Final Deficiency Rept DER 82-58 Re Cooper Energy Svcs Diesel Generator High Voltage Cubicles W/O Seismically Qualified Design.Initially Reported on 821021.Anchorage Will Be Provided on All Four Sides.Also Reportable Under Part 21
ML20067B695
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, ANPP-22365-GHD, DER-82-58, NUDOCS 8212060275
Download: ML20067B695 (3)


Text

Docket Nos. 50-528/529/530

  1. ^

50.55 (e) Report tifqf e,Sc,[

Arizona Public Service Company; P O. BOX 21666. PHOENIX, ARIZONA 85036 G f:S 4.y,,,E(c 9

November 22, 1982 e

ANPP-22365-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Final Report - DER 82-58 A 50.55(e) Potentially Reportable Condition Relating to Diesel Generator Iligh Voltage Cubicles and Foundations Have Bolts On Three Sides, But Seismic Qualification Test Used Bolts On Four Sides File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 21, 1982

Dear Sir:

Attached is our final written report of the Reportable Deficiency, under 10CFR50.55(e), referenced above.

Very truly yours, e_.

C11.L

'O LLk [

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVILTr/GIID:db Enclosure cc: See Attached Page 2 0212060275 821122 PDR ADOCK 05000528 PDR S

r p.'

U. S. Nuclear Regulatory Commission November 22, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22365-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabei; Esq.

Harmon & Weiss 1725 "1" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

r

y.
  • i FINAL REPORT - DER 82-58 DEFICIENCY EVALUATION 50.55(e)-

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2 & 3 I.

DESCRIPTION OF DEFICIENCY liigh Voltage Cubicles 1, 2, 3-J-DGAB-B03 supplied by Cooper Energy Services are seisnic category I per specification 10407-13-MM-018.

Vendor installation drawing imi-018-209 shows anchor bolt holes on-three (3) sides of the cubicle. Cubicles were qualified by a shake test on one of the cubicles.

The Units 2 and 3 liigh Voltage Cubicles have anchor bolt holes on three (3) sides as per referenced drawing; however, the Unit 1 N/

panels have anchor bolt holes on four (4) sides. Vendor confirmed in telecon, and confirmed in writing, that a Unit 1 cubicle was used for the qualification test using anchor bolt holes on four (4) sides. Units 1, 2 and 3 cubicle foundations were designed'using the vendor drawing, which is not in agreement with the qualification mounting; therefore, the cubicles as installed'are not seismically qualified.

,[

This condition was inadvertently found during an engineering walkdown of the diesel generator installation, and subsequent telecon with supplier. The qualification documentation submitted to Bechtel did not specify the particular anchorage used for the shake test.

^

II.

ANALYSIS OF SAFETY IMPLICATION This condition is evaluated as reportable. The cubicles as Installed are not, seismically qualified and therefore nay~not be capable of perforning their safety related function in the event of a Safe-Shutdown Earthquake.

t y

'l III. CORRECTIVE ACTION h

2L For Unit 1, Design Change Package 1SH-DG-022 will be issued to

-l,~

provide an acceptable anchorage on four (4) sides. This carrection will be developed first on Unit 2.

For Unit 2, NCR ?tG-1112 and FCR will be used to implement a repair which provides the required anchorage. For Unit 3, Cooper will provide mounting holes for anchorage on four (4) sides. Tha Bechtel foundation' design will'be,.

~

updated to accommodate this correction.

In addition to reportability under 10CFR50.'55(e), PVNGS Project- !

considers the deficiency to be rep 3rtable under the requirementsiof 10CFR Part 21 by the supplier. Deficiency Evaluation Report 82-38' '

addresses the reporting requirements specified under 10CFR

\\

[

i 21.21.(b) (3) with the exception of sub-part (vi) which requires s

the number and location (customer and/or facilities) of other I

possible defective equipment. A copy of this DER has been sent to

't

~

Cooper Energy requesting their review for reporting under 10CFR Part 21.

, s G

/

-^

i ;

s F

)

n

.-,~