Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207G2961986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133N6201985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program 05000286/LER-1994-010, :on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised1994-11-0707 November 1994
- on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised
ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20044B8461993-03-0404 March 1993 Part 21 Rept Re Possible Safety Implications in Motor Operated Valve Evaluation Software Program Re Use of Total Thrust Multiplier.Utils Advised of Problem & Recommended Corrective Action in Encl Customer Bulletin 92-06 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program JPN-90-035, New York Power Authority Annual Rept for 19891989-12-31031 December 1989 New York Power Authority Annual Rept for 1989 ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 05000286/LER-1989-013-01, :on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities1989-07-28028 July 1989
- on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities
ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point 05000286/LER-1989-007, :on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained1989-04-17017 April 1989
- on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained
ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept 05000286/LER-1989-001, :on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded1989-03-0303 March 1989
- on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded
ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed 05000286/LER-1989-003-01, :on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed1989-02-23023 February 1989
- on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed
ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 1999-02-09
[Table view] |
Text
-.
t l
a I
OPERATING DATA REPORT DOCKET NO.
DATE 1/7/R7 COh!PLETED DY P
P Pich TELEPilONE 914-525-5155 OPERATING ST ATUS
- 1. Unit Name:
Ni= D m i n +- r?-it ??
- 2. Reporting Period:
Pr>hronry 1oA2
- 3. Licensed Thermal Power t. twt): 2758
\\
1013
- 4. Nameplate Rating (Groos NtWe):
- 5. Design Electrical Rating (Net 5the): 8 73 900
- 6. Maximum Dependable Capacity (Gross 31We):
864
- 7. Maximum Dependable Capacity (Net 31We):
- 8. If Changes Occur in Capacity Ratings t' Items Number 3 Throu;;h 7) Since Last Report. Give Reasons:
no changes none
- 9. Power LevelTo which Restricted.If Any(Net AfWei:
N/6
- 10. Reasons for Restrictions.If Any:
His 51onth Yr.-to-Date Cumulative II. Hours In Reporting Period 347.20 1018.90 4917s 4g
- 12. Number Of flours Reactor Was Critical 6.88 6.88 1585.39
- 13. Reactor Resene Shutdown liours 206.33 728.68 47567.98
- 14. Hours Generater On-Line O
n n
- 15. Unit Resene Shutdown llours 554358_
1679R97 19711ggg1
- 16. Gross Thermal Energy Generated (51Wl:)
- 17. Gross Electrical Energy Generated (51Wii) 1736.30.
518430 3RO21196 158961 481616 36211673
- 18. Net Electrical Energy Generated (51WH) 30.7 51.5 62.6
- 19. Unit Senice Factor 30.7 51.5 62.6
- 20. Unit Availability Factor 27.4 ao_a c: c: _4
- 21. Unit Capacity Factor (Using 31DC Neti 27.1 19_O qa_g
- 22. Unit Capacity FactoriUsing DER Net) 35.9 24.5 10.1
- 23. Unit Forced Outage flate
- 24. Shutdowns Scheduled Oser Next 6 Stonths(Type.Date.and Duration of Each1:
- NONE -
- 25. If Shut Down At End Of Reimrt Period. Estimated Date of Startup:
Fneecast Achieved
- 26. Units in Test Status tPrior o Commercial Operationi:
INill \\L CitillCAlllY
\\
N/A INill AL 1 LLC litlCI T Y
\\
\\
CO\\l\\ll RCI A1 Ol'I'll ATION N
8303220297 830315 19/771 DR ADOCK 05000247 PDR
o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.90-247 I.P Unit 2 UNIT 3/8/83 DATE E.
F.
Eich
- ~ ~ ~
., COMPLETED BY 914-526-5155 TELEPHONE biONDi Fehm'-v 1427
. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NeO (MWe-Net) i I
0 O
17 2
O gg 0
3 0
39 0
4 0
20 0
5 0
21 737 0
g O
848 23 8
0 24 945 9
0 25 849 10 0
26 849 11 0
27 848 12 0
28 843 13 0
29 0
14 30 132 3:
16 136 INSTRUCTIONS On this fornut. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute o the nearest whole nwgawatt.
07/77)
UNITSHUlDOWNS AND POWER REDUCTIONS
. DOCKET NO.
50-247 UNIT NAME I.P Unit 2 DATE
,ea e--
COMP TE
<Y REPORT MON 11{
February 1983 i" '
ELEPHON'E 219-a40-3132 "i
.! ?
3 Ik 1.icensee
[*t b
Cause & Correceive E%
--o o
L.
D.ste g
g g
.g g &
Event uy 3
Action to F
g$ 5 55g Report it iE G
$U Present Recurrence
~
u
,o 5
a30131 S
350.0 2A 1
None CB Pump Xy Unit shut down'to repair No. 23 x
Reactor Coolant Pump Seal 6
330216 F
115.65 A
3 None HA Turbin-Unit trip - Main turbine redundant overspeed protection system malfunction.
I 2
3 4
F: l'os ced Reason:
Method:
1 xhibit G - Instructions S: Scheduled A l quipment Failure (Explain) l-Manual for Prcp. nato.n of D.sta B-Maintenance of Test 2-Manual Scram.
Entry Shects f or 1.itenste C Ret'ucling 3-Automatic Scram.
Event Rep.nlll.l.R l'al. int RI G-D Regularory Restreetion 4-Oth :: (Explain) 0161i E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Eshibit I - Same Source c3/77)-
Il-Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-247
~~~
Date:
3/10/83 Completed by:
J. Curry Telephone No:
(914) 526-5215 Indian Point Unit No.
2 began the month of February in the cold shutdown condition to permit repaire of No. 23 reactor coolant pump seal.
Disassembly of the controlled leakage seal package revealed excessive wear of seal components.
After the seal package was replaced a successful system hydrostatic test was performed at 2385 psig.
During the reactor coolant pump outage, non-critical path nuclear and conventional. maintenance was performed.
This included replacement of the 6900,
volt breaker for No.
23 reactor coolant pump which failed during the first five minute pump run.
Return of the Unit to service was delayed due to insufficient main tur binej bearing lift oil pressure and excessive packing gland leakage from residual heat removal'. system loop isolation valve No. 731.
This leakage on February 13 exceeded the Emergency Action Level, therefore a Notification of Unusual Event was declared.. Leakage was brought under the Emergency action Level in under two hours and the NUE was closed.
After startup on February 15, the unit tripped automatically on February 16 due to a malfunction of the main turbine electrical overspeed protection system (IEOPS).
After modifications and design improvements in the IEOPS the unit was returned to service on February 21.
Power was escalated to, and remained at,,100% for the remainder of the report period.
U f
r e
N,
Docket No. 50-247 Date: 3/11/83 Completed by: J. Bahr February, 1983 Mechanical and Electrical Maintenance Indian Point-Unit No. 2 Date Component MWR Malfunction Corrective Action 4
9/13/82 No. 24 4600 FCU out of Shaft bearings and Fan Cooler service coupling replaced.
s Unit (FCU) j i
9/15/82 R-13 4771 R-13 blower Replaced blower Radiation unit seized and motor Monitor 9/20f,_
Air lock 4000 Air lock door Changed latch q'
door on interlock assembly rod.
vapor malfunctiin Moving parts in containment interlock lubricated 10/2/82 No. 21 5085 Stuffing box Adjusted stuffing Eervice rotated shearing box.
Installed Water Pump seal supply line new 1/2 inch stainless steel nipple.
10/4/82 Safety 2533 Valve 839A does Solenoid valve Injection not open upon replaced System CCR signal valve,839A 10/5/82 CVCS 3099 Valve 266 Replaced valve valve 268 leaks past seat bonnet e
10/6/82 CVCS 2798 Diaphragm Valve replaced valve i
malfunction LCV-ll2A 1
10/7/82 cvCS
.?799 Valve leaks New diaphragm
't valve through in shut installed.
No. 357, position l :.
10/8/82 RCS Vent 992 Valve leaks Replacad Valve No.
through diaphracm 516 t
E
-1
~
s 4 5
t -
~.1 s
)
/
~~
/
/
Date Cbmponent MWR Malfunchl n Cchrective Action 10/11/G2 No. 22 5144 Discharge check
-Installed new charging on seal injection piston
j.
hold
,i
~
IG7 valve leaks Replaced valve 10/11/82 CVCS valve,
alo3g valve e,,,
relief sthm No. 264
)'
it 10/12/82 No. 21 and 4275 s Valves leak Removed valve 22.Instru-4300 through bonnets, cleaned ment Air out rust.
Compressor Reinstalled bonnet discharge
~
valves IA-3 & IA-3-1 10/12/82 CVCS relief 498{
y.,
Valve leaks Installed new valve leo.
valve 263 12/11/82 MCC 210 203-6107 Failtire to trip Used spare wires Supply on stripping from two exist'ing Breaker signal cable runs to re-place two wires found open.
10/11/82 23 Accum-202-4363 Indication failed Calibrated mulator low transmitter pressure
& indicator indication, P1936C 11/11/82 23 RCP Seal 202-4150 Indication failed Defective wiring Inlet high at rtd head temperature repaired indication TI-153 10/11/82 21 ECCS 203-4146 Discrepancy Calibrated trans-Accumulator between SBl &
mitter & indicators Pressure SM Panel Indication Indicators 10/11/82 23 ECCS 203-4147 Accumulator Pressure Indication
~
W a+
e*
7 e
gj Date Component MWR Malfunction Corrective Action 10/11/82 22 ECCS 203-4143 Discrepancy Calibrated trans-Accumulator between SBl &
mitter & indicators Pressure
~~"'SM Panel Indication Indicators 10/11/82 23 ECCS 203-4144 Accumulator Imvel Indication l
10/11/82 24 ECCS 203-4145 Accumulator Imvel Indication er e
e r
e
,e
,