'GE O h, INDIANA & A'lCHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 November 24, 1982 Mr. J.G. Keppler, R'egional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This is to confirm a telephone call made at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br /> on November 23, 1982, to Mr.
N.E.
DuBry, NRC Region III Re-sident Inspector in accordance with Technical Specification 6.9.1.8.b.
On November 23, 1982, during a routine surveillance test of the Unit 1 Essential Service Water System (West Train),
motor operated valve WMO-753 would not open as required.
Further investigation determined that t.he valve was opera-ting in a reversed manner due to a Design Change which was performed on November 17, 1982, at the valves Motor Control Center.
The Design Change authorized the replacement of the existing cable which fed the Motor Control Center with a larger cable.
During the course of the installation, the leads of the new cable were reversed at the Motor Control Center.
The error was not discovered at the time and the Motor Control Center was returned to service.
The Motor Control Center also feeds a Turbine Driven Auxiliary Feed Pump Room exhaust fan.
Upon discovery on November 23, 1982, the problem was cor-rected and the associated equipment was restored to normal.
The requirements of Technical Specification 3.7.1.2 were not M
met due to the nature of the event and method of discovery.
$@u-A followup report will be submitted which provides a com-ao plete explanation of this event no later than December 7, EO 1982.
o gt Sincerely, 110V 2 9 1982 LU&a o<
.Jd{
Smith',tj-two W.G.
spr.
8D "
Plant Manager
{
T Mr. J.G.
Keppler November 24, 1982 Page 2
/bab cc:
J.E. Dolan R.S.
Hunter M.P. Alexich R.F.
Kroeger K.J. Vehstedt E.R. Swanson/N.E. DuBry RO:III R.C. Callen MPSC G. Charnoff, Esq.
J.M. Hennigan R.O. Bruggee EPRI INPO PNSRC J.P. Stietzel C.L. Townley Dir., IE (40 copies)
Dir., MIPC (4 copies) 1 i
i i
I
(
l l
l l
l l
l l
i I