Enclosure to Sarini: RSEP/82-1988 Page 1 of 3 OPERATING DATA REPORT DOCRET NO: 50-261 DATE: R91?nt N
COMPLETED BY:
H. Rav Norris TELEPHONE:
(803) 383-4524 OPERATING STATUS Notes:
- 1. Unit Name:
H. B. Robinson Unit #2
- 2. Reporting Period: 821101, 0000 / 821130, 2400 There are presently 157 spent fuel
- 3. Licensed Thermal Power.(FMt): 2300 assemblies in the spent fuel pool.
- 4. Nameplate Rating (Gross MUc):
739
- 5. Design Electrical Rating (Net MWe):
700
- 6. }bximum Dependable Capacity (Gross FMe): 700
, 7. Maximum Dependable Capacity (Net MWe):
665
-t
- 8. If Changes occur in Capacity Ratings (Item Number 3 throug13 1) Since Last Report, 91ve Reasons:
No Change
- 9. Power Level to Which Restricted, If Any (Net MWe):
1955 MWt Reactor Power
- 10. Reusons For Restrictions, If Any: Although the unit is not restricted by any outsloe the power level is presently reduced due to steam generator considerations.
- agency, This Month' Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 720 8016 102942
- 12. Number of Hours Reactor Was Critical 688.97 3786.9 76132.32
- 13. Reactor Reserve Shutdown Hours 31.03 31.03 1116.33
- 14. Hours Generhtor On-Line 687.2 3575.84 74131.15
- 15. Unit Reserve Shutdown Hours O'
0 23.20 16, Gross Thermal Energy Generated (MWH) 1265349.6 6372019.6 149467393.6
- 17. Cross Electrical Energy *Cencrated (FMH) 404872 2C14395 48092365
- 18. Not Electrical Energy Generated (MWH) 380823 1860227 45480478 j
- 19. Unit Service Factor 95.44 44.61 72.01 l
- 20. Unit Availability Factor 95.44 44.61 72.03
- 21. Unit Capacity Factor (Using MDC N'et) 79.54 34.89 66.44
- 22. Unit Capacity Factor (Using DER Net) 75.56 33.15 63.11 I
- 23. Unit Forced Outage Rate 4.32 7.86 14.29 l
- 24. Shutdowns Scheduled Over Next 6 lbnths (Type, Date, and Duration of Each):
Type Two 5/14/83, Four Week Steam Generator Inspection Outagei l
December 1, 1982
- 75..IC Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Connercial Operation):
Forecast Achicved i
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) 8212060201 821203 PDR ADOCK 05000261 R
PDR t
Enclosure to Serial: RSEP/82-1988
-' Page 3 of 3 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-261
- 11. B. Robinson UNIT DATE 821201 H. Ray Norris COMPLETED BY TELErilONE (803) 383-4524 MONT11 November DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER I.EVEL (MWe NetI (MWe Net) 563 563 g7 562 564 2
33 561 562 3
39 563 552 4
20 560 500 g
21 555 560 6
560 507 73 7
560 g
561 24 561 560 9
25 560 561 10 26 560 562 11 27 562 12 28
~
562 295 33 29 14 563 30 0
564 15 3,
564 16 INSTRUCTIONS On this format. list the av::se; daily unit power levelin Mwe. Net for each day in the reporting nwnth. Compute to the neuest whole rm:2 wit.
(9/77)
~
<1
+
~
l Enclosure to Serial: RSEP/ 82--1988 Page 2 of 3 i
DOCKET NO.
50-261 UNIT S!!UTDOWNS AND POWER REDUCTIONS UNIT N AME H.
B.
Robinson DATE R?1?nt COMPLETED BY u
% %,,4c REPORT MONTil November TELEPilONE (ROM ~ 183-4524 e.
E e
.! ?
3
$.Y 5 Licensec j r, Ev),
"Cause & Corrective N"-
DJte i.
5?
.i s 5 Event 37 h'
Action to uiO 5
Prevent Recurrence
~ s :1 Report 8 H
A, E c's i
u 9
WC VALVEX S/G chemistry was unacceptable due 11-01 821129.
1 3103 A
3 to mechanical failure of caustic injection valves. This resulted in inleakage of sodium hydroxide into the make-up water system and and from there into S/G's.,
The valves were replaced.
4 3
Exhibit G-Instructions 2
Method:
3
- 1. lariual for Preparatum of Data F: Forced Reawn:
S: Scheduled A l'quipment Failure (Explain).
2-Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Rep.nt (LER) Fde tNUREG-Il-Maintenance of Test C-Refueling 4.Other (Explain) 0161)
D.Reputato > Restriction E-Ope:atos Training & License Examination 5
F Adnunistrative Exhibit I-Same Source G Operational Error (Explain)
' 19/77)
Il-Other (Explain) g
... ~.