ML20067C224

From kanterella
Jump to navigation Jump to search
Forwards Revised Page 16.2-1 of Rev 2 to Selected Licensee Commitments Manual
ML20067C224
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1991
From: Reavis J
DUKE POWER CO.
To:
NRC
References
NUDOCS 9102110257
Download: ML20067C224 (5)


Text

ll l

ink, na vi comparu, 77;q,g,,v,,

%,le ur Pn>Ja; tm thparhnet l* t) flvt j~ v' cha!vne \\r: gltvi V'

h, DUNC POWER January.'1, 1991

Subject:

Catawba Nuclear Station, Units 1 & 2 Selected Licensee Commitments Manual Revision 2 Please find attached a copy of Revision 2 to the subject manual.

Update your manual as follows:

Remove these pages insert these pages, L0E91,2,3 L0EP1,2,3 16.2-1 16.2-1 If you have any questions, please contact me at 373-7567.

p R.L. Gill, Jr. Technical System Mana0er

(

Regulatory Compliance iQ

%).1 b<%uw J rel Reavis h gulatory Compliance rs l C' 3,

0

>\\ \\

[fj21102579]o133 P

ADOCK 05o99433 PDR

l 4

DUKE POWER COMPANY

)

O CATAWBA NUCLEAR STATION

' SELECTED LICENSEE COMMITMENTS MANUAL LIST OF EFFECTIVE PAGES Page Revision Date LOEP 1 1/91 L0EP 2 12/90 LOEP 3 7/90 Tab 16.0 16.0-1 12/90 Tab 16.1 16.1-1 Tab 16.2 16,2-1 16.2-2 1/91 16.2-3 Tab 16.3 Tab 16.4 Tab 16.5 Tab 16.6 Tab'16.7 Tab 16.8 Tab 16.9 16.9-0 12/90 16.9-1 12/90 16.9-2

-12/90 16.9-3 12/90 0

16.9-4 12/90-Page 1 1/91-

t g

Revision Date 16.9-5 12/90 16.9-6 12/90 16.9-7 12/90 16.9-8 12/90 16.9-9 12/90 16.9-10 12/90 16.9-11 12/90 16,9-12

'12/90 16.9-13 12/90 16.9-14 12/90 16.9-15 12/90 j

16.9-16 12/90 16.9-17 12/90 Table 16.9-31 of 5 12/90 Table 16.9 3 2 of 5 12/90 Table 16.9-3 3 of 5 12/90 Table 16.9-3 4 of 5' 12/90 Table 16.9-3 5 of 5 12/90 Tab 16.10 l

Tab 16.11 i

Tab 16.12 Tab 16.13 16.13-0 12/90 i~

l'

'16;13-1 12/90 l.'

1@

Page 2 12/90

1 l

4 m

a i

i l

t, Revision Date l

P, age Tab 16.14 Tab 16.15 i

i Appendix j

1 Directive 3.1.5 1 of 7

]

Directice 3.1.5 2 of 7 Directice 3.1.5 3 of 7 I

Directive 3.1.5 4 of 7 Directive 3.1.5 5 of 7 Directive 3.1.5 6 of 7 Directive 3.1.5 7 of 7 Directive 3.1.5 Attachment 1 1 of 1 i

Directive 3.1.5 Attachment 2 1 of 1 i

Directive 3.1.5 Attachment 3 1 of 1 Directive 3.1.5 Attachment 4 1 of 1 Directive 3.1.5 Attachment 5 1 of 1 i

i 1

1 t

Page 3 7/90

6 CNS 16.2 APPLICABILITY This section provides the general requirements applicable to each of the commitments and Testing Requirements within Section 16.0, Selected Licensee Commitments (SLCs).

16.2.1 Compliance with the SLCs is required as specified.

When a Commitment is not met, the associated Remedial Action (s) shall be mut.

16.2.2 Noncompliance with a Commitment exists when the requirements of both the Commitment and the specified Remedial Action are not met within the specified time.

If compliance with a Commitment is restored prior to expira-tion of the specified time interval completion of the Remedial Action (s) is not required.

16.2.3 Where corrective measures are completed that permit operation under the Remedial Actions, the action may be taken within the specified time limits, as measured from the time of f ailure to n.eet the Commitment.

16.2.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made when the conditions for the Commitment are not met and the associ-ated Remedial Action requires a shutdown if they are not met within a specified time interval.

Entry into an OPERATIONAL MODE or specified condition may be made in accordance with the Remedial Action requirements when conformance to them permits continued operation of the facility for an unlimited period of p

time.

This provision shall not prevent passage through or to OPERATIONAL g

MODES as required to comply with Remedial Acticn requirements.

Exceptions to these requirements are stated in the individual commitments.

16.2.5 Commitments including the associated Remedial Actions shall apply to each unit individually unless otherwise indicated as follows:

a.

Whenever the Commitment refers to systems or components which are shared by both units, the Remedial Actions will. apply to both units simultaneously.

This will be indicated in the Remedial Actions; b.

Whenever the Commitment applies to only one unit, this will be identified in the APPLICABILITY section of the Commitment; and c.

Whenever certain portions of a Commitment contain operating para-meters, setpoints etc., which are different for each unit, this will be identified in parentheses or footnotes.

( for example, ",.. flow rate of 54,000 cfm (Unit 1) or 43,000 cfm (Unit 2)..

").

l 16.2.6 Testing Procedures shall be performed during the OPERATIONAL MODES i

or other conditions specified for an individual commitment unless otherwise stated in an individual Testing Procedure or Reference.

16.2.7 Each Testing Procedure shall be performed on its specified frequency with a maximum allowable extension not to exceed 25% of the test frequency.

l g

The phrase "at least" associated with a' testing f requency does not negate this tolerance value, and permits the performance of more frequent surveillance la.2-1 1/91