ML20069G272
| ML20069G272 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/11/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20069G263 | List: |
| References | |
| NUDOCS 8303250095 | |
| Download: ML20069G272 (2) | |
Text
!
.e e
DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE, N.C. 28242 HALH. TUCKER-TELEPf40NE vne perstnawv (704) 373-4501 March 11, 1983
.m e...no-c" "
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Enclosed for NRC Staff use and review are two copies of Revision 10 (dated February 1983) for the McGuire Nuclear Station Emergency Plan. These should-be incorporated into your Emergency Plan mauuals removing any earlier version pages of this plan.
bycopyofthisletter,onecopyoftheabovedocumentisbeingprovidedto the NRC, Region II.
Very truly yours, S.
Hal B. Tucker WHM/php Enclosure cc:
(w/1 copy of enclosure)
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 (w/o enclosure) i Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station 1
e 0303250095 830321 PDR ADOCK 05000369 F
PDR i
I L
SECTION REMOVE PAGES INSET NEW PAGES Cover Sheet Cover Sheet Cover Sheet B
B-1.1 B-1.1 D
D-1.1, D-1.2, D
'.3, D-1.4, D-1.1, D-1.2, D-1.3, D-1.4, D-2.1, D-2.2, D-2,3, D-2,4, D-2.1, D-2.2, D-2.3, D-2.4, D-2.5, D-3.1, D-3.2, D-3.3.
D-2.3, D-3.1, D-3.2, D-3.3, D-3.5, D-4.1, D-4.4, D-4.5, D-3.5, D-4.1, D-4.4, D-4.5, Q
Q-6.1, Q-6.3, Q-6.4 Q-6.1, Q-6.3, Q-6.4 NOTE: In Section D, Pages D-3.4, D-4.2, D-4.3 and D-4.6 are not affected by this revision. Do not renove from your manuals.
I l
s l
~
I l
I l
~..
I
~
l l
l y- ~.
1 i
x__,'
DOMNb g-
= = = : -nannn,1m g
ripyyn w or - -----
.