Text
_-_
OPERATING DATA REPORT 050-298 DOCKET NO.
DATE February 4, 1983 COMPLETED BY P. L.
Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes
- 1. Unit Name:
- 2. Reporting Period:
Januarv 1981 2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrica! Rating (Net Mble):
787
- 6. Maximum Dependable Cipacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to-Date Cumulative 744.0 74A n 75.289.0 i1. Hours In Reporting Period 744*U
- 12. Number Of Hours Reactor Was Critical 744.0 62,114.9 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 744.0 744.0 61,116.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,687,464.0 1,687,464.0 121,748,766.0
- 17. Gross Electrical Energy Generated (MWH) 565,921.0_,
565.921.0 38,498,149.0
- 18. Net Electrical Energy Generated (MWH) 547,541.0 547,541.0 37,121,001.0 100.0 100.0 81.2
- 19. Unit Service Factor 100.0 100.0 81.2
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 96.1 96.3 64.5
- 22. Unit Capacity Factor (Using DER Net) 94.6 94.6 63.4 0.0 0.0 3.8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Refueling, May 1, 1983, 4 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION 8303150555 830204
- pu77, PDR ADOCK 05000298 R
ppg 1
J
AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.
UNIT Cooper Nuclear Station DATE February 4, 1983 t
COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 i
January g
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 447 753 37 585 18 776 2
776 3
689 39 4
765 20 776 5
755 21 773 757 6
22 771 725 7
757 23 g
741 24 772 9
634 25 771 10 767 26 770 11 77s 27.
770 12 776 g
771 13 774 29 771 711 14 773 30 15 771 33 770 16 663 INSTRUCTIONS On this format. list the average daily unit power levelin Mwe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
050-298 DOCKET NO.
UNIT SilUlDOWNS AND POWER REDUCTIONS Cooper Nuclear Statioe UNIT N AME DATE February 4, 1983 COMPLETED BY P. L. BallinRer January 402-825-3811 REPORT MONTil TELEPilONE n.
E E
3?
3 y Y3 Licensee 5-r, ja, Cause & Correceive No.
Date g
5g 4
2g$
Event u?
o-1 Actron to Report #
EU
!V P.revent Recurrence
$E 5
5 g =g H
e.
U Q
83-1 830101 S
0 11 0
N/A N/A N/A Reduced power to exchange control rod sequences and perform turbine testing.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NtlRI G.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
Exhibit I - Same Source G-Operational Error (Explain)
(9/77)
Il Other (Explain)
v i
OPERATIONS NARRATIVE Cooper Nuclear Station January 1983 i'
The plant operated the month of January with only one power reduction to exchange control rod sequences and perform turbine testing. The plant operat-ed the remainder of the month without power reductions and shutdowns and attained a capacity facter of 94.6% for the month.