ML20069E774

From kanterella
Jump to navigation Jump to search
Deficiency Rept DER 83-7 Re Drillco Maxibolt Anchors for safety-related Equipment Improperly Installed Due to Use of Defective Torque/Pressure Gauge.Initially Reported on 830204.Condition Not Reportable Per 10CFR50.55(e)
ML20069E774
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/04/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23175-GHD, DER-83-7, NUDOCS 8303220186
Download: ML20069E774 (2)


Text

Docket Nos. 50-528/529/530 50.55(e) Report pp$.,5, b Arizona Public Service Company pg~ !! f //

Ro BOX 21666. PHOENIX. ARIZONA 85036

/

NI ll: >/

!! arch 4,1983 c /

ANPP-23175sgilD/BSK w, ;.,

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Deficiency Evaluation Report 83-7 A 50.55(c) Report Relating to Drillco " Maxi-Bolt" Anchors For Safety-Related Equipment May Be Improperly Installed Due To Use of Defective Torque / Pressure Gauge File: 83-019-026 D.4.33.2

Reference:

Telephone Conversation between P. Narbut and G. Duckworth February 4,1983

Dear Sir:

The NRC was notified of the subject Deficiency Evaluation in the referenced telephone conversation, with a determination of reportability j

to be made within thirty (30) days (March 4,1983).

The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(c), therefore no written report is required. Necessary documentation of the evaluation will be maintained in APS files.

Very truly yours, Clll 9LLS E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db i

cc: See Attached Page 2 8303220186 830304 DR ADOCK 05000528 g

PDR

a...

U. S. Nuclear Regulatory Commission March 4, 1983 Attention:

Mr. D. M. Sternberg, Chief ANPP-23175-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli