GENERAL OFFICE P.O. box 499 COLUMBUS. NEBRASKA 68601-0499 ras a IC OWer flCg TELEesoNe (4023 ss4-85si LQA8300100 March 2, 1983
(
,}
c I
i-MAR - 91983 j
Mr. John T. Collins i
Regional Administrator b
U.S. Nuclear Regulatory Commission l
Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011
Subject:
Cooper Nuclear Station Quality Assurance Program NRC Docket No. 50-298, DPR-46
Dear Mr. Collins:
In accordance with 10CFR50.54(a) issued in the January 10, 1983, Federal Register, this is to inform you that the Cooper Nuclear Station Quality i
Assurance Program has been incorporated into the Updated Final Safety Analysis Report (USAR) as Appendix D and submitted January 19, 1982.
l This latest revision of the QA Program is marked as Revision O to be consistent with other portions of the USAR.
l Attached is a list of the changes made and submitted as Appendix D to the USAR.
"'he changes are minor in nature and primarily reflect reorgani-zation of
'perating staff by the NPPD Board of Directors. Portions of this rev n are currently being evaluated by engineering but do not appear to rept sent a reduction in the present approved OA program scope which was appro red by the staff in December,1979.
Sincerely,
(
Jay Pilant Division Manager of Licensing and Quality Assurance FEW:dm
\\
e Attachment 8304120369 830302 PDR ADOCK 05000298 P
PDR t
a M.
- g; Y
?\\
'.[
"3 '
~
' ATTACHMENT A-
[ ;,
^i. ~ Position titles were changed.due to a reorganization directed.byLthe NPPD-
-l Board of. Directors.-
'2. ;Page D-2-1l established the General Manager responsible'for implementation.
3.
.Page.D-2-2 revised Figure'I to reflect new organization.
4.
CNS Engineering updated. Table I, resulted in deletion of the following:
.a.
' Steam separator
- b. = Steam dryer c.
Neutron source d.
Tip e.
Rod position information f.
Fuel pool cooling and cleanup g.
' Liquid process radiation monitoring h.
Reactor' building closed cooling water
- i. Class I, II and III code items.
- j. Reactor feed pumps (pressure retaining parts only) k.
Reactor building H & V Pages"D-2-15 and D-2-16 Presently CNS Engineering, in conjunction with the CNS'QA Staff /-isz
- performing an engineering evaluation to confirm the ' acceptability of -
d changing the safety classification on these systems.. This evaluation-will be-completed prior to April 15, 1983.
5.
Page-D-2-3 title change - Division' Manager, Licensing.& Quality Assurance.
6.
Revised Figure I to show new po,sitions established by'NPPD. Board of; Directors. This reorganization 'resulted 'in an additional; level-of manage--~
menb between QA and the ~ General Manager's office, Page D-2-2.
7.
Page D-2-12 title change - Division-Manager, Power Operations.
L 8.
Page D-2-12 title change - Senior Division Manager, Power' Operations'.
9.
Page.D-2-13 deleted "Ouality. Assurance instructions will requireLscheduled' and' unannounced inspection"1from first sentence,;second paragraph..(No chang'e in NPPD' conunitment.)
10.
Page'D-2-13 revised third and fourth sentencesIto conform with the guide-'
lines - ~estiablishedlin 'QAI-5; '" General' Guidelines - Ouality Assurance Audits.."
1(No. change in NPPD commitment.):
-11.
Page;D-2-17.'to D-2-18; corrected Table 2.-
10CFR50.AppendixLD'- Cross.
' Reference Tabulation.
' ' ' ' ~
_ g
- 12.. :( Updated Table 2, E Page iD-2-20.;
~
"C 13'._ PageiD-3-1; title change - Senior' Division' Manager,cPower Operations..
y e
1 r
' (14.
Page'D-3-2 title __chEngel-(Division Manager'. Lidensing &_Ouall'ty:A'ssurance.1 p
~..
~..
s 4.15a.. Page 'D 2 ; title changeL-1 Senior Division. Manager,1 Power Operations.
w e
e i.-
~
...i 3
"~- '
'y
.'c'_'.
=
3 l
k "g
'47' 5.
16a. Page D-3-4 title change - Division Manager, Licensing & Quality Assurance; Division Manager, Power Operations; Senior Division Manager, Power Operations.
b.
" Designated Quality Assurance Specialist" - third sentence, fifth paragraph.
c.
Position of Licensing & Quality Assurance Coordinator has been eliminated and responsibilities and dutier,of that position have been assigned to the-Administrative Secretary, Lieunsing & Quality Assurance.-
17a.
Page D-3-5 title change - Division Manager, Power Projects.
b.
Page D-3-5 added "and plant modifications" to first sentence, second paragraph.
18.
Page D-3-5 title change - Division Manager, Power Operations.
19.
Page D-3-7 minor sentence ~ change; no effect on commitment.
20.
Page D-4-1 title change - Division Manager, Licensing & Quality Assurance.
21.
Page D-4-3 title change - Division Manager, Licensing & Ouality Assurance.
- 22. ' Page D-4-3 added QAI-17, Guidelines for Indoctrination and. Training of QA Personnel.
4 23.
Page D-4-4 added 1) QAP-2000, NRC Reporting and Responding Activities;
- 2) QAP-2100, Document Control (formerly part of QAP-200); and 3).QAP-2200, SRAB Activities.
24.
Page D-4-5 title change - Senior Division Manager, Power Operations.
25.
Page D-4-6 title change - Division Manager, Licensing &-Quality Assurance.
26.
Page D-5-1 title change - Senior Division Manager, Power Operations.
27.
Page D-7-1 changed N45.2.12 and N45.2.13 from latest draft to 1974 editions.