ML20069F386

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amends 94 & 31 to Licenses DPR-57 & NPF-5,respectively
ML20069F386
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/11/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20069F378 List:
References
TAC-47387, TAC-47388, NUDOCS 8303220468
Download: ML20069F386 (2)


Text

-

I 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-321 AND 50-366 GEORGIA POWER COMPANY, ET AL.

NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments Nos. 94 and 31 to Facility Operating Licenses Nos. DPR-57 and NPF-5, issued to Georgia Power Company, Oglethorpe Power Corporation, fiunicipal Electric Authority of Georgia, and City of Dalton, Georgia, which revised Technical Specifi-cations for operation of the Edwin I. Hatch Nuclear Plant, Units Nos.1 and 2 (the facility) located in ApDling County, Georgia. The amendments are effective as of the date of issuance.

These amendments revise the Appendix B Environmental Technical

~

Specifications to delete nonradiological water quality-related requirement's, as required by the Federal Water Pollution Control Act Amendments of 1972;land to delete "the aeilai e'r'os' ion control. surveys._ _

~

of the Hatch Nuclear Plant-Bonnaire transmission corridor.

The application for th amendments compli~es with the standards and requirements of the Atomic Energy Act of 1954, as amended-(the Act), and the Commission's rules and regulations. The Commission has made appropriate.

I findings as required by the Act and the Commission's rules and regulations

{

f in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

830322046By y h PDR ADOCK PDR P

Il

7590-01

, The Commission has determined that the deletion of water-quality requirements is a ministerial action required as a matter of law and will not result in any significant environmental impact; that the deletion of aerial erosion surveys will not result in any significant environmental impact; and.that pursuant to 10 CFR' Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with these actions.

For further details with respect to this action, see (1) the application for amendments dated October 30,1981,(2) Amendments Nos. 94 and 1 to 3

Licenses Nos. OPR-57 and NPF-5, and (3) the Commission's letter to Georgia Power Company dated March'll,1983. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Appling Cmunty Public Library, 301 City Hall Drive, i

Baxley, Georgia 31513. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, I

Washington, D.C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this lith day of March 1983.

THE NUCLEAR REGU TORY COMMISSION ohn 7. Stolz, Chief ating Reactors Brand #4 D vision of Licensing l