ML20067D421

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1982
ML20067D421
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/06/1982
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20067D413 List:
References
NUDOCS 8212130250
Download: ML20067D421 (3)


Text

--

OPER ATING DATA REPORT DOCKET NO.

50-255 DATE 12-2-02 CO>lPLETED BY DAPeterson TELEPilONE.

(616) 7614-8913 OPERATING STATUS a

ades Notes

1. Unit Name:
2. Reporting Period:

821101-821110

. 3. Licensed Thermal Power (. lWt):

2530

\\

g 011 7

4. Nameplate Rating (Gross 31We):

805

5. Design Electrical Rating (Net StWe):
6. 31asimum Dependable Capacity (Gross 31We):
  • 675 9
  • 635
7. 31asimum Dependable Capacity (Net 31We):

S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:

9. Power Lesel To Which Restricted.lf Any (Net 31We):
10. Reasons For Restrictions. lf Any:

r This.\\f onth.

Yr. to Date Cumularise f

11. Hours in Reporting Period 720 8016 95,991
12. Number OfIlours Reactor Was Critical 720 hh55.8 53.179
13. Reactor Resene Shutdown flours
14. Hours Generator On.Line 720 h0h6.5 50,250.9
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (51WH) 1,802,688 9.388.10h inn vos_# R 1
17. Gross Electrical Energy Generated (SIWH) 572 3,_,

2.953.3h0 11.181 300

18. Net Electrical Energy Generated (S!WH)

Sh3.Sh2 2,785,902 29.298.835 i

19. Unit Senice Factor 100 50.5 52.3
20. Unit Asailability Factor 100 50.5 52.3
21. Unit Capacity Factor (Using.\\lDC Net) 11A_o sh.7 hR_1
22. Unit Capacity Factor (Using DER Net) 91.8 bl.2 17.9
23. Unit Fmced Outage Rate n

h9_s 3h.9

24. Shutdowns Scheduled Oser Nest 6 31onths (Type.Date and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

i

26. Units in Test Status 1 Prior o Commercial Operation):

Forecas t Achiesed INITIA' CRITICALITY INITI A L ELECTRICITY CO5t\\lERCIA L OPER ATION K 05h0hN5 PDR (4/77)

  • Based on condenser bacxpressure y,

=

AVERAGE DAILY UNIT POWER LEVEL 50-255 DOCKET NO.

UNIT

'h11sades DATE' 12-6-82 COMPLETED BY DAPeterson TELEPilONE (616) 76h-8913 MONTil Novernber 1982 i

l DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) t i

vho

,7 7gg.

2 Th7 I8 759 3

755 75h 761 7h8 4

20 765 758 5

21 6

760 760 22 7

757 33 755 758 8

24 i

760 9

25 759 756 726 I

i 3o 26 11 749 3

79, 721 g,

28 757 13 761 760 29 14 761 755 39 761 33 31 761 INSTRUCTIONS 4

On this fornut. list the aserage daily unit power levelin MWe Net for t. ch day in the reportine month. Compute to the nearest whole megawati.

(9/77) 1

-w-

-_m

-m.

--w,

=

EUIC4ARY OF OPERATING EXPERIENCE FOR THE NONTH OF NOVFMBER 1982 Flant operated at essentially 100 percent rated power the entire month.

of November.

J t

,m.

4

- -.