UNITED STATES
['k/.f.tj NUCLEAR REGULATORY COMMISSION
'. t,;;jgb j
WASWNGTON. D C. 20555 000
%......?
POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET N0. 50-333 l
JAMES A. FITZPATRICK NUCLEAR POWER PLANT NiENDMENT TO FACILITY OPERATING LICENSE Amendment No. 205 License No. DPR-59 j
l 1.
The Nuclear Regulatory Commission (the Commission) har found that:
A.
The application for amendment by Power Authority of the State i
of New York (the licensee) dated May 21, 1993, complies with the l
standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, l
the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License No. DPR-59 is hereby amended to read as follows:
9403080287 940223 PDR ADOCK 05000333 P
POR
I-l (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 205, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
r 3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION mu a.6pJ Robert A. Capra, Director Project Directorate I-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications l
Date of Issuance:
February 23, 1994 l
1 I
l.
ATTACHMENT TO LICENSE AMENDMENT NO. 205 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET N0. 50-333 Revise Appendix A as follows:
Remove Paaes Insert Paaes 219 219 225 225 1
JAFNPP 3.9 Continued 4.9 Continued 2.
The Diesel Fuel Oil Transfer System shall be operable 2.
Once per month demonstrate the fuel oil transfer system l
whenever the diesel generator it supplies is required to be operates to transfer fuel from the storage systems to the operable, except as specified below; fuel oil day tanks.
a.
From and after the time that one fuel oil transfer pump per Diesel Generator System is made or found to be inoperable for any reason, continued reactor operation is permissible for a period not to exceed 60 days; provided that the remaining fuel l
oil transfer pumps are demonstrated to be operable immediately and weekly thereafter.
b.
From and after the time that only two fuel oil transfer pumps per Diesel Generator System are operable, continued reactor opertion is permissible for a period not to exceed 30 days total per pair of diesels, provided that the remaining fuel oil transfer pumps are demonstrated to be operable and daily thereafter.
i N
j i
i Amendment No. 83,134, 205 j
- ) 1 0
JAFNPP 4.9 BASES The general objective of this specification is to check equipment Once per month tests are conducted for support systems operability, detect equipment failures and deterioration.
independently or as part of monthly diesel generator surveillance: (a) to check the air starting systems for A.
Normal and Reserve A-C Power Systems automatic starting of the compressors and their ability to recharge the receivers, (b) to check the fuel oil transfer 1.
Reserve A-C Power Source system to ensure that the transfer pumps will refill the day tanks.
The equipment is normally operated in the stand-by energized condition. Surveillance monitors are provided During the operating cycle test, a functional test of the for determining its normal operability status both while in emergency a-c power system is made by simulating a stand-by or during plant startup and shutdown loss-of-coolant accident and a coincident loss of normal procedures. Insulation tests are conducted at specified and reserve a-c power to the plant for checking proper intervals to determine the condition of insulation.
operation of the system including sequencing of engineered safeguards and for Emergency Core Cooling 2.
Auxiliary Equipment System equipment.
Mechanical and electrical tests are conducted at C.
Diesel Fuel specified intervals to assure proper functioning of equipment.
Diesel fuel quality is checked at specified intervals to ensure high reliability of engine operation.
l B.
Emeroency A-C Power System The operability of the fuel oil transfer system is The emergency Diesel Generator Systems are tested monthly demonstrated by partially draining the day tanks, initiating to determine functional performance. Test procedures and low and low-low level signals to start the lead and backup intervals are specified to check for failure or deterioration in pumps, respectively, and terminating fuel oil transfer on a equipment and system operation since last use. Full load high level signal.
applied to the diesel unit is applied to prevent fouling of the engine: operation at equilibrium temperatures ensures there are no overheat problems.
i Amendment No. 205 225
--