Amend 171 to License DPR-65,incorporates Addl EDG Surveillance Requirement 4.8.1.1.2.C.8,items A,B & C,To TS 3/4.8, Electrical Power Sys
ML20067A579
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/14/1994
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Northeast Nuclear Energy Co (NNECO), Connecticut Light & Power Co, Western Massachusetts Electric Co
Shared Package
ML20067A581 List:
References
DPR-65-A-171 NUDOCS 9402180141
Download: ML20067A579 (3)


Text

.

. j 2.

Accordingly, the license is amended by changes to-the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.171, are hereby incorporated in the. license.

The licensee shall operate the. facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION J

. Stolz, Director j Fr ject Directorate I-4 /

D vision of Reactor Projects - I/II l

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical 1

Specifications i

Date of Issuance: February 14, 1994 i

l 9402180141 940214 PDR ADOCK 05000336 p

PDR j

ATTACHMENT TO LICENSE AMENDMENT NO.171 -

FACILITY OPERATING LICENSE NO. DPR-65.

DOCKET NO. 50-336 Replace the following page of the Appendix A Technical Specifications with the j

enclosed page. The revised page is identified by amendment number and.

contains vertical lines indicating the_ areas of change.

j i

Remove Insert-l 3/4 8-4 3/4 8-4 i

1

-)

i j

1

(

i 5

i i

I i

-~.

m

.....__s-2

(

l:

l ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENT (Cont.inued)

]

l c)

Verifying that on the safety injection actuation signal, all diesel generator trips,.' except' engine l

overspeed, generator differential current, voltage restraint overcurrent, and low lube oil pressure (2 out of 3) are automatically bypassed..

l i

6.

Verifying the diesel generator.operat'es for.1 60 minutes.

{

while leaded to 12750- kw.

7.

Verifying that the auto-connect loads to each diesel-generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />' rating of 3000 kw.

8.

Verifying that on an actual or simulated Safety Injection i

Actuation Signal (SIAS) without a loss'of offsite power:

a.

The diesel generator starts on the auto-start signal l

and operates on Standby for greater than 5 minutes; b.

The generator frequency and voltage shall reach 58.8

.to 61.2 Hertz, and 3740 to 4580 VAC, and be maintained during this test;-

l l

c.

The diesel start time (time to reach 90% of rated speed and 97% of rated voltage) shall be less than or equal to 15 seconds, i

l l

I MILLSTONE - UNIT 2 3/4 8-4 Amendment'No.f), 191.171 0096