OPU Nuc!eair NUCIMr 100 Interpace Parkway Parsippany. New Jersey 07054 201 263-G500 TELEX 136-482 Writer's Direct Dial Number:
October 12, 1982 bir. Dennis bl. Crutchfield, Chief Operating Reactor Branch #5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear bir. Crutchfield:
SUBJECT:
Oyster Creek Nuclear Generating Station Operating License No. DPR-16 Docket No. 50-219 GPUN Operational Quality Assurance Plan Enclosed please find ten (10) copics of the GPUN Operational Quality Assurance Plan for Oyster Creek and "D!I-1 Nuclear Stations. This document replaces in its entirety the existing Oyster Creek OQA Plan (Rev. 5) and describes the formal and comprehensive plan which has been established to assure compliance with 10CFR 50, Appendix B; 10CFR 71, Appendix E and applicable Regulatory Guides.
The changes to the Oyster Creek OQA Plan from Rev. 5 include the following:
1.
The reporting authority of the chemistry and metallurgical laboratory has been changed from the Vice President Nuclear Assurance to the Vice President Technical Functions.
2.
The titic of Flaterials Technology has been changed to Special Processes and Programs.
3.
The Planager - QA Design and Procurement and the blanager - QA blod/
Ops are now both responsible to " review engineering specifications and procurement documents-- " depending upon where these documents are originated.
4.
The Safety review process i.e.,10SPG has been changed to be con-sistent with the TF1I Technical Specifications.
5.
The Regulatory Guide positions changed as follows:
(a) Combining the positions taken in the TF11 and the Oyster Creek QA Plans.
(b)
Identifying additional positions or clarifications to Regulatory g
Guide 1.37, 1.38, 1.54 and 1.123.
gg 8210250092 821012 g[
/pdh PDR ADOCK 05000219 pf f.
P PDR ghp GPU Nuclear is a part of the General Public Utilities System j
Mr. Dennis Crutchfield October 12,1982 (c) Updating ANSI N18.1 from 1971 to 1978.
(d) Adding our position on Regulatory Guide 1.142 (NRC accepted) which previously was not included.
(c) Deleting from the appendix Regulatory Guides 1.29 and 1.63 since they do not include QA program requirements.
Because of these changes, revisions to existing procedures and training of appropriate personnel will be necessary before full implementation is -
achieved. Therefore, full implementation will not be achieved until the end
[-
of this year. The currently approved Operational QA Plan will remain in i
effect urtil full implementation is achieved.
Sincerely, eter B. Fiedler Vice President and Director - Oyster Creek b1f Enclosure cc: Ronald C. Ilaynes, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l
NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 J