Text
.
E' PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHI A. PA.19101
( 15)841-4502 December 6, 1982 JOHN S. K EMPER VICE PRESIDENT ent.ans a mano amo matt Ance Mr. A. Schwencer, Chief Docket Nos. 50-352 Licensing Branch No. 2 50-353 Division of Licensing U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555
Subject:
Limerick Generating Station Units 1 and 2 Request for Information on Emergency Operations Facility
Dear Mr. Schwencer:
In accordance with Dr. Harvey Abelson's verbal request of December 3, 1982 for information on the Limerick Emergency Operations Facility (EOF), we are pleased to provide you with the answers to the following questions:
- 1. On what date did Philadelphia Electric Company respond to generic letter 81-10, dated 2-18-81, on EOF's?
Answer:
March 20, 1981 via letter from J.
S.
Kemper to D. G.
Eisenhut.
l 2.
From the emergency plan, what is the permanent EOF location?
Answer:
As stated in section 7.1.2 of the Emergency Plan, the EOF is located at Philadelphia Electric Company's Plymouth Service Building, 17 miles from the site.
- 3. What type of structure is the EOF?
Answer:
The EOF will be located in the windowless basement of an existing concrete and steel framed masonry building.
- 4. What is the protection factor of the EOF?
l Answer:
Because of the EOF's distance from l
the site, no protection factor is l
being identified.
This is in l
accordance with NUREG-0696.
8212100090 821206 PDR ADOCK 05000352 F
'.O
. 5. When was construction started?
Answer:
The structure is complete.
All construction will be complete by September, 1983.
- 6. What is the status of construction of the structure only?
Answer:
The structure is complete.
Answer:
No, because of the distance from the site HEPA filters are not required by NUREG-0696.
- 8. Where is the permanent back-up EOF?
Answer:
There is no back-up EOF.
- 9. Where is the interim primary EOF located?
Answer:
As the plant is not operating, there is no interim primary EOF.
l
- 10. Where is the interim back-up EOF located?
Answer:
There is no interim back-up EOF.
I We trust these responses satisfy.your need for this l
i information.
i l
Very truly yours,
[ fM[
j f
J. S. Kemper f
JTR/pb/C-12 i
cc:
See attached service list I
I I
l n.,
.f cc:
Judge Lawrence Brenner Judge Richard F. Cole Judge Peter A. Morris Troy B.
Conner, Jr., Esq.
Ann P. Hodgdon Mr. Frank R.
Romano Mr. Robert L.
Anthony Mr. Marvin I. Lewis Judith A.
Dorsey, Esq.
Charles W. Elliott, Esq.
Mr. Alan J. Nogee Robert W. Adler, Esq.
Mr. Thomas Gerusky Director, Pennsylvania Emergency Management Agency Mr. Steven P. Hershey James M. Neill, Esq.
Donald S. Bronstein, Esq.
Mr. Joseph H. White, III Dr. Judith H. Johnsrud Walter W.
Cohen, Esq.
Robert J. Sugarman, Esq.
Mr. W. Wilson Goode Atomic Safety and Licensing Appeal Board Atomic Safety and Licensing Board Panel Docket and Service Section l