ML20069A903

From kanterella
Jump to navigation Jump to search
Ro:On 830213,fire Barrier Penetration Limiting Conditions for Operation Generated on Fire Barrier Penetration Located in 20-ft Elevation East Wall of Svc Water Bldg to Permit Installation of Temporary Power Supply Cables
ML20069A903
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/04/1983
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-83-719, NUDOCS 8303160348
Download: ML20069A903 (1)


Text

. - .- _

CD&L .

Carolina Power & Light Company h; u.swa.=mxm.usnw:a 7 Q a Brunswick Steam Electric Plant Y%

P. O. Box 10429 CO Southport, NC 28461-0429 p (h

& :s

! March 4, 1983 j

FILE: B09-13510C #

SERIAL: BSEP/83-719 Mr. James P. O'Reilly, Director U. S. Nuc1 car Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 LICENSE NO. DPR-71 DOCKET NO. 50-325 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8

Dear Mr. O'Reilly:

At 1805 on February 13, 1983, a Unit No. 1 fire barrier penetration LCO was generated on a fire barrier penetration located in the 20' elevation east wall of the Service Water Building. This was done to permit running temporary power supply cables needed for the installation of a plant modification. Due to the complexity of the work involved with the modification, the seven-day specified time frame of the LCO has been exceeded. Appropriate stationed fire watchers will remain in effect until completion of the involved work and cancellation of the subject LCO.

Very truly yours, C3by C. R. Dietz, General Manager Brunswick Steam Electric Plant i

RMP/mcg/LETCGI cc: Mr. R. C. DeYoung NRC Document Control Desk

't OFFICI AL COPY 8303160348 830304 PDR ADOCK 05000325 S PDR p A

.-. .- - --