Forwards Emergency Preparedness Exercise Objectives for Annual Emergency Preparedness Exercise Scheduled on 910423. Complete Scenario,W/Controller Info & Simulation Data,Will Be Submitted No Later than 45 Days Prior Exercise
ML20067C179
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/05/1991
From: Floyd S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-91-030, NLS-91-30, NUDOCS 9102110241
Download: ML20067C179 (5)


Text

"

3 i

i Carolina Power & Ught Company..

"'^'

FEB 0 51991 u

j United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-J BRUNSWICK STEAM. ELECTRIC PIANT, UNIT NOS. - 1 AND 2 1

DOCKET NOS. 50 325 AND 50 324/ LICENSE NOS. DPR 71 AND.DPR.62 1

EMERCENCY PREPAREDNESS EXERCISE OBJECTIVES g

1 Centlemen:

'l Carolina Power & Light Company l(CP&L) hereby' submits the scope and objectives il of the: forthcoming Brunswick Steam Electric Plant (BSEP)4 Annual Emergency Preparedness Exercise.

The exercise-is currently scheduled to commence on gI April 23, 1991.. A complete _ exercise scenario with controller information and

(

~

simulation data will be submitted no later than 45 days prior to the.atart of-the exercise.

l Please refer any questions regarding this submittal to Mr. M. R. Oates at (919) 546 6063.

1

-l Yours very truly, J

~

S. D. Floy

)

Manager Nuclear Licensing Seetion.

DJK/jbw (981BNP)

Enclosure.

cc:.

Mr. S. D. Ebneter Mr. N. B. Le Mr. R. L.-Prevatte t

[

kVi a

' 441. Fayenerme Spect

  • P' O. Bos 1551. nate.gh, N C: ??UR -

l'

.. :,7 -

..,.x

..g.

-]

gag....,

9102110241 93npo$

-s y

fDR ADOCK 0500 4

..b.

l

~

i ENCLOSURE

.l l

-)

BRUNSWICK STEAM ELECTRIC PIANT, UNIT NOS.1. AND 2 I

NRC DOCKETS 50-325 AND 50 324-OPERATING LICENSES DPR 71 AND DPR 62-ENERGENCY PREPAREDNESS EEERCISE OBJECTIVEft

)

i j

]

1 i

.. _.. ~ _ _ _ _.

CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT EMERGENCY EXERCISE APRIL 23, 1991 I.

MISSIOR AUD PURPOSE QE EXERCISE To activate and ovaluate major portions of omergency responso capabilities and other elomonts of the CP&L Brunswick Steam Electric Plant Plan, associated implomonting procedures, and the CP&L Corporate Emergoney Plans in accordance with Nuclear Regulatory Commission (NRC) Regulation 10CFR50.47(b).

II. SCOPE AHQ OBJECTIVES A.

Scopo A simulated accident at the Brunswick Steam Electric Plant (BSEP) which could oscalato to a general omergency and will involve planned responso and recovery actions to includes emergency classification; notification of off-site organizations and plant personnel; actions to correct the omorgency conditions; and initiation of accident assessment and protectivo ac~ ions as necessary to cope with the accident.

The exorciso will simulate an omorgoney wnich requ2ros response by state and local government personnel (stato and county participation will be simulated).

B.

Obiectivos The 1991 Brunswick emergency Preparodness Exorciso will provido an opportunity for omorgency responso personnel to:

1.

Demonstrato the capability of on-site personnel to offectively utilize the omorgency action level scheme.

2..

Demonstrate the adequacy of the control room staff in control and accident mitigation activitios along with accident assessment.

l l

. _-.-. _.~.- -.- -. -.-

1 l

r 3.

Demonstrate the adequacy of procedures for alerting, notifying, and mobilizing emergency i

response personnel (some individuals will be pre-staged within the-local area).

4.

Demonstrate that communications capabilities exist to accomplish notification of_off-site agenciesc l

5.

Demonstrate the capability to. notify off-site authorities'within 15 minutes of the emergency classification.

1 6

6.

Demonstrate the adequacy.of-the information l

provided in the initial notification, as well as follow-up notificationLto the state and counties.

7.

Demonstrate the ability to make follow-up notifications to'the off-site agencies within 60 minutes of the completion of the previous notification..

8.

Demonstrate the capability of personnel to activate the Technical Support Center, Operations Support Center, and Emergency operations Facility as described in the emergency plan and procedures.

)

9.

Demonstrate the transfer offresponsibility.

betwoon emergency response facilities as described in the plan and procedures.

10..

Demonstrate-the capability to communicate betwoon emergency response facilities.

11.

. Demonstrate the adequacy-of the operations Support Center in providing manpower support and coordination.

l -

12.. Demonstrate the adequacy of.the Technical Support center in providing accident

- assessment and mitigation, dose assessment, and communication / notification' activities.

l

13.. Demonstrate the adequacy-ofLthe Emergency

- operations Facility in coordinating off-site utility-activities.

)

r

,. se ry t--e-%<=

, -., -nww+-,.,=

+

ie

..w-

~v.-

.,m.,

,+,wr. r r:-+,,.y-

-w.,ww..,

yye.

4.m.-m--

.m., w r i.- -

,-y f

-rw y-g-

i t

14.

Demonstrate record keeping requirements as doccribed in the plan and proceduros.

15.

Demonstrate that status boards are maintained and updated.

16.

Demonstrato the capability to provido adoquate radiation protection services such as dosimetry and personnel monitoring.

17.

Demonstrate the capability to perform radiological monitoring activition and assessments.

18.

Demonstrate the capability to support the radiological assessment process while maintaining personnel radiation exposure os low as reasonably achievable.

19.

Demonstrate the capability to perform accountability of the protected area within 20 minutos from the time of the order for-accountability.

20.

Demonstrate those NRC identified open items resulting from the 1990 BSEP exercise.

,