Amend 4 to License DPR-76,granting Temporary Exemption from Requirements of Portions of 10CFR73 Re Maintaining Approved Physical Security Plan
ML20069D820
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/11/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20069D809 List:
References
NUDOCS 8303180629
Download: ML20069D820 (3)


Text

.

i

$2 Kt

.N

  • #'eg UNITED STATES

[V - s.c g

NUCLEAR REGULATORY COMMISSION i

gC WASHINGTON D. C. 20555

, f

~

.,..... _. ~ _.

PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 4 License No. DPR-76 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for exemption and amendment by Pacific Gas and Electric Company (the licensee) dated February 25, 1983, complies with the st&hdards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the provisions of the Atomic Energy Act of 1954, as amended, and the regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Facility Operating License No. DPR-76 is hereby amended by changing paragraph 2.E. to read as follows:

+

l 8303180629 830311 PDR ADOCK 05000275 P

PDR

~~

2.E.

Physical Protection 7

Except as noted below, thirty days prior to loading fuel in the reactor vessel, the licensee shall place in effect and fully implement all ~ provisions of the Commission approved Physical Security, Guard Training and Qualification, and Safeguards Contingency Plans, including amendments made pursuant to the authority of 10 CFR

$50.54(p). The approved plans, which contain information protected under 10 CFR $73.21 are collectively entitled "Diablo Canyon Power Plant Physical Security Plan," dated May 25, 1977, with revisions dated June 3,15, and 29, July 22 and December 29, 1977; January 31, and March 16,1978;~and May 15, 1979; and September 17, 1982, as supplemented-by commitments contained in Pacific Gas and Electric Company's letter of March 12, 1981 to the Chief, Licensing Branch No. 3, NRR, Nuclear Regulatory Commission; "Diablo Canyon Power Plant Guard Training and Qualification Plan," dated July 11, 1980, and the "Diablo Canyon Power Plant Safeguards Contingency Plan,"

dated May 1,1980. The approved Diablo Canyon Security Plan identified above 15 amended to increase the minimum number of armed responders consistent with ALAB-653 (restricted) decision' of September 9,1981.

The following provisions of the approved plans shall be in effect and continue to be implemented:

1.

The Diablo Canycn Power Plant Guard Training and Qualification Pla'n shall be fully implemented and all guards fully trained and qualified by January 1, 1982 (per letter dated July 16, 1981, from the Assistant General Counsel, Pacific Gas and Electric Company, to the Chief, Licensing Branch No. 3, NRR, Nuclear ReSulatory Commission). The Diablo Canyon Power Plant Safeguards Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b),

thirty days prior to fuel loading.

2.

The licensee shall limit access into the Unit 1 protected area to persons who are employees or contractors of the licensee, and to other persons determir.ed by the licensee to have legitimate business needs on the site.

i

t k

3.

Those portions of th'e ' phi's'idl secuRty ' plan 7

~

which relate to the protecticn of special nuclear material of low strategic significance under the provisions of 10 CFR $73.67, shall remain in effect.

4.

The tamper indicating features of the alarm systems shall remain active and shall be monitored during the interim period.

Thirty days prior to fuel loading the licensee shall implement the

" Return to Service" provisions as described in Section F, pages 4 through 6 of the request for exemption dated February 25, 1983.

3.

The license amendment,is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

  • j s

Y N

1 Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance: MAR 111583 4