Interim Deficiency Rept Re Instrument Ac Circuit Breakers Left Set Below Trip Range After Testing.Initially Reported on 820806.Extension Requested to Submit Final Rept Until 821229 Due to Extensive Investigation & Evaluation
ML20067B598
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22364-GHD, DER-82-40, NUDOCS 8212060240
Download: ML20067B598 (2)


Text

a Docket Nos. 50-528/529/530

.w y

50.55(e) Report G' sp8 Ec,,! g*,,/

Arizona Public Service Company P.O. BOX 21666. PHOENIX, AR! ZONA 85036 ANPP-22364-GHD/Bhft'6fg3,

2'- [i November 22, 1989

~

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 !! aria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-40 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Instrument AC Circuit Breakers Were Left Set Below Trip Range After Testing.

File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on August 6, 1982 (B) ANPP-21763 dated September 2, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potential reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by November 22, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 29, 1982, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

}

Very tiuly yours, r

l - - --

.c C.

CLtt

%LL,

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management I

ANPP Project Director 1

l

"[6}7 EEVRIr/Gi!D:db Enclosure cc: See Attached Page 2 8212060240 821122 PDR-ADOCK 05000528 l

S PDR l

-v U. S. Nuclear Regulatory Commission November 22, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22364-GHD/BSK Page 2 f

i cc: Richard DeYoung, Director Office of Inspection and Enforcement t

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l

. T. G. Woods, Jr.

J. A. Roedel i

D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan J

W. E. Ide J. Vorces J. A. Brand l

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson i

L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabei, Esq.

Harmon & Weiss j

1725 "I" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General

{

Bataan Memorial Building Santa Fe, New Mexico 87503 I