Amends 72 & 51 to Licenses NPF-68 & NPF-81,respectively, Adding Footnotes to TS 3.5.2.d,allowing for Outage Time for Each RHR Pump to Be Extended to 7 Days to Convert Motor Pump Assembly to Coupled Design
ML20069J374
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/31/1994
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Georgia Power Co, Oglethorpe Power Corp, Municipal Electric Authority of Georgia, City of Dalton, GA
Shared Package
ML20069J377 List:
References
NPF-68-A-072, NPF-81-A-051 NUDOCS 9406140342
Download: ML20069J374 (6)


Text

.

l

' s nov a

t UNITED STATES j.

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20566-0001

/

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 72-License No. NPF-68 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated December 30, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules.and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized-by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements l

have been satisfied.

9406140342 940531 gDR ADOCK 05000424

~

PDR 1

s -

2.

Accordingly, the license is hereby amended by a page change to the Technical Specifications ~ as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

NPF-68 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 72

, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license.

GPC shall operate the facility in accordance with the Technical. Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office.of Nuclear Reactor Regulation

Attachment:

Technical Specification Change Date of Issuance: May 31, 1994 i

+

4 4

      • cuq f.

4 UNITED STATES

['Wj NUCLEAR REGULATORY COMMISSION

'f WASHINGTON, D.C. 20555-0001

\\...../

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 51 License No. NPF-81 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 2 (the facility) Facility Operating License No. N;PF-81 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated December 30, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

. 2.

Accordingly, the license is hereby amended by a page change to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

NPF-81 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 51

, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license.

GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David 8. Matthews, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Change Date of Issuance:

May 31, 1994

ATTACHMENT TO LICENSE AMENDMENT NO. 72 FAClllTY OPERATING LICENSE NO. NPF-68 DOCKET NO. 50-424 AND TO LICENSE AMENDMENT NO. 51 FACIllTY OPERATING LICENSE NO. NPF-81 DOCKET NO. 50-425 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

Remove Paae Insert Paae 3/4 5-3 3/4 5-3

~_ -

EMERGENCY CORE COOLING SYSTEMS 3/4.5.2 ECCS SUBSYSTEMS - T GREATER THAN OR E0 VAL TO 350*F m

LIMITING CONDITION FOR OPERATION 3.5.2 Two independent Emergency Core Cooling System (ECCS) subsystems shall be OPERABLE with each subsystem comprised of:

a.

One OPERABLE centrifugal charging pump, b.

One OPERABLE Safety Injection pump, 1

c.

One OPERABLE RHR heat exchanger, j

d.

One OPERABLE RHR** pump, and l

e.

An OPERABLE flow path capable of taking suction from the refueling water storage tank on a Safety Injection signal and semi-l automatically transferring suction to the containment emergency sump during the recirculation phase of operation.

APPLICABILITY: MODES 1, 2, and 3.*

i ACTION:

f a.

With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ** or be in at least HOT STANDBY l

1 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT ~ SHUTDOWN within the following i

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

l b.

In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and submitted to the. Commission pursuant to Specification 6.8.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date. The current value of the usage.

factor for each affected Safety Injection nozzle shall be provided in -

this Special Report whenever its value exceeds 0.70.

l l

t The provisions of Specifications 3.0.4 and 4.0.4 are not applicable for i

entry into MODE 3 for the Safety Injection Pumps declared inoperable pursuant to Specification 3.5.3.2 provided the Safety Injection Pumps are restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or prior to the temperature of one or more of the RCS cold legs exceeding 375'F, whichever occurs first.

The allowable outage time' for each RHR pump may be extended to 7 days for the purpose of converting the pump motor assembly to a coupled design.

This exception may only be used one time per pump and is not valid after December 31, 1994.

3 V0GTLE UNITS - 1 & 2.

3/4 5-3 Amendment No. 72 (Unit _1)

Amendment No. 51 (Unit 2)

.