Objections & Request for Clarification of Hearing Schedule. Certificate of Svc Encl
ML20069F017
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 03/18/1983
From: Eddleman W
EDDLEMAN, W.
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, NUDOCS 8303220258
Download: ML20069F017 (2)


Text

- _-

UNITED STATES OF AMERICA

.m

~

n.

NUCLEAR BEGULATORY COMMISSION

""'*N3 !bN No:33 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD Glenn O. Bright i."

Dr. James H. Carpenter ~figjD t James L. Kelley, Chairman In the Matter of

) Dockets 50 400 OL CAROLI:iA POWER AND LIGHT CO. et al. ) 50-401 OL (Shearon Harris Nuclear Power Plant, )

Units 1 and 2) )

)

Wells Eddleman's Objections and Request for .

Clarification re Hearing Schedule Purnsuant to the Board's Memorandun and Order dated March 10 '83, served Mhrch 11 and received by me March 16, I ask clarification that on onge h, Item 5, Eddleman 118'is meant, rather than Eddleman 16 (which was not admitted; 116 was), and that DCRDR contentions, if any, on control roon design fall under this deferral.

Please also clarify if the footnote ruling on that nage re l

Eddleman 41 does or does not prevent Applicants fron pursuing discovery ve Eddleman h1 before the end of the snvironnental hearing.

I have much work to do for environnental contentions; it'd best be deferred And please clarify my understanding that where Ann 11 cants pursue summary disposition by discovery, intervenors have discovery of Applicants on the sane contentions. i L

Re the schedule, March 15, 1984 as th'e last day for filing j m8E discovery on safety / management issues seems to assume the environ-EP mental hearing will end January 10 (it connences January h).

U sb og If mn rv 0 those hearings took longer, the discovery date should be put back l m

~

to still be 65 days from the end of the hearing.

na

$< The security plan schedule annears to provide only about 65 i

C$

days,not90,fordiscovery,eventhoughsecurityplancontentions(g[ -

mao would be new. 90 days is better, setting back the schedule 25 days DSQ3

UNITED STATES OF AMERICA NUCLEAR REGULATOPY COMMISSION In the matter of CAROLINA POWER k LIGHT CO. Et al. ) Dockets 50-k00 Shearon Harris Nuclear Power Plant, Units 1 and 2 ) and 50401 0.L.

CERTIFICATE 0F SERVICE -

pts W6 0 ha b /c w 6c A ,Jipv Answer to Staff & Applicants I hereby certify that copies of" aW.E re Revised, Amended and Additiona ontentions based on Eddleman 15 5* "- '

-e with attachment re fluelean fuel HAVE been served this J." 8 day of March 1981 , by deposit in the US Mail, first-class postage prepaid, upon all parties whose names are listed below, except those whose names are arked with an asterisk, for whom service was accomplished by Judges James Kelley, Glenn Bright and James Carpentor (1 copy each)

Atomic Safety and Licensing Board US Nuclear 9egulatory Commission Washington DC 20555 George F. Trowbridge (attorney for Aeplicants)

Shaw, Pittman, Potts & Trowbridge ILuthanne G. Miller 1800 M St. NW ASLB Panel Washington, DC 20036 USNRC Washington DC 2($5 5 Office of the Executive Legal Director Phyllis Lotchin, Ph.D.

Attn Docke ts 50-400/kO10.L. 100 Bridle Run USNRC Chanel Hill NC 2751h Washington DC 20555 Dan Read Docketing and Service Section CEAfE/ELP Attn Docke ts 50-400/h010.L. Box 52h Office of the Secretary Chapel Hill NC 2751h USNBC Wasnington DC 20555 Pat & Slater Newman CANP John Runkle 2309 Weymouth Court CCNC .

Raleigh NC 27612 307 Granville Rd .

Chapel Hill Nc 2751k Bradley W. Jones USNRC Region II Travi.a Payne 101 Marietta St.

Edelstein & Payne Atlanta GA 30303 Box 126E3 Raleigh NC 27605 Richard Wilson, M.D. Certified by h 729 Hunter St.

Apex NC 27502