a VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 83-02 FOR THE MONTH OF FEBRUARY,1983 8303160367 830309 PDR ADOCK 05000271 R PDR

OPERATING DATA REPORT DOCKET NO. 50-271 DATE 830309 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 Ext. 136 OPERATING STATUS

1. Unit Name: Vermont Yankee
2. Reporting Period: February
3. Licensed Thermal Power (MWt): 1593
4. Nameplate Rating (Gross MWe): 540
5. Design Electrical Rating (Net MWe): 514(oc) 504(cc)
6. Maximum Dependable Capacity (Gross MWe): 535
7. Maximum Dependable Capacity (Net MWe): 504
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

N/A

9. Power Level to Which Restricted,If Any(Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 672.00 1.416.00
12. Number Of Hours Reactor War Critical 672.00 1,375.36 74 218.35
13. Reactor Reserve Shutdown Hours 0.00 0.00__

0.00

14. Hours Generator On-Line 672.00 1,363.20 72,782.89
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 890,193.00 1,869,985.50 104,909,228.00
17. Gross Electrical Energy Generated (MWH) 297.611.00 626.940.00 34.888.087.00
18. Net Electrical Energy GeneratedQBm) 284,117.00 599,279.00 33.089.820.00
19. Unit Service Fcetor 100.00 96.27 79.53
20. Unit Availability Factor 100.00 96.27 79.53
21. Unit Capacity Factor (Using MDC Net) 83.89 83.97 71.74
22. Unit Capacity Factor (Using DER Net) 82.26 32.34 70.35
23. Unit Forced Cutage Rate 0.00 3.73 6.31
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

An eight week refueling outaee is scheduled to start March 5. 1981.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Cperation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

?

AVERAGE DAILY UNIT POWER LEVEL ,

j DOCKET NO. 50-271 UNIT Vermont Yankee i DATE 830309 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 Ext. 136 February MONTH 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEI.

(MWe-Net) (MWe-Net)

1. 450 17. 420 1
2. 437 18. 420 449 19. 419 i 3.

445 20. 419 4.

443 21. 418 5.

' 2

22. 413 6.

'41

23. 412 7.

440 24.

236 8.

i 436 25. 430 9,

. 10. 432 26. 410

! 11. 430 27, 408

12. 428 28. 406 ,
13. 428 29.

426 30.

14.

424 31.

15.

422

16. ,

! INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, i

l .

i

,, ._ _ ~ . , , , , . . , - - - . - - _ _ _ , . . _ _ . _ . _ _ . _ _ _ _ _

1 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET No - 50-271 ,

UNIT NAME ~

Vermont Yankee.

REPORT MONTil DATE 530309 February ~

COMPLETED BY F.J. Burger -

TELEPliONE _ 802/257-7711 Ext. 136~

a cm v Su u No. Date m e

O0 uo c

o MO License aase mctive euo 7. @c.

c Action to p t# ##"" """ """"

m - .. . 80 Z g O 8

i 83-03' 830224 F 0 B 4 N/A Cll PUMPXX Power reduction to repair leakage in the (Power "B" reactor feed pump.

Reductic n) 4 i

I t

1 3

I

~

1 3 4 F: Forced Reason: Method: 1:xhibit G- Instructions S: Scheduled A-Equipment Failure (Explain) 1- Mauual l'or Preparation of Data B-Maintenance or Test 2- Manual Scram Lntry Sheets for Licensee C-Refueling 3- Automatic Scram Fvent Report (LER) File D-Regulatory Restriction 4- Other (Explain) (NUREG 0161)

E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain) li-Other (Explain)

DOCKET NO. 50-271 UNIT Vermont Yankee DATE 830309 COMPLETED BY F.J. Burger ,

TELEP110NE 802/257-7711 Ext. 136 SAFETY RELATED MAINTENANCE Page 1 of I

~

NATURE OF MALFUNCTION ER OR OUTAGE EQllIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Nitrogen Makeup Valves Corrective LER 83-5/1T See LER Valves Failed to Disassembled and Cleaned V16-20-20 and V16-20-22B MR 83-0147 Close Valves.See LER, RCIC Valve V13-18 Corrective LER 83-6/IP See LER Valve Failed to See LER.

MR 83-0218 Close RCIC Relay 16AK3C Corrective N/A Failed Parts itelay Failed Replaced Parts as MR 83-0227 Necessary.

d

DOCKET NO. 50-271 UNIT Vermont Yankee i

DATE 830309 COMPLETED BY F.J. Burger d

TELEPHONE 802/257-7711 Ext. 136 REPORT MONTH February I

SUMMARY

OF OPERATING EXPERIENCES Highlights l

I Vermont Yankee operated at 83.16% of rated thermal ower for the month.

Gross electrical generation was 297,611 MWH, or 82.1%of design eleccrical capacity.

Operating Summarv The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 87.72% of rated thermal power. The coastdown toward.the March, 1983 l refueling outage was in progress.

830224 At 0030 hrs, a power reduction was initiated for the repair of the "B" reactor feed pump.

. 820224 At 1806 hrs, a return to power was started.

i-

At the end of the reporting period the plant was operating at 80.31% of rated thermal power. The coastdown toward the March,1983 refueling ot