a VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 83-02 FOR THE MONTH OF FEBRUARY,1983 8303160367 830309 PDR ADOCK 05000271 R
OPERATING DATA REPORT DOCKET NO. 50-271 DATE 830309 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 Ext. 136 OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
February
- 3. Licensed Thermal Power (MWt):
1593
- 4. Nameplate Rating (Gross MWe):
540
- 5. Design Electrical Rating (Net MWe): 514(oc) 504(cc)
- 6. Maximum Dependable Capacity (Gross MWe):
535
- 7. Maximum Dependable Capacity (Net MWe):
504
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
N/A
- 9. Power Level to Which Restricted,If Any(Net MWe):
N/A N/A
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 672.00 1.416.00
- 12. Number Of Hours Reactor War Critical 672.00 1,375.36 74 218.35
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 672.00 1,363.20 72,782.89
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 890,193.00 1,869,985.50 104,909,228.00
- 17. Gross Electrical Energy Generated (MWH) 297.611.00 626.940.00 34.888.087.00
- 18. Net Electrical Energy GeneratedQBm) 284,117.00 599,279.00 33.089.820.00
- 19. Unit Service Fcetor 100.00 96.27 79.53
- 20. Unit Availability Factor 100.00 96.27 79.53
- 21. Unit Capacity Factor (Using MDC Net) 83.89 83.97 71.74
- 22. Unit Capacity Factor (Using DER Net) 82.26 32.34 70.35
- 23. Unit Forced Cutage Rate 0.00 3.73 6.31
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
An eight week refueling outaee is scheduled to start March 5. 1981.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Cperation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
?
AVERAGE DAILY UNIT POWER LEVEL j
DOCKET NO.
50-271 UNIT Vermont Yankee i
DATE 830309 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 Ext. 136 February MONTH 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEI.
(MWe-Net)
(MWe-Net) 450 17.
420 1.
1 437 18.
420 2.
449 i
3.
19.
419 445 4.
20.
419 443 418 5.
21.
2 413 6.
22.
'41 412 7.
23.
440 236 8.
24.
436 430 i
9, 25.
10.
432 26.
410 11.
430 27, 408 428 28.
406 12.
428 29.
13.
426 14.
30.
424 15.
31.
422 16.
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt, i
l i
,,._ _ ~.,
1 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET No -
Vermont Yankee.
50-271 UNIT NAME
~
530309 DATE REPORT MONTil February
~
F.J. Burger COMPLETED BY TELEPliONE _
802/257-7711 Ext. 136~
a cm v Su u
O0 MO License aase mctive 7.
@c.
No.
Date m
c e
uo o
euo c
Action to 8 0 p t#
m Z
g O
8 i'
83-03' 830224 F
0 B
4 N/A Cll PUMPXX Power reduction to repair leakage in the (Power "B" reactor feed pump.
Reductic n) 4 i
I t
1 3
I
~
1 3
4 F: Forced Reason:
Method:
1:xhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Mauual l'or Preparation of Data B-Maintenance or Test 2-Manual Scram Lntry Sheets for Licensee C-Refueling 3-Automatic Scram Fvent Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain) li-Other (Explain)
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 830309 COMPLETED BY F.J. Burger TELEP110NE 802/257-7711 Ext. 136 SAFETY RELATED MAINTENANCE Page 1 of I
~
NATURE OF MALFUNCTION ER OR OUTAGE EQllIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Nitrogen Makeup Valves Corrective LER 83-5/1T See LER Valves Failed to Disassembled and Cleaned V16-20-20 and V16-20-22B MR 83-0147 Close Valves.See LER, RCIC Valve V13-18 Corrective LER 83-6/IP See LER Valve Failed to See LER.
MR 83-0218 Close RCIC Relay 16AK3C Corrective N/A Failed Parts itelay Failed Replaced Parts as MR 83-0227 Necessary.
d
DOCKET NO.
50-271 UNIT Vermont Yankee i
DATE 830309 COMPLETED BY F.J. Burger d
802/257-7711 Ext. 136 TELEPHONE REPORT MONTH February I
SUMMARY
OF OPERATING EXPERIENCES l
Highlights I
Vermont Yankee operated at 83.16% of rated thermal ower for the month.
Gross electrical generation was 297,611 MWH, or 82.1%of design eleccrical capacity.
Operating Summarv The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 87.72% of rated thermal power. The coastdown toward.the March, 1983 l
refueling outage was in progress.
830224 At 0030 hrs, a power reduction was initiated for the repair of the "B" reactor feed pump.
820224 At 1806 hrs, a return to power was started.
i-At the end of the reporting period the plant was operating at 80.31% of rated thermal power. The coastdown toward the March,1983 refueling ot:tage is continuing.