ML20067E133
| ML20067E133 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/20/1982 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20067E115 | List: |
| References | |
| NUDOCS 8301030338 | |
| Download: ML20067E133 (5) | |
Text
..=
1 1
[7590-01]
4 UtilTED STATES HUCLEAR REGULATORY C0!911SSION 4
DOCKET NO. 50-373 C0!t90NWEALTH EDISON COMPANY t
l HOTICE OF ISSUA!!CE OF AT1ENDMENT OF FACILITY OPERATING LICENSE AND NOTICE-OF EXEMPTION The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment flo.12 to f acility Operating License Ho. NPF-il, issued to Comon-l wealth Edison Company, and a related exemption from 10 CFR 550.44 for operation of the La Salle County Station, Unit No.1 (the facility) located in Brookfield l
Township, La Salle County, Illinois.
i The regolation 10 CFR $50.44 requires that all reactors with Mark I cr 11 containment must be inerted 6 months after initial Criticality.
La Salle Unit 1 has a tiark 11 containment and its initial criticality was perforned on June 21, 1982.
It is presently completing its startup program
{
and Comonwealth Edison requested an exemption from this regulation to avoid any ootential negative impact on the startuo program. The exenstion is authorized until either the required 100 percent rated thermal oower trio test has been perforned or the reactor has onerated for 120 effective full j
power days, whichever is first. The Amendment and exemption are effective as of the date of issuance.
The application for amendment and exenotion comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has nade appronriate findings as required by the Act and the Comission's rules and regulations 8301030338 021220 j
PDR ADOCK 05000373 P
PDH t
OFHCE>
~*
sunnna >
~.. " - - ~ ~ "...
omy
.. -. - ~...
-. ~. -... -
. ~ ~ ~.... ~
wa ronu ais oo an nacu om OFFICIAL RECORD COPY usoeo. mi-an.m
, <, - - - - - - +., _, --
,,,-.a--.,
1
[7590-01] in 10 CFR Chapter I, which are set forth in the license amendment and in the safety evaluation in support of the Amendment and exemption. Prior public notice of the license amendment was not required since the Amendment does not involve a significant hazards consideration.
^
The Comission has determined that the issuance of this Amendment and the exenption will not result in any significant environmental impact and that oursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or necative declaration and environmental impact appraisal need not be prepared in conn:ctio1 with issuance of this Amendment and exemption.
F3r further details with respect to this action, see (1) the application fcr anendment and exemtion dated flovember 18, 1982 and December 7, 1982; (2) Anenoaelt !!o. 12 to License No. NPF-11 dated December 20,1982; and (3) the related saf6ty evaluation in support of the Amendment and exemption. All of these itens are available for public inspection at the Commission's Public Document Roca, 1717 11 Street, NW, Washington, DC 20555, and the Public Library of Illinois Valley Coamunity College, Rural Route No.1, Ogelsby, Illinois 61348. A copy of items (1), (2) and (3) may be obtained upon request addressed
~
to the 11. S. Nuclear Regulatory Commission, Washington, DC 20555, f ttention:
Ofrector, Division of Licensing.
Oated at Bethesda, Piaryland this 20 th day of Decerter 1982.
FOR THE UUCLEAR REGULATORY C0'f11SSIO!!
Original signed by7 A. Schwencer, Chief Licensinq Branch Ho. 2
~
- SEE PREVIOUS CONCURRENCES omce> DL: LB.#2/.P.M..
DL.:Lil#2/LA..
. QE L D..
DL.;.L j21.B.C..
so - c) ABp u.tn.i.a,: hw., EM,, ton *
, CWgo dhea,d*
ASchw nce,t,.
.12L,,,/,82...
12L1,3/82 12/.1.3/82...12/.t9.82 l
om>
I O FF1CI AL R ECO R D COPY qsyy (m-mm NijC FOpt 318 t tJ 90) NRCyt 0040 i
[7590-01]
UllITED STATES NUCLEAR REGULATORY COMMISSIO_M DOCKET NO. 50-373 COMMONWEALTli EDISON COMPA!!Y HOTICE OF ISSUANCE OF AMENDMENT OF FACILITY OPERATIt!G LICENSE N
J*
wx The U. S. Nuclear Regulatory Conmission (the Comission) has issued N
Anendment No.
to Facility Operating License No. NPF-11, issued to Comon-N wealth Edison Connany, which authorizes an exemption from 10 CFR 550.44
\\
for operation of the La Salle Count Station, Unit No.1 (toe facility) located in Brookfield Township, La Salle County, Illinois.
i
\\
The regulation 10 CFR $50.44 requires. that all reactors with tiark I l
\\
or II containment must be inerted 6 nonths af ter initial criticality.
s N
La Salle Unit 1 has a Mark 11 containment and its initial criticality was
\\
performed on June 21, 1982. It is presently completirg its startup program and Commonwealth Edison requested an exemption from this regulation to avoid any potential negative impact on the startuo progran. The exemption is authorized until either the required 100 percent rated thernal power trip i
test has been performed or the reactor has operated for 120 effective full power days, whichever is first. The Acendment is effective as of the date 1
of issuance.
t J
The application for anendment complies with the standards an requirements j
of the Atomic Energy Act of 1954, as anended (the Act), and the Comission's rules and regulations. The Commission has made approoriate findings as required by the Act and the Comission's rules and requlations in 10 CFR Chapter I, which are set forth in the license a.*endment. Prior nublic notice of this Amendrent omcE >
l sunawt>
oan y snc ronu ais oo m sacu ona OFFICIAL RECORD COPY u:cmim-m,w
. - J
[7590-01] was not required since the Amendment does not involve a significant hazards consideration.
The Corr 11ssion has determined that the issuance of this Amendment will l
not result in any's{gnificant environmental inpact and that pursuant to 10 CFR Section 51.5(
(4) an environmental impact statement, or negative declaration and environme\\ntal impact appraisal need not be prepared in connection with issuance of t s Amendment.
For further details with resnect to this action, see (1) the application
\\
for amendment dated Novenber 18,19$2 and December 7,1982 and (2) Anendment s
\\
'!o.
to License No. HPF-11 dated Dece. er
,1982. All of these itens are available for public inspection at tne Cos ission's Public Document Room, 1717 H Street, tN, Washington, DC 20555, an the Public Library of Illinois Valley Comunity College, Rural P.aute No.1, Oge sby, Illinois 61343. A copy of itens (1) and (2) may be obtained upon request addressed to the U. S.
1 quclear Regulatory Comnission, Washington, DC 20555, Attention: Director, Division of Licensing.
Dated at Bethesda, *1aryland this thdayofDecerneQ932.
FOR THE NUCLEAR REGULATORY COM11SSION s
A. Schwencer, Chief Licensing Branch Ho. 2 Division of Licensinq
,3 b/ ',{
y.h W,)
' ep DL..:..L.B #.2./..P..M...
.D..L...:.L..B. M2./.L.A.....
..D..L..:..L..B..#. 2./..B..C....
...(_/..[....A.d....../.
o,ncc>
q sun-c > AB,p,,u r n,i,a,;,kw, E,Hf,h,n,,,,,,,,,,A,Sc hypngg,r,,, s,3,bj,,l,i;,($,,
,,,1, z,,,,z a2,,,,,,,(,4,,,,(,1,',yi 12,L,.,z 82.,
,12./,nf,s,,,,,,,
2 2
om, OFFiClAL RECORD COPY usaco: nei-au-m snc ronu sis tia aci sncu oua
ye.
4
- y DISTRIBUTION:M I
b UNITED STATES
-cket Fjle LB#2 File k
NUCLEAR REGULATORY COMMISSION 0
WASHINGTON. D.C. 2o555 ABournia g
December 20, 1982 FIngram, PA Docket No. 50-373 Docketing and Service Section Office of the Secretary of the Commission SUBJEC'T: NOTICE OF ISSUANCE OF AMENDMENT NO.12 TO FACILITY OPERATING LICENSE NO. NPF-ll, LA SALLE COUNTY STATION, UNIT 1 Two signed originals of the Federal Register Notice identified below are enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 6 )of the Notice are enclosed for your use.
O Notice of Receipt of Application for Construction Permit (s) and Operating License (s).
O Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Mattera.
O Notice of Avaiiability of Applicant's Environmental Report.
l 0 No: ice of Proposed Issuar;ce of Amendment to Facility Operating License.
O Notice of Receipt of Application for Facihty License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
O Notice of f..e4bility of NRC Draft l Final Environmental Statement.
O Notice of Limited Work Authorization.
i O Notice of Availability of Safety Evaluation Report.
j O Notice of issuance of Construction Permit (s).
i I
(2 Notice of Issuance of Facility Operating License (s) or Amendment (s). No.12 O Other:
1 Office of Nuclear Reactor Regulation As Stated DL:LB /LA orrec__
Efiyl pt smue-
.a 12/20/82 O AT E --.-
i NFIC FOnM 102 7 -79
\\
t
- -.