APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 12/01/82 COMPLETED EV FRANCES HARRISON TELEPHONE 919-457-9521 t10VEMBER 92 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 441.
17 487.
2 500.
18 447.
3 576.
19 465.
a 532.
20 536.
5 444.
21 534.
6 572.
22 527.
7 554.
23 526.
8 557.
24
- 525, 9
555.
25 524 10 552.
26 533.
11 547.
27 534.
12 545.
28 533.
13 540.
29 525.
14 540.
30 526.
15 537.
16 537.
1.16 -8 KO$$of]f PDR
i i
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 12/01/82 COMFLETED BY FRANCES HARRISON TELEPhCNE 919-457-9521 i
GPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 kNOTEb k
- 2. REPORTING PERIOD: NOVEMBER 82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE) : 867.0 I
I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTr l
GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR HESTRICTION IF ANY:
1 l
THIS-YR TO CUMUL MONTH DATE ATIVE f
i
- 11. HOURS TN REPORTING PERIOD 720.0 8016.0 50017.0 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5381.6 33646.9 i
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1 l
- 14. HOURS GENERATOR ON LINE 720.0 51e8.7 31728.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1201154.9 - 9101475.4 63519280.1 j
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 393308.0 2934461.0 20935669.0
- 18. NET ELECTRICIAL ENERGY GENERATED ( NA H )
378031.0 2803430.0 20106927.0
- 19. UNIT SERVICE FACTOR 100.0 64.7 63.4
- 20. UNIT AVAILABILITY FACTOR 100.0 64.7 63.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 66.5 44.3 50.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 64.0 42.6 49.0
- 23. UNIT FORCED OUTAGE RATE ci. 0 34.0 24.2
- 24. SHUTDOWNS SCHEDULED OVER NEAT 6 MONTHS (T(PEr DATER AND DURATION OF EACH):
Refueling 12/20/82-05/12/83 22 weeks
- 25. IF SHUTDGWN AT END OF REPORT PERIOD, ESTIMATED DATE OF 9 TART UP:
O/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCA3T ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMERICIAL OPERA ~ ION
- 1. l o - 9
~ - -
APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: December 1982 COMPLETED BY: Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1 operated at 100% availability factor for-the month of November with a 66.5% capacity factor. There were two power reductions this month.
Both are detailed in Appendix D, the unit shutdowns and power reductions log.
There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick No. I fuel pool.
Brunswick Unit No. 1 is operating at reduced power because of fuel depletion.
- COMPLETED OCTOBER REPORTS ATTACHED l
t l
t
- - - - - ~ ~ ~ - - -
~.
9.
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0324
~.
UNIT NAME Brunswick 2
~
DATE _Nover.ber 1982 REPORT MONT!! October COMPLETED BY _ Frances Harrisor.
TELEPHONE _ (919) 457-9521 q
c-
-re
- 5.a 2 t'
N 3
S C*"*# E C""'C8IV' "I#
vent 8E rE 3i 5 =
Report #
- d Ed Action to 6
Prevent Recurrence
-c a
82-059 821010 F
175.7 A-3 NA SB PIPEXX Reactor scram.
Cracks in heater drain piping. Loss of E-3 Bus #3 diesel generator output breaker would not close in on E-3 bbs.
~
The fiss' ion' type linear indicctions in ti e tubular support and the header were satisfactorily repaired )y%1 ding per MP-30 Rev. 6. Proposed action to prevent l
recurrence is to change.the type of l
support.
?
I
?
3 3
4 I.I $Iment F.iilure(Explain)
-?)a$[u'It S
lS:Sehe led 1
~
B Maintenance or Test r
p rat on of ta 2 Manual Scram.
h,I,[. ",#3 "8,j,,y g,,,,g,;,,
AAutinnatic Scram.
Entry Sheets for Licensee Event Report (LER) File (NUREG.
F Opeuros hining & l.iecuse lixamination 4-ContinuaeIons 0161)
F Administiative 5 *,ad Reductions.
5 gti : al tror(Explain) 6
.hcr Exhibh 1. Same Source
.. s u._
O n.-
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0195 UNIT NAME Rnmc f 4 1
~
DATE November 1982 REPORTMONTI! _0ctober COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 g
',5 v> 2 E.~
re 5.
.E X Licensee E,
ec sc E
q,,*
- p3g, a
E Cause & Currectgye h
y.E y
i5E Event 5$
8.d.
- 5=
Report a
- 0 E
Action tu oc c:
=i o
6.-
Prevent Reeurtence
!-95 821021 F
94.3 B' '
3 NA h
TURBIN.'
s i
Reactor scram. Turbine load unbalance test with CV closure.
I e
e,
[
Adjustments were made on the A01 card to adjust {he readings at TP1, TD2 & D 3 -
to obtain current readings and also to.
balance the readings at these testpoints.
. =.
i -
3
, !!i) i) ment Failure (Explain)
- ta$
1 Exhibit G. Instructions Sch rd B41aintenance of Test for Prepstation of Dsts l
9'M 8nu I Sctsm.
p,p, find.
Entry Sheets for Licensee f
.D Repta i ty Itesirietion A uto nia c crain.
Event Riport (LER) File (NUJ:.EC...
L' 0;ici.iios Ti.iining A 1.lecuso !!xaminathm l# Administiative 4-CentInuatIons 0161)
G Operational Error (Explain) 3-1 d Reductions,.
3 II-Other (Exn12ini Othorp F)
Em u m t. e,.-
c -
--- J
s
.e s.
. 's u....
~ O o
UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-Om
~
UNIT NAME _ Brunswick 1 DATE November 1982 4
COMPLETED BY _ Frances Harrison REPORT MONT!!*
')c enhv-TELEPl!ONE _(919) 457-9521 s
L i
"L
's s. E
=
c.
e.
No.
Date E.
k,,I' 45
~8 5 d LI##"5
5*=
$*o Cause & Correceive N
E.r g
.g 3 cc Eunt u7
- n. o.
c5=g Report #
' # c.,
E Action to c
a:
c..
x 4
6 event Recurrence o
2-97 821030 F
9.5 i'
S
~ NA
'{
XX PIDiPXX Reciic. pump tripped.
Respliced the,wirt s for 1-B21-PS-N045C., '
insulated splices and spare wires to
+
,[
prevent tuem from shorting. Dried moisture
's q>
from pull box and insulated wires.
3
~
I
<s
~
~
.{ -,
3 3
F: Forced Reason:
4 Method:
S: Scheduled Exhibit C. Instructions A li uipment Failure (Explain) 1 Manual t
!1 Maintenance of Test for heparation of Data 2-Manual Scram.
Entry Sheets for Licensee C Refucting 3 Automatic Scram.
Event Repos: (LER) File (NUREC..
D Regulatory Itestriction
" Oisciaio Tiaining & IJesuse lixamination b"C"'tI""3CI005 0161)
F Adininistnative 5-L.d Reductions.
5 C Operational, Err,ut (Explain) 6 Other m
n a n. u.. w.
8'^---"--
--~-
.w s.
. o _.
O O
o
~
(JNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0125 UNIT NAME Brunswick I DATE November 1982 COMPLETED BY Frances Harrison REPORTMONTH October TELEPHONE (919) 457-9521 3
g
'5 a 3 5 't
.=E c.
e E
m.5 ;i Licensee g,r a
Cause & Corrective o
c Co.
Date
- g; 3g g
,g g 5 Event u4 E 3-Action to j g5 g
, Report
- Nd jO Prevent Recurrence
$ E, 5
C
-98 821031 F
9.0 A-5 NA XX XXXXXX Reduced power to less than 30 percent' s
due to EHC-PSL-1759 problems.
P.T. 1. 3. 2.P-1 to be performed agairl' to insure gwitch operates correctly..*
l
~
l y
3 3
4
- Forced Resson:
Method:
Exhibit C. Instructions r Scheduled A l'iguipment Failure (Explain) 1 Manual for Prepsration of Data B. Maintenance of Test
- 2. Manual Scram.
c
)
C. Refueling
- 3. Automatic Scram.
Event Report (LER) File (NUREC.
Entry Sheets for Licensee D-Regulatory Restrie: tun 13 Opeiaion Tiaining 41.leenso l'.xamination 4-r 7tInuations 0161) 13.ndminist ative
,5. ad Reductions..
5
~
y Q-n n
8 i
050-0325 DOCKETNO.
UNITSilUTDOWNS AND POWER REDUCTIONS Brunswick 1 UNIT NA51E DATE December 1982 Frances flarrison REPORTMONTH _ NOVEMBER 1982 CO5fPLETED BY (919)457-9321 TELEPHONE 6
A r-Q k
,$g
.5 ;
~ ' Licensee E
Cause & Corrective
,g g*",
y S
$5 5
js N,
Event
?
o.
Action to Mg
.3 E 5 No.
Date c-Report #
N0
$b Prevent Recurrence u
4 g
C p
service. power - 1B RFPT removed from Redu-ed 82-107 821104 F
7.3 A
5 NA A
PUMPXX R
i P
1 him RNE thrust benh E.b was kce.me'd and e
was returne serv l-l f
t i
i
?
1 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions I
S: Scheduled A l'iiuipment railure (Explain).
l Manual for Pseparation of Data Il Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) Fi!c(NUREG-D Regulatory Restriction 4 Continuations 0161)
E Operator Training & Ucense Examination 5-Load Reductions 5
F. Administrative 64ther G-Operational Error (Explain)
Exhibit I.Same Source j
(9/77) li-Other (Explain) i s,. **
1 F
A
p.
p o
t DOCKET NO. nsn-n t?s UNITSHUTDOWNS AND POWER REDUCTIONS UNIT N.O!E Brunswick I December 1982 DATE NOVEMBER 1982 COMPLETED DY Frances Harrison REPORT MONT11 TELEPHONE (919) 457-9521
'e 4
r-E c
,: ?
3 4.5 Ii
' Licensee Eg j%
Cause & Corrective
.[
No.
Da'..
g 3g i;
.8 y 5 Event gg pO Action su H
f5 5
js if3,
Report #
mV Prevent Recurrence o
U c
b 82-112' 821117 F
39.8 A
5 NA IIC ITEXCH Reduced power for waterbox work.
Plugged several tubes.
i.
j-r f
T f
g 3
3 4
?
F: Forced Reston:
Meihod:
Exhibit C Instructions T
5: Scheduled A.I'quipment failure (Explain).
1 Manual for Preparation of Dai, Il Maintenance of Test 2 Manual Scram.
Entry Sheets for Licens6 -
C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161)
E Operator Training & License Examination F. Administrative
~
5-Load Reductions 6.Other I
a G. Operational Errur (Explain)
Exhibit ! Same Sourec
}
(9/77)
Il-Other(Explain)
- r.. *
.-~
~ _.
OPERATING DATA REPORT t
DOCKET NO. 050-0324 DALE 12/01/82 COMPLETED BY' FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS'
-1.-UNIT NAME: BRUNSWICK UNIT 2
'I NOTES I
- 2. REPORTING PERIOD: NOVEMBER 82 I
I i
3.' LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. NAMEPLATE RATING.(GROSS MWE): 867.0 -
I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I i
- 6. M4X DEPENDA3LE CAPACITY (GROSS MWE): 815.0 I-I-
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 I
-8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
)
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE 4
- 10. REASONS FOR RESTRICTION IF ANY:
i THIS YR TO CUMUL-MONTH DATE ATIVE l
- 11. HOURS IN REPORTING PERIOD 720.0 8016.0 62041.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2975.8 38142.7 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 6.G 0.0 0.0
- 14. HOURS GENERATOR ON LINE-0.0 2785.3 35554.6
- 15. UNIT RESERVE SHUTDOWN HOURS-0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0,0 5025312.2 65022849.3
. 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 1589624.0 21583561.0
- 18. NET ELECTRICIAL ENERGY GENERATED ( MWH)
-7387.0 1484411.0 20673813.6 4
- 19. UNIT SERVICE FACTOR 0.0 34.7 57.3
- 20. UNIT AVAILABILITY FACTOR 0.0 34.7 57.3 j~
- 21. UNIT CAPACITY FACTOR-(USING MDC NET)
-1,3 23.4 42.2
- 22. UNIT-CAPACITY FACTOR (USING DER NET)
-1.2 22.6 40.6 l
- 23. UNIT FORCED OUTAGE RATE 100.0 31.8 18.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1 1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/ 2/82
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPER ATION) : FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY l
CONMERICIAL OPERATION 1.16 - 9 4
.cy,.
-, ye
,.y..
-.,,----,.,-,,w,-,,-.,
..,.w, s,.w.-e-n.v.
,.-w,,,n.,
v.,m_.,,,v.,,-+,
n-,--~,-v.,,,,,,--,.,,,.,._-_,,,y.,n...
.J
i APPENDIX B j
AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 3
UNIT BRUNSWICK UNIT 2 j
t DATE 12/01/82
-COMPLETED BY FRANCES HARRISON ?
TELEPHONE 919-457-9521 j
NOVEMBER 82 3
DAY AVG. DAILY POWER LEVEL DAY AVG DAILY POWER LEVEL' i
I (MWE-NET)
(MWE-NET) l l
1
-12.
17
-10.
l 2~
-11.
18
-10.
i 3
-11.
19
-10.
4
-11.
20
-11 s
5
-11.
21 t
6
-10.
22
-12.
4 7.
-10.
23
-11.
f a
8
-10.
24
-10.
9
-10.
25
-?.
10
-19.
26
-9.
11
-10.
27
-9.
12
-10.
28
-9.
1 13
-9.
29
-9.
14
-9.
30
-8.
15
-11.
i l
16
-11.
T i
~
r 1.16 - 8
APPENDIX' DOCKET NO.:
050-324 UNIT: Brunswick No. 2 DATE: December 1982 4
)
COMPLETED BY: Francis Harrison i
OPERATIONS
SUMMARY
I BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 was off line the month of. November for a maintenance outage.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
i t
l J
I I
~
~
s 050-0324 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS Brunswick 2 UNIT N.O!E December ISS4 DATE COMPLETED BY _ Frances Harrison Nov.
REPORT MONT11 TELEPIIONE (919) 457-9521 I
Sc Q
f8
,{g
'h k.ll f; 1,
Cause & Corrective f
' Licensec Eg Action to No.
Date g
3g 5
.s s 5 Event p
gO Prevent Recurrence 6-
$ E, e2 ji" 5
- Report #
mO
.c o
U
.a 6
l.82-064 821028 F
720 A
4 N/A
,XX XXXXXX Maintenance Outage t
~
~
i I. -
I i
T I
I 2
3 4
5: Scheduled A l'iiuipment failure (Explain)
Method:
Exhibit G. Instructions F: Fori:ed Reason:
for Preparation of Data
[
1 Manual H. Maintenance of Test 2-Manual Scram.
Entry Sheets for Liecusee C.Itefueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D.Itegulatory ltestriction 4 Continuations 0161)
E Operator Training & Ucense Examination 5-Load Reductions F-Administrative 6-Other 3
2 G-Operational Errur (Explain)
Exhibit I-Same Source (9/77)
Il Other (Explain) t
=.
ft