u.4.
gA h
S rEry MMrrrEE P
"^"^
AP OVAL Gf "
b$
NJ Mh'
/
N
~
DATE OP ISSUE 3-31-81
( G-FR //-/5-84 O
Form No. PMI 20101. may, s
,\\ ~ '
L ST OF EFFECTIVE PAGES O
Page Numbers Revision Number and Date Page 1 of 5 Revision 2 15-82 Page 2 of 5 EXHIBIT A Revision 2 15-82 Page 3 of 5 EXHIBIT A Revision 2 15-82 Page 4 of 5 EXHIBIT B Revision 2 15-82 Page 5 of 5 EXHIBIT C Revision 2 15-82 t
i 4
t i
f i
i 1
i s
e (4
'I i
s p
[
s l
Page 1 of 1
-s Revision 2, 11-15-82 s
.-a.
e~
PMP 2082 EPP.009 INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT MAINTENANCE OF THE EMERGENCY PLAN PROCEDURES 1.0 OBJECTIVE This procedure defines periodic checks to insure the Emergency Plan Procedures are maintained up to date.
2.0 RESPONSIBILITIES The Plant Manager is responsible for ensuring the checklists included in this procedure are completed at the proper intervals.
The Information and Records Center will retain these checklests for the current year, and for the previous year.
The Plant Emergency Planning Coordinator is responsible for accomplishing Emergency Plan Procedure changes and updates on a continuing basis and coordinating the annual PNSRC Emergency Plan Procedure reviev and approval.
4.0 INSTRUCTIONS n
The I'lant Manager shall ensure that:
4.1 The checklists cited below are completed as per the specified interval.
4.1.1 EXHIBIT A, EMERGENCY PREPAREDNESS ANNUAL CHECKLIST 4.1.2 EXHIBIT B, EMERGENCY PREPAREDNESS SEMI-ANNUAL CHECKLIST.
4.1.3 EXHIBIT C, EMERGENCY PREPAREDNESS QUARTERLY CHECKLIST.
4.2 Arrangements are made for an independent audit, annually, of emergency preparedness. This audit shall include but not be limited to:
4.2.1 The Emergency Plan 4.2.2 The Emergency Plan Procedures 4.2.3 Training 4.2.4 Drills and Exercises 4.2.5 Facilities and Equipment 4.3 The Emergency Plan Procedures are reviewed at least annually by the PNSRC to ensure their applicability.
O Page 1 of 5 Revision 2,
1 PMP 2082 EPP.009 EXHIBIT A O
EMERGENCY PREPAREDNESS ANNUAL CHECKLIST
\\_s Date Initiated Date Completed Review Item.=:
Source documents have been reviewed for changes and EPP updated as necessary; (e.g., Reg. Guides, 10 CFR 20)
Remarks:
Plant Emergency Planning Date Coordinator Referenced Health Physics Procedures have been reviewed,'and all recent changes are reflected in the Emergency Plan Procedures.
Plant Radiation Protection Date Supe rvisor
()~N Reviewed and approved documentation
(
indicating personnel in Emergency Organization have received required training in past year.
Remarks:
Plant Emergency Planning Date Coordinator Reviewed and approved documentation indicating personnel not in the Emergency Organization (including non-badged personnel) have received required training in past year.
Remarks:
Training Supervisor Date Page 2 of 5 Revision 2, O
PMP 2082 EPP.009 EXHIBIT A (CONT.)
Verified letters of agreement with outside agencies are current.
Plant Emergency Planning Date Coordinator i
EPP submitted to PNSRC and Plant Manager i
for annual review.
Remarks:
Plant i.mergency Planning Date Coordinator A
l I
l O
i i
A t
J
}
f l
- O j
Page 3 of 5 Revision 2,
_ -. ~, -. _ -
entactacr ratriatoutss st"1-^**uat catcxt1sr Date Initiated Date Completed Review Items:
Conduct random review of copies of the EPP for content of latest revisions (minimum of 3 manuals, if errors are found review an additional 3, if errors still found, review all manuals).
Plant Emergency Planning
-Date Coordinator Reviewed and resolved discrepancies noted in previous EPP drills.
Remarks:
Plant Emergency Planning Date Coordinator
()
Reviewed EPP for technical content and
- accuracy, i.e., sampling methods, protective measures, significant levels.
Plant Radiation Protection Date Supervisor Page 4 of 5 Revision 2, O
.-e PMP 2082 EPP.009 EXHIBIT C EMERGENCY PREPAREDNESS QUARTERLY CHECKLIST Date Initiated Date Completed Review Items:
Inventories of all equipment listed in Equipment Checklists of PMP 2082 EPP.007 completed.
Plant Radiation Protection Date Supervisor Radiation detection equipment is within required calibration per Health Physics Procedures, and located per inventories.
Plant Radiation Protection Date Supervisor Emergency personnel assignments in
, ( );
PMP 2082 EPP.004 are up to date.
_ Plant Emergency Planning Date Coordinator EOF "0P" drawings and other documentation has been updated.
Accounting Supervisor Date S'
Verified phone listings for key personnel and support agencies.
Accounting Supervisor Date Remarks:
Page 5 of 5 Revision 2,
u...
INDIANA & MICHIGAN ELECTRIC COMPANY DONALD.C. COOK NUCLEAR PLANT O
PROCEDURE C VER SHEET Procedure No. PMP 2081 EPP.022 Revision No. 2 TITLE ACTIVATION AND OPERATION OF THE EMERGENCY OPERATIONS FACILITY SCOPE OF REVISION Rev. 1: Revised the operation of the EOF to a single locatiori as per NRC requirements.
Rev. 2: Revised operation of the E0F to reflect operation at Benton Harbor.
1 DCR
~
NOV 1 G1982 O
SIGNATURES l
ORIGINAL R*V 1 REV.2 Rev.S PREPARED BY f
h, b
U ASSURANCE HEAD CONCURRENCE N.A.
([ t/. A.
d[
INTERFACING DEPARTMENT U
/
6'
.j
,gA.
DEPARTMENT HEAD APPROVAL N.A.
N.A.
gg h
SAFETY ITTEE PLANT MANAGER APPROVAL l-_':
q {1l),,h gjhw'k k
~
N le-f~8k //~/b b DATE OT ISSUE 3-31-81 O
Form No. PW 20101 may. 3 l
m
PMP 2081 EPP.022 LIST bF EFFECTIVE PAGES O
PAGE NUMBER REVISION NUMBER AND DATE Page 1 of 5 Revision 2, 11-15-82 Page 2 of 5 Revision 2, 11-15-82 Page 3 of 5 Revision 2, 11-15-82 4
l Page 4 of 5 Revision 2, 11-15-82 Page 5 of 5 Revision 2, 11-15-82 EXHIBIT A Page 1 of 1 Revision 2, 11-15-82 d
l l
0 t
1 l
l i
i i O Page 1 of 1 Rev. 1, 11-15-82 4
--,---m
,.-.,.,,.,,,..-.,.n-,
,.,._e,....,--en--
e.
PMP 2081 EPP.022 INDIANA'& MICHIGAN ELECTRIC COMPANY
(,g DONALD C. COOK NUCLEAR PLANT
/
ACTIVATION AND OPERATION OF THE EMERGENCY OPERATIONS FACILITY 1.0 OBJECTIVE 1.1 This procedure defines the responsibilities of individuals in the Emergency Operations Facility (EOF);
the interfaces of the EOF with other centers and organizations; the operation of the EOF during short-term en.ergency response; and the staffing necessary to carry out these functions.
2.0 RESPONSIBILITIES AND FUNCTIONS 2.1 Responsibilities - See Exhibit A for the Emergency Operations Facility Organization.
2.1.1 Radiation Control and Waste Handling Manager (RCWHM):
Assistant Plant Manager 2.1.2 Communications Director:
Production Supervisor, Technical
()
2.1.3 Communications Personnel:
Training Instructors, Performance Engineers, Operations Quality Control Implementation Coordinators 2.1.4 Radiological Assessment Director:
R.P.
Performance Engineer 2.1.5 Radiation Protection Manager:
Plant Radiation Protection Supervisor
(
l 2.2 Functions - The EOF, upon activation, will assume responsibility for performing the following functions:
1 2.2.1 Management of overall I&M response 2.2.2 Coordination of radiological and environmental assessment r
l 2.2.3 Determination of recommended public protective actions 2.2.4 Coordination of emergency response activities f
with Berrien County, the State of Michigan, l
and the Federal Government.
O Page 1 of 5 Rev. 2 1
4 PMP 2081 EPP.022 2.3 The Emergency Operations Facility is a support facility
(_j) established for the purpose of performing the above functions.
The EOF shall have appropriate technical data information and plant records to assist in the diagnosis of plant conditions to evaluate the potential or actual release of radioactive materials to the environment.
An Assistant Plant Manager in this center shall organize and manage I&M support (dose assessment, communication, and radiation protection) resources to support the TSC and control room operators.
3.0 LIMITATIONS AND PRECAUTIONS 3.1 The Emergency Operations Facility shall be activated as necessary for any emergency condition and specifically for Site Emergencies and General Emergencies.
This procedure covers the operation of the EOF until establishment of the AEP Emergency Response Organization on-site and/or until deactivation of the EOF.
4.0 INSTRUCTIONS 4.1 Upon recognition of the need for, or desirability of activating the EOF, the On-Site Emergency Coordinator (g
shall direct the Communications Director to initiate q,/
PMP 2080 EPP.008, Initiating Manning of Emergency Response Facilities and Calling Off-Duty Plant Personnel for the purpose of staffing the EOF.
4.2 Security Personnel are expected to be the first to arrive at the EOF.
Upon arrival, they should perform the following:
4.2.1 Unlock the EOF.
4.2.2 Turn on the radiation monitor.
Instructions are posted on the monitor.
4.2.3 Turn on the copier machine.
4.2.4 Establish a log of personnel in the EOF by logging the arrival and departure of all personnel.
(
i l
Page 2 of 5 Rev. 2
t PMP 2081 EPP.022 4.3 The Radiation Control and Waste Handling Manager shall r s) manage I&M support actrivities (dose assessment,
(_
communications, and radiation protection) from the EOF, and interface with the On-Site Emergency Coordinator.
Specifically, the RCWHM shall:
4.3.1 Oversee activation of the EOF.
See Emergency Plan Procedures, Appendix A, for work space assignments and telephone number.
4.3.2 Establish communications directly as needed, with the OSEC for the purpose of managing I&M response to the event.
4.3.3 Ensure the EOF assumes responsibility for communication with off-site organizations.
4.3.4 Ensure the EOF assumes dose assessment and protective action decision-making responsibilities.
NOTE:
See PMP 2081 EPP.003, Follow-Up Off-Site Communications, for the conditions and procedure for transfer of communications and dose assessment to the EOF from the TSC.
()
4.3.5 Coordinate I&M and Federal, State, and local response to the event via:
4.3.5.1 Information passed both ways through the communicators.
4.3.5.2 Providing a location for Berrien County, State of Michigan, FEMA, NRC, and AEPSC personnel to 1
coordinate activities.
4.3.6 Complete the top portion of PMP 2081 EPP.020, Exhibit C, for use by the Radiological Assessment Director.
4.3.7 Ensure Exhibit C is normally developed every l
15 minutes.
Approve Exhibit C upon I
completion and prior to release to off-site organizations.
4.3.8 Remain cognizant of the activities of the Radiation Protection Manager in response to the emergency.
4.3.9 Ensure that security controls are established at the EOF.
u Page 3 of 5 Rev. 2 i
t I
p
(
PMP 2081 EPP.022 4.4 The Communicstions Director shall perform the following g
functions-v 4.4.1 Establish a chronological history log of events and make this log available to communications, dose assessment, radiation protection, and other EOF personnel.
4.4.2 Ensure that detailed event data, PMP 2081 EPP.020, Exhibit B, is made available regularly to communications, dose assessment, and radiation protection personnel.
Normally this data will be provided every fifteen minutes by telecopier from the TSC.
4.4.3 Ensure the communicators, dose assessment, and radiation protection personnel are brought up-to-date regarding event data and information required to perform their functions.
4.4.4 Establish communication with the Berrien County Sheriff's Department, Michigan State Police, Nuclear Regulatory Commission (Emergency Notification System and Health Physics Network), American Electric Power Initial Assessment Group, and Public Affairs.
O Assume responsibility for this function from the TSC.
4.4.5 Assume responsibility for the dose assessment and radiation protection function from the TSC.
4.4.6 Communicate requests from off-site groups to the Technical Director.
4.5 The Radiological Assessment Director is responsible for:
4.5.1 Performing dose calculations for on-site and off-site areas and reporting these results to the Communications Director and Radiation Control and Waste Handling Manager.
4.5.2 Recommending protective actions on-site and off-site when appropriate.
O Page 4 of 5 Rev. 2
e PMP 2081 EPP.022 4.6 The Radiatioh Protection Manager is responsible for:
'~'
4.6.1 Implementing the emergency radiation protection program including personnel monitoring and decontamination.
4.6.2 Directing activities of Radiation Monitoring teams and reporting results to the Radiation Control and Waste Handling Manager.
4.6.3 Directing the activities of Re-entry and Rescue teams, as appropriate.
4.6.4 Coordinating first-aid activities.
O i
l i
{
L O-Page 5 of 5 Rev. 2
PMP-2081-EPP.022 4,
EXHIBIT A i
e :..
a r-ybi a:
r :? !
i r.
.====
z i,
,E
- -i
.m i ei iz s
3 E
- I l, i,i 3
c
-lsV_.(.
=_
m g'
= E a s
E
= =_ _
o __
E
, =,
i_.1-l s
1
-rl a r
r E,
~
58E E
ass:
=
s I-1:J' E
2 r
.. y as.
al.
_ggy-_-__---....
s 1
5:f:l I
- s.
i b
t :
i 1
t' e
i
_a ! l.l l*
i i
i E
l s
L@M i
O i
E v
i g
w e
i g
E 3
1 5
E i
-i.g i
g D
E
_=
Eau i
i
._s i
El,a!
i tl Ih dgI3 i
3
- z.=
_=.
i i
i l
l 1
.._----..-...........-L..--..----
c.
i
-_E I
i
,t,' p, - - _ - - - - - - - i t m'.r
=
I I
E a
y g
- e. -
i ti1 s
g
- e a
ser
._E_
- ' ~[
[
-,y 2..
Page 1.of 1
- =
Rev. 2,
INDIANA & MICHIGAN POWER COMPANY DONALD C'.
COOK NUCLEAR PLANT PLANT MANAGER DROCEDURE Index 7$ g g RevisionNo.j Cc=ents Identification Numcer Anc Date i PMP 2080 EPP.001 Emergency Plan Activation Revision 3 and Condition Classification 10-12-82 EPP.002 Unusual Event CANCELLED 10-29-81 EPP.003 Alert CANCELLED 10-29-81 EPP.004 Site Emergency CANCELLED 10-29-81 qL)
EPP.005 General Emergency CANCELLED 10-29-81 EPP.006 Initial Dose Assessment Revision 3 (Gaseous) 8-27-82 EPP.007 Initial Release Assessments Revision 0 TP-1,2-23-82 Exp NA (Liquid) 4-1-81 EPP.008 Initiating Manning of Emer-Revision 3 gency Response Facilities 10-12-82
& Calling Off-Duty Personnel iPP.009 Fire Emergency Guidelines Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines Revision 1 6-2-82 EPP.011 Natural Emergency Guidelines Revisiori 1 11-15-82 l
EPP.012 Initial Off-Site Notificatior Revision 2 10-19-82 i
I l
Dr
'd Page 1
Rev. Oa e 11-Ib-EE i
PMP EPP INDEX INDIANA &MICHIGANPOWERCOMPANY f]
DONALD C. COOK 1;UCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification evsionNc.!
Ti tle Comments Number And Date l l
PMP 2081 EPP.014 Off-Site Dose Assessments Revision 1 10-12-82 EPP.015 Sampling and Analysis of Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP.017 Interpretation of Liquid Rev.ision 0 and Gaseous Samples 4-1-81 EPP.018 Transportation Accidents Revision 1 Involving Radioactive 6-24-82
{3 Material EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-83 Management EPP.020 Activation and Operation of Revision 1 TP-1,9-9-82 Exp NA the Technical Support Center 8-24-82 (TSC)
EPP.021 Activation and Operation of Revision 1 the Operations Staging Area 5-25-82 (0SA) and Personnel Accountability EPP.022 Activation and Operation of Revision 2 i
l the Emergency Operations 11-15-82 Facility EPP.023 Activation and Operation of CANCELLED the Emergency Control Center 6-4-82 (ECC) (An Emergency Operations Facility)
EPP.024 Activation and Operation of Revision 1 the Joint Public Infomation 6-24-82 3
C Center (JPIC) (An Emergency Operations Facility) p3;g_
3 Rev. Data ll-/6-E2.
PMP EPP INDEX INDIANA &MICHIGANPOWERCOMPANY p.,
U DONALD C.. COOK' NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Revision No.1
.. tI *
'0* *"U3
'I Numt:er And Date i PMP 2082 EPP.001 Emergency Exposure Guidelines Revision 0 4-1-81 EPP.002 Public Information Dissemin-Revision 0 ation 4-1-81 EPP.003 Maintenance of Emergency Revision 0 Records 4-1-81 EPP.004 Personnel Assignments to Revision 1 Emergency Centers 2-24-82 EPP.005 Tests and Exercises Revision 1 P
6-24-82 EPP.006 Training Revision 0
'4-1-81 EPP.007 Emergency Equipment and Revision 0 Supplies 4-1-81 EPP.008 Maps and Overlays Revision 1 6-24-82 EPP.009 Maintenance of the Emergency Revision 2 Plan Procedures 11-15-82 I