ML20067D438

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Nonconforming Matl Certification for Diesel Generator Piston.Initially Reported on 820930. Nonconformance Rept MG-1445 Issued to Control & Document Piston Replacement Prior to Unit Startup
ML20067D438
Person / Time
Site: Palo Verde 
Issue date: 11/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22367-GHD, DER-82-60, NUDOCS 8212130259
Download: ML20067D438 (3)


Text

.

RECE

~

I.1pr,

m Arizona Public Service Company ggy P.o. Box 21666. PHOENIX. AR. ZONA 85036 Y

November 22, 1982

'D/,t;

. ANPP-22367-GIID/BSK 1

'U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 j=

Walnut Creek, California 94596-5368 I

Attention:

Mr. D. !!. Sternberg, Chief Reactor rrojects Branch 1

~

Subject:

Final Report - DER 82-60 A 50.55(e) Reportable Condition Relating to Unit 3 Diesel Generator Piston IIas Nonconforming Material Certification File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 21, 1982

Dear Sir:

Attached is our final written report of the Reportable Deficiency, under 10CFR50.55(e) referenced above.

Very truly yours, I

4 kN hLR E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/ Gild:db j

Enclosure cc: See Attached Page 2 j

8212130239 821122 PDR ADOCK 05000530

... _ _ - - -. _ _. ~ -. -,.

m U. S. Nuclear Regulatory Commission November 22, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22367-GIID/BSK Page 2.

cc: Richard DeYoung, Director-Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555' T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr.

. W. J. Stubblefield W. G.-Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabei, Esq.

Ilarmon & Weiss 1725 "1" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan !!cmorial Building Santa Fe, New Mexico 37503 1

r FINAL REPORT - DER 82-60 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY-(APS)

PVNGS UNITS 3 1.

DESCRIPTION OF DEFICIENCY As documented by the attached Cooper Energy Services 10CFR Part 21 Report dated September 30, 1982, a diesel generator engine, serial

  1. 7188 (Project Tag No. 3-!!-DGA-H01), has been discovered to have been delivered with a defective piston in cylinder #7.

II.

ANALYSIS OF SAFETY IMPLICATION This condition is evaluated as Reportable since, if left uncorrected, the condition could preclude the diesel generator from performing its safety-related function.

III. CORRECTIVE ACTION Nonconformance Report IfG-1445 has been issued to control and document the replacement of the piston by Cooper Energy Services prior to the start-up date for the unit.

l