ML20067D412

From kanterella
Jump to navigation Jump to search
Amends 193 & 131 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements of Unit 1 TS Section 4.9 & Unit 2 TS Section 4.8 to Change Requirements for DG Testing Under Hot Initial Conditions
ML20067D412
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/24/1994
From: Plisco L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20067D415 List:
References
NUDOCS 9403080209
Download: ML20067D412 (14)


Text

.

f* **%

k

[.

i i i *' i 3

UNITED STATES i

I NUCLEAR REGULATORY COMMISSION

..... j#

t v

WASHING TON, D.C, 20555 0001 g

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTH'JITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-321 EDWIN I. HATCH NVCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICEfLSE Amendment No. 192 License No. OPR-57 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility) Facility Operating License No. DPR-57 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated November 9,1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9403080209 940224 PDR ADOCK 05000321 p

PDR

l.

\\ o 1 l 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license

)

amendment, and paragraph 2.C.(2) of Facility Operating License No.

OPR-57 is hereby amended to read as follows:

Technical Soecifications The Technical Specifications contained in Appendices A Ind B, as l.

revised through Amendment No.192, are hereby incorporated in the 1

license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION W

\\

oren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - I/II Office of. Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance: February 24, 1994 i

l l

l l

l l...

y= '*%

lq h

a l ) *i S

UNITED STATES 2, tj l

NUCLEAR REGULATORY COMMISSION (s

/

W ASHINGTON, O.C. 20$$$-0001 GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO 50-366 h

EDWIN 1. HATCH NUCLEAR PLANT. UNIT 2

{

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.13' l

License Ne. NPF-5 1.

The Nuclear Regulatory Commission (the Comission) has found that:

]

A.

The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 (the facility) Facility Operating License No. N W-5 filed by the Georgia Power Company, acting for itself, Oglethorpe hwer Corporation, Municipal Electric Authority of Georgia, and City cf Dalton, Georgia (the licensees), dated November 9, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

j-2-

a 2.

Accordingly, the license is hereby amended by page changes to the 1

Technical Specifications as indicated in the attachment to this license

]

amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 i

is hereby amended to read as follows:

(

)

Technical Specifications i

i The Technical Specifications contained in Appendices A and B, as revised through Amendment No.131, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

l 3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.

j FOR THE NUCLEAR REGULATORY COMMISSION 1

4 6

1 oren R.~.Plisco, Acting Director l

Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Attachment:

Technical Specification

{

Changes Date of Issuance: February 24, 1994 i

e i

i

)

1 N

i l _ _,_ _ _,

4 ATTACHMENT TO LICENSE AMENDMENT NO. 192 FACILITY OPERATING LICENSE NO. DPR-5Z DOCKET NO. 50-321

)

8EQ TO LICENSE AMENDMENT N0.131 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following pages of the~ Appendix "A" Technical Specifications with the enclosed pages..The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.

Remove Paaes Insert Paaes Unit 1 3.9-2c 3.9-2c 3.9-2d 3.9-2d 3.9-4a 3.9-4a 3.9-11 3.9-11 Unit 2 3/4 8-5 3/4 8-5 3/4 8-Sa 3/4 8-5b B 3/4 8-1 8 3/4 8-l' B 3/4 8-2 9

J i

4

._...,..m..--..

.._~,,,..-v-,,

i l

i 1

ETING,f,00lTIONS FOR OPERATIOi l

SURVEILLMCE REQUIMNEMS j

3.9.A.2.

StandbyACPowerSucolv(Dieul 4.9.A.2.

Standby AC Powr Sueolv (Diesel Generators lA. 18. and IC)

Generators lA. 18. and IC)

(Continued)

(Continued)

)

a. Ooerability (Continued) i
11. Once every 18 sonths during j

shutdown, a hot start test i

shall be performed for each diesel generator as follows:

t Each diesel generator shall be operated for g 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 2565 kW. Within 5 minutes of shutting down s

the diesel generator following this run, it shall be verified the diesel generator starts and achieves, in s 12 seconds, voltage 2 3740 V and

{

s 4580 V and frequency,

2 58.8 Hz and f 61.2 Hz.

b.

Diesel Battery (125 Volti

b. Diesel Battery (125 Volt)

Each 125-volt diesel battery Each 125-volt diesel battery t

is operable and capable of shall be subjected to the I

supplying the required load, same periodic surveillance as the plant batteries in Speci-1 fication 4.9.A.3.

c.

Battery Charcer

c. Battery Charner An operable battery charger is Indicators shall be provided available. Each battery charger to monitor the status of shall have adequate capacity to the battery charger supply, restore its battery to full This instrtnentation shall charge within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from a include indication of output discharged condition while carrying the DC load.

current and output voltage, d.

Diesel Fuel d.

Diesel Fuel There shall be a mininun of 99,000 gallons of acceptable 1.

The quantity of diesel diesel fuel in the diesel fuel available in each fuel storage tanks and a fuel storage tank and mininun of 900 gallons fuel day tank shall be in each diesel fuel day tank, measured and recorded concurrently with the operability test speci-l fled for the diesel in l

$pecification 4.9.A.2.4.1, Womentary transients outside of lead range do not invalidate this test.

"Fcr the IB diesel generator, a single hot start test every 18 nonths will satisfy the requirements of Unit 1 Specification 4.9.A.2.a.ll and Unit 2 Specification 4.8.1.1.2.d.14 tATCH - UNIT 1 3.9-2c Amendment No. 192 l

n.

-r--.~

.. ~.

b l

+

tluf fl% Carolil0NS FOA 00ER.ATICri SURVEllLANCE REQUID9EN75 3.9.A.2.

Staadev AC Pow surely Diesel 4.9.A.2.

Standbv AC Power Eueelv (Diesel Generators la. 19. and IC)

Generators IA. la. and it)

(Continued)

(Continued)

d. Diesel Fuel fCantinued) 2.

At least once per 92 days by verifying that a saccle of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-0270-65, is within the acceptable limits specified in Table 1 of ASTM 0975-74 d en checked for viscosity, water and sedimnt.

-e.

Fuel Oil Transfee ptrrs -

e.

Fuel Oil Transfer Ptres A fuel oil transfer ptre shall be operable and capable 1.

The operation of the diesel of transferring fuel oil fuel oil transfer ptmps to from the storage system to transfer fuel fran the the day tank, storage system to the day tank shall be demonstrated concurrent with the oper-ability test specified for that diesel in Specification 4.9.A.2.a.1.

2.

The operation of the diesel fuel oil transfer ptmps to transfer fuel from each associated fuel storage tank to the day tank of each diesel, via the installed cross connection lines, shall be denenstrated at least once per 18 nonths during shutdow1.

i

?

I 1

l mTCH - UNIT 1 3.9-2d Amendment No. 192

LIMITING CCt0!T104S FOR OPERMILW SURVEILL# RE RECUIPE ENTS 3.9.A 7. Loate Syst es (Continued) 4.9.A,7. Loaic SY3tilC1 (Continued)

2. Deleted i

l

3. Deleted
c. Tne comen accident signal c.l. Once every 18 renths during logic systen, and undervcit-shutdown, each diesel generater age relays and su:perting shall be demonstrated operable systee are operable, by simulating a loss of offsite i

power in conjunction with an accident test signal and verifying: de-energization of the emegency buses and load shedding from the emegency buses; and the diesel starts on the auto-start signal with permanently connected loads in s 12 seconds, ene q tzes the auto-connected shutdown (emegency) loads through the i

load sequencer, operates for 2 5 minutes while its generator is loaded with the ernergency loads, and achieves and maintains a steady-state voltage of 4160 2 420 volts and a steady-state frequency of 60 1 1.2 H2.

l I

2. The undervoltage relays for the start buses shall be calibrated annually for trip and reset voltages and the measurerents recorded.
3. Verify, once per 18 ronths during shutdown, that all diesel generator trips, except engine overspeed, low lube oil pressure, and generator differential, are automatically bypassed upon loss of voltage on the emergency bus concurrent with an ECCS actuation signal.

i i

MTCH - UNIT 1 3.9-4a Amendment No. 192

-~

BASES FOR SURVEILLANCE REQUIREMENTS 4.9.

AUXILIARY ELECTRICAL SYSTEMS A.

Auxiliary Electrical Systems Eautomnt The auxiliary electrical power systems shall be functionally tested and in-spected at a frequency to assure a high reliability of operation and a high degree of perfonnance. This surveillance program is designed to meet the intent of " Proposed IEEE Criteria for Class lE Electric Systems for Nuclear Power Generating Stations (Standard No, 308).

2. Standby AC Power Sucoly (Diesel Generators 14. 18. and IC)
a. Operability Upon demand, the standby diesel generators shall start automatically and

)

j reach rated frequency and voltage within 12 seconds (unloaded). Based on the operation of all diesel generation units and all amenjency buses, the diesel generators are capable of accepting all AC loads within 40 seconds. Since the diesel generators aie utilized as standby power sources, readiness is of prine igortance. Readiness can best be demon-strated by testing, which insofar as practicable sinalates actual ear-gency conditions. The testing program is designed to test both the ability to start and the ability to run the diesel generators under load for extended

. periods of operation.

Each diesel generator unit is furnished with two cogletely independent air starting systems, either of which is capable of starting the diesel engine five times without recharging.

The monthly test of the diesel generators is conducted to check for equip-ment failures and deterioration. Testing is conducted until the diesels reach equilibrita operating conditions to demonstrate proper operation of these conditions. Each diesel shall be manually started, synchronized to the

.I bus, and load picked up. The diesels shall be loaded to at least one-half rated load to prevent fouling of the engines. The diesel generators will nonnally be run for at least one hour. In addition, during the test l

when the generator is synchronized to the bus, it is also synchronized to the offsite power source and thus is not cogletely independent of this source. Only one diesel shall be tested at a time to prevent parallel operation with another.

The hot start test is performed on each diesel generator every 18 months. This surveillance damnstrates that the diesel engine can restart frun a hot condition, such as subsequent to shutdow) from normal surveillances, and achieve the required voltage and frequency within 12 seconds. The 12 second time is derived from the requirerrents of the accident analysis. The 18 month frequency is consistent with the reconnendations of Regulatory Guide 1.108. The requirement that the diesel has operated for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at near full load conditions prior to performance of this surveillance is based on manufacturer recomnendations for achieving hot conditions. Momentary transients due to changing bus loads do not invalidate this test, b.

Qiesel Battery (125 Volt)

The surveillance of the diesel generator starting batteries is designed to provide an early indication of potential failure, c.

Battery Charaer The battery chargers are monitored to assure adequate battery chanje supply and are capable of recharging their assigned battery while carrying the nonnal loads.

d.

Diesel Fuel Quantity and quality checks assure sufficient acceptable fuel to maintain the minimum fuel supply requirements and to avoid damage to the diesel en-

gine, HATCH - UNIT 1 3.9 11 Amendnent No. 192

ELECTRICAL P0.WJR SYSTEMS SURVElllANCE RE0VIREMENTS (Continued)

9. Verifying that the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to 2 3000 kW' and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of thikW,s t,est, the diesel generator shall be loaded to 2775-2825

10. Verifying that the auto-connected loads to each diesel generator do not exceed the 2000-hour rating of 3100 kW.
11. Verifying the diesel generator's capability to:

a)

Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power, b) Transfer its loads to the offsite power source, and c)

Proceed through its shutdown sequence.

12. Verifying that with the diesel generator operating in a test mode (connected to its bus), a simulated LOCA actuation signal overrides the test mode by:

(1) returning the diesel generator to standby operation and (2) auto-matically energizes the emergency loads with offsite power.

13. Verifying that the fuel transfer pump transfers fuel from each associated fuel storage tank to the day tank of each diesel via the installed cross connection lines.
14. Operating each diesel generator for 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 2565 kW',

and within 5 minutes of shutting down the diesel generator following this run, it shall be verified the diesel generator starts and achieves, in s 12 seconds, voltage 2 3740 V and l

5 4580 V, and frequency 2 58.8 Hz and s 61.2 Hz."'

  • Momentary variations outside this band shall not invalidate the test.

" For the 18 diesel generator, a single 24-hour load test every 18 months will satisfy the requirements of Unit 1 Specification 4.9.A.2.a.6 and Unit 2 Specification 4.8.1.1.2.d.9.

For the 18 diesel generator, a single hot start test every 18 months will satisfy the requirements of Unit 1 Specification 4.9 A.2.a.ll and Unit 2 Specification 4.8.1.1.2.d.14.

HATCH - UNIT 2 3/4 8-5 Amendment No. 131 1

ELECTRICAL POWER SYSTEMS SVRVEILLANCE RE0VIRfMENTS (Continued) e.

At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting both diesel generators simultaneously, during shutdown, and verifying that both diesel generators accelerate to synchronous speed in s 12 seconds.

l 1

l l

l l

1 l

1 f

HATCH - UNIT 2 3/4 8-Sa Amendment No. 131 l

.1 I

4 4

4 1

i l

j 4

\\

i (This page intentionally left blank.)

s i

i i

a i

i HATCH - UNIT 2 3/4 8-5b Amendment No. 131 l

1

3/4,8 ELECTRICAL POWER SYSTEMS S_ASES The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for (1) the safe shutdown of the facility, and (2) the mitigation and control of i

accident conditions within the facility.

The minimum specified indepen-dent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation.

The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.

Each of the five diesel generators is provided with a storage tank and a day tank. The 33 the fuel oil tanks repre,000 gallons required to be maintained in each of sents a total volume of oil sufficient to operate any four diesel generators at 3250 kW for a period of 7 days.

This is based on a conservative expected fuel consumption of 240 gallons per i

hour per engine.

The onsite fuel capacity will last lonqer than the time it would take to replenish the onsite supply from offsite sources (which is

< 7 days).

Valving is available so that fuel oil can be transferred between fuel oil storage tanks.

However, administrative controls shall be in place to limit long-term total diesel generator load to s 13,000 kW, and to limit individual diesel generator loading to 5 3250 kW.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that:

(1 the facility can be maintained in the shutdown or refueling condition)for extended time periods, and (2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.

The surveillance requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regula-tory Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977, and Generic Letter 84-15, " Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability," July 2, 1984.

The hot start test specified in Regulatory Guide 1.108 has been modified to separate this test from the loss of offsite power functional test and the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load test.

The modified hot start test conforms to the BWR 4 Standard Technical Specifications, NUREG-1433.

The hot start test HATCH - UNIT 2 B 3/4 8-1 Amerldment No.131

3/4.8 ELECTRICAL POWER SYSTEMS BASES is performed on each diesel generator every 18 months.

This surveillance demonstrates that the diesel engine can restart from a hot condition, such as subsequent to shutdown from normal surveillances, and achieve the required voltage and frequency within 12 seconds.

The 12 second time is derived from the requirements of the accident analysis.

The 18 month frequency is consistent with the recommendations of Regulatory Guide 1.108.

The requirement that the diesel has operated for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at near full load conditions prior to performance of this surveillance is based on manufacturer recommendations for achieving hot conditions. Momentary transients due to changing bus loads do not invalidate this test.

Primary containment electrical penetrations and penetration conductors are protected by either de-energizing circuits not renuired during reactor operation or demonstrating the OPERABILITY of primary and backup overcurrent protection circuit breakers by periodic surveillance.