ML20069L406

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-68 Re Underground Cables to Startup Transformers Which May Not Carry full-load Current at Max Site Soil Temp.Initially Reported on 821126.Extension for Submittal of Final Rept to 830510 Requested
ML20069L406
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/12/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23470-BSK, DER-82-68, NUDOCS 8304280193
Download: ML20069L406 (2)


Text

h Diicket No's,.'50-528/529/53 I!EcE;g

!??c.

Arizona Public Service Company PHOENIX. ARIZONA 85036((h PO BOX 21666.

Pil I: 1, April 12, 1983 ANPP-23470-BSK/RgT "hP.l yl; U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria 1.a.ue - Suite 210 Walnut Creek California 94596-5368 o

Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1 Subjcet:

Time ~ Extension For Report - DER 82-68 Al50.'55(e)PotentiallyReportableDeficiencyRelatingto Underground Cables To Startup Transformers May Not Carry i

Full-Load Current At Maximum Site Soil Temperature File:

83-019-026; D.4.33.2 P

f

Reference:

(A) Telephone Conversation between J. Eckhardt and J. Cook on November 26,.1982 (B) ANPP-22521, dated December 13, 1982 (Interim Report)

(C) ANPP-23025, dated February 16, 1983'(Time Extension)

(D) ANPP-23347, dated March 24, 1983-(Time Extension)

Dear' Sir:

- The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), Time Extensions were requested by Reference -(C) and Reference (D).. At that time, it was

~

i estimated that a Final Report would be available by April 14, 1983.

Due to the extensive evaluation required, it is now expected that this information will be finalized by May 10, 1983, when a complete report l

will be submitted.

Theretis no change to the Interim Report at this time.

l 1.

[

Very truly yours, Ct.LL.

q wL E.. E. Van Brunt, Jr.

l APS Vice President j.

Nuclear Projects Management l'

ANPP Project Director EEVB/RQT:db i

cc: See Page 2 l-e &

l u

8304280193 830412

~~

t

}

v I

l PDR ADOCK 05000528 S

PDR

a

.c-4, Mr. D. M. Sternberg

- ANPP-23470-RQT/BSK April 12, 1983 Page 2~

4 cc:

. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission.

Washington, D. C. 20555 T.' G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green 4

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i

t

--