MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
._ __
l VIHOINIA }$LliCTHIC AND }'OWEH COMPANY N ICII M O N D, Yl R O INI A O!)2 61 May 27, 1994 United States Nuclear Regulatory Commission Serial No.94-102 Attention: Document Control Desk NLJRPC R1 Washington, D. C. 20555 Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 10 CFR 73 EXEMPTION REQUEST Pursuant to 10 CFR Part 73.5, Virginia Electric and Power Company requests specific exemptions from the requirements regarding physical protection of licensed activities in nuclear power reactors against radiological sabotage. In particular, we request an exemption from the requirement that authorized individuals not employed by the licensee receive a picture b9dge upon entrance into the protected area and return the badge upon axit from the protected area.
As shown in Attachment 1, the exemption request is based on the alternative which utilizes a hand geometry biometrics system in the process of gaining unescorted access to the protected area at Surry and North Anna Power Stations. The request is further supported by continued use of approved, existing security systems. The intent of 10 CFR 73.55 is more than adequately met by the addition of this dependable personnel identification device in lieu of manual picture badge verification. The change recommended herein will not alter any other plant security feature of the protected area entry process. Furthermore, both employees and contractor personnel will be screened by this means of positive identification.
Approval of this exemption is requested to reduce costs associated with elements of site security which are otherwise routinely performed as part of Virginia Electric and Power Company's Security Plans. We believe that the practice currently required is unnecessarily burdensome given the technology which is now available to ascertain the kjentity of authorized individuals. This request is being submitted as part of our Cost Beneficial Licensing Actions (CBLA) program and complies with NRC guidelines for consideration as a CBLA submittal.
Justification of this exemption request is based on demonstrated performance as evidenced through several assessment mechanisms. These mechanisms include the Systematic Assessments of Licensee Performance and our in-depth Quality AsSJrance Audit Review Program. In addition, we obtain an independent assessment
'~
94 oho 7o5oa94o527 [003 PDR ADOCK 05000280 F PDR '\h
of performance whenever necessary. These components of our program are designed to maintain a high standard of access control and security at both Surry and l North Anna. 1 For these reasons, we conclude that the requested exemption is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest as provided for in 10 CFR 73.5. The appropriate security plan changes will be submitted to the NRC under separate cover pending approval of this exemption.
Very truly yours,
)/-[?(L,--,
J. P. O'Hanlon l Vice President - Nuclear Operations Attachment 1.10 CFR 73 Exemption Request i
a cc: Mr. Stewart D. Ebneter U. S. Nuclear Regulatory Commission !
Region ll l
101 Marietta Street. N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch l NRC Senior Resident inspector l Surry Power Station l
l Mr. R. D. McWhorter i NRC Senior Resident inspector l North Anna Power Station l
i Mr. Joe Colvin l Nuclear Energy Institute 1776 Eye Street, N. W.
Suite 300 Washington, D. C. 20006-2496 l
1 l 1 l
._ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ ._ ._ _ _J
1 i
, l 1
ATTACHMENT 1 !
SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 l 10CFR73 EXEMPTION REQUEST EXEMPTION REQUEST
SUMMARY
Virginia Electric and Power Company requests, in accordance with the provisions of 10 CFR 73.5, " Specific exemptions," an exemption from certain requirements of 10 CFR 73.55, " Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage." This exemption request is submitted for Surry Power Station Units 1 and 2 and North Anna Power Station Units 1 and 2.
Specifically, we request exemption from the portion of 10 CFR 73.55(d)(5) which states, "An individual not employed by the licensee but who requires frequent and extended access to protected and vital areas may be authorized access to such areas without escort provided that he receives a picture badge upon entrance into the protected area which must be returned upon exit from the protected area.. "
10 CFR 73.55(a), " General performance objective and requirements," states, "The licensee shall establish and maintain an onsite physical protection system and security organization which will have as its objective la pravide high assurance that ,
activities involving special nuclear material are not inimical to the common defense '
and security and do not constitute an unreasonable risk to the public health and safety.. The Commission may authorize an applicant or licensee to provide measures for protection against radiological sabotage other than those required by this section if the applicant or licensee demonstrates that the measures have the same high assurance objective. . and that the overall level of system performance provides
[ equivalent] protection against radiological sabotage..."
Virginia Electric and Power Company seeks this exemption in order to allow the use of a hand geometry biometrics system to control unescorted access to the protected l areas located at Surry and North Anna Power Stations while the required picture )
badges and access control cards will be retained by the individuals to whom they were j issued upon exiting the protected area. ;
I BACKGROUND l Currently, employee and contractor identification badges coupled with their associated i access control cards are issued and retrieved on the occasion of each entry to and exit I from the protected area. Station security personnel are required to maintain control of the badges while the individuals are offsite. This practice has been in effect at Surry and North Anna Power Stations since each operating license was issued. Security !
personnel retain each identification badge, as well as the associated access control l card, when not in use by the authorized individual, within appropriately designed storage receptacles inside a bullet resistant enclosure. An individual who meets the i access authorization requirements is issued an individual picture identification card and an individual access control card which allows entry into preauthorized areas of the station. While entering the plant in the present configuration, an authorized ,
i
~
Page 1 of 4 1
_A
individual is " screened" by the required detection equipment and by the issuing security officer. Having received the badge, the individual proceeds to the access portal, inserts the access control card into the card reader, enters a personal identification number (PIN), and passes through the turnstile which unlocks if the preset criteria are met. Once inside the station, the individual's PIN is not required in order to further utilize the access authorization card.
This present pocedure is labor intensive since security personnel are required to verify badge issuance, ensure badge retrieval, and maintain the badges in orderly storage until the next entry into the protected area.
DISCUSSION Under the proposed system, individuals authorized to gain unescorted acmss will have the physical characteristics of their hand (hand geometry) recorded wmi their badge number. Since the hand geometry is unique to each individual and its application in the entry screening function would preclude unauthorized use of a badge, the requested exemption would allow employees and contractors to keep their badges at the time of exiting the protected area. The process of verifying badge issuance, ensuring badge retrieval, and maintaining badges could be eliminated while the balance of the access procedure would remain intact. Firearm, explosive, and metal detection equipment and provisions for conducting searches will remain as well.
The security officer responsible for the last access control function (controlling admission to the protected area) will also remain isolated within a bullet-resisting structure in order to assure his or her ability to respond or to summon assistance.
TECHNICAL BASIS Use of a hand geometry biomntrics system exceeds the present verification methodology's capability to discern an individual's identity. Unlike the photograph identification badge, hand geometry is nontransferable. During the initial access ;
authorization or registration process, hand measurements are recorded and the template is stored for subsequent use in the identity verification process required for entry into the protected area. Authorized individuals insert their access authorization card into the card reader and the biometrics system records an image of the hand geometry. The unique features of the newly recorded image are then compared to the template previously stored in the database. Access is ultimately granted based on the degree to which the characteristics of the image match those of the " signature" template.
CO N C L U SIO_N Granting the requested exemption from the requirement for contractors to return their picture badges and access control cards when departing from the protected area is warranted based on the ability of a biometrics system to assure the identity of authorized individuals, the licensee's continuing capability to render an access authorization card ineffectual, and reliance upon firearm, explosive, and metal detection equipment and provisions for conducting searches. Furthermore, the Page 2 of 4
i
)
.. j
. i l security officer responsible for the last access control function (controlling admission to the protected area) will also remain isolated within a bullet-resisting structure in order to assure his or her ability to respond or to summon assistance.
JUSTIFICATION 10 CFR 73.5 states that the Commission may grant exemptions from the requirements of the regulations contained in the 10 CFR 73 provided that: (1) the exemption is )
authorized by law, (2) the exemption will not endanger life or property, (3) the _
exemption will not endanger the common defense and security, and (4) the exemption is otherwise in the public interest.
- 1. IllL 3eauested F Exemotion is Authorized by Law ,
No law exists which would preclude the activities covered by this exemption !
request, thus the Commission is authorized to grant this exemption. .
- 2. The Reauested Exemotion Will Not Endanaer Life or Procerty The exemption from the requirement to issue and retrieve contractor picture i badges upon entering and exiting protected areas at Virginia Electric and Power Company does not present an undue risk to the public health and safety. '
Addition of a hand geometry biometrics system will provide a significant contribution to effective implementation of the security plan at each site. '
Therefore, an exemption of this nature does not increase the risk to the public health and safety.
- 3. The Reauested Exemotion Will Not Endanaer the Common Defense and Security l
The common defense and security are not negatively impacted by this exemption request. An exemption granted contingent upon the utilization of a hand geometry biometrics system will augment the process by which Virginia Electric and Power Company permits unescorted access to the protected areas ;
located at Surry and North Anna Power Stations.
- 4. The Exemotion is Otherwise in the Public Interest The subject exemption would allow Company resources and management attention to be more focused on areas of nuclear safety significance. Generally, the public interest would be served by reducing the Company resources presently dedicated to identity confirmation and badge issue, collection, and storage.
SAFETY IMPACT Virginia Electric and Power Company has reviewed this exemption and determined that nuclear safety will not be impacted. This exemption request provides for meeting the intent of the regulations by implementing a hand geometry biometrics system as an
)
Page 3 of 4 j
alternate means to determine the identity of badged individuals. This technology will i'mprove the reliability of the access screening process and obviate the need to issue, retrieve, and store contractor picture badges. Thus, operation of Surry and North Anna Power Stations in accordance with this request will not:
- 1. Involve an increase in the probability of occurrence or consequences of an accident or malfunction of equipment important to safety in the safety analysis report. The process for granting unescorted access to the protected areas at Surry and North Anna is not directly associated with the design, function, or operation of plant equipment described in the safety analysis report. Thus, the probability of accident occurrence cannot be impacted by the elimination of the picture badge issue, collection, and storage functions. Likewise, such an exemption has no bearing on the consequences of an accident as analyzed in the safety analysis reports for either station. Additionally, as noted throughout this request, replacing the function required by the regulations with a superior identity verification device does not reduce the effectiveness of the overall security and access control programs in place at Surry and North Anna.
- 2. Create the possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report. Again, the process for granting unescorted access to the protected areas at Surry and North Anna is not directly associated with the design, function, or operation of plant equipment and plant operations will not be changed due to this request. No new accident precursors will be generated, therefore no new or different kind of accident will be created by this request.
- 3. Involve a reduction in the margin of safety as defined in the basis for any technical specification. Plant operations are not being che,nged nor are any of the accident analysis assumptions being modified or exceeded by this exemption request. Therefore, the accident analysis assumptions remain bounding and safety rnargins remain unchanged. Furthermore, as noted above, replacing the functions of verifying identity arid issuing, collecting, and storing picture badges with a hand geometry biometrics system does not reduce the effectiveness of the security plans which are curreatly in place.
Page 4 of 4