Forwards Table 1, Summary of CPR Adjustments for Oyster Creek Cycle 13 Channel Bow at Most Limiting Time in Core Life for CPR (5.5 Gwd/Mt), in Response to NRC Request for Addl Info Re 901231 Submittal
ML20066H126
Person / Time
Site: Oyster Creek
Issue date: 02/13/1991
From: Devine J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
5000-91-2021, C320-91-2055, NUDOCS 9102200176
Download: ML20066H126 (2)


Text

_ _ - _ _ _ - _ _

.v GPU Nuclear Corporation NUCaw5En -

hegn One Upper Pond Road Parsippany, New Jersey 07054

. 201 316-7000 TELEX 136 482 Writer's Direct Dial Number:

February 13,'1991-5000-91-2021 C320-91-2055 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen

SUBJECT:

OYSTER CREEK NUCLEAR GENERATIN STATION (OCNGS)

DOCKET No. 50-219, LICENSE NO. DPR-16 OYSTER CREEK FUEL CHANNEL BOWING Ref9rences (1) GPU Nuclear Letter, December 31, 1990, " Cycle 13 Specific Analysis - Fuel Channel Bowing."

Reference (1) provided the Oyster Creek, cycle 13 specj2ic analysis for-fuel channel bowing to the NRC.

As part of the NRC's technical review of this submittal, a request was made for additional information.

Attached to this letter is Table.1, " Summary of the CPR Adjustments'for Oyster Creek Cycle 13 Channel Bow at the Most Limiting' Time in Core Life for CPR (5.5 GWD/HT)," which supplies the requested information.

If you have any questions on this submittal, please contact Mr. hichael Laggart, Manager, Corporate. Nuclear Licensing at-(201) 316-7968.

Sincerely, G'

f.A.be ta,e, sv.

J.

C.

Devine, Jr.

Vice President, Technical Functions JCD/RZ/ pip Attachment cci Administrator, Region 1 NRC Resident Inspector NRC Oyster Creek Project'Hanager D

9102200176 910213

. s./

PDR ADOCK 05000219 i

gg/

-l P

PDR e-p-

R2:C3202055 f /' j

, f GPU NurJear Corporahon la a subsdiary of General Public Ut:fities Corporation f

I

I 4

TABLE 1 Summary of-the CPR Adjustments for Oyster Creek Cycle 13 Channel Bow at the Most Limiting Time in Core Life for CF*t (5.5 GWD/MT)

BOW FOR CELL LIMITING AVERAGE CIR CPR FUEL

. TYPE OF CORE

" BUNDLE BOW BEFORE

% OF AFTER _

% OF TYPE CHANNEL LOCATION (MILS)

-(MILS)

ADJUS7 MENT LIMIT ADJUSTMENT LIMIT' l-1 GE338

'NEW 37-20 18 47 1.682 89.8

- 1. 62 6..

92.9 2

.GE338 NEW 33-16 18 77 1.683 89.7

.1.528 92.8 3

G3338 NEW 31-22.

18 59

1. 7:ci.

87.6

'1.667 90.6 4

GE321

-NEW 29-08 18-

.' 9 3 -

1.732

~87.1 1.677 90.0-4 5

GE321 NEW 45-24.

18 57 1.740'

.86.8.

1.685 89.6:

g 6

GF M.1 NEW.

~39-22 18-59 1.755 86.0

- 1.697 89.0' t

l 7

Gi. * ? '

tIEW 31-14 18 72 1.758.

85.9.

1.700 88.8:

.i 8'

GE33S NEW 27-06 18 43

-1.763 85.6-1.708-88.4 9

'GE339 NEW 35-22 18-48 1.775 85.0.

1.717 87.9 1

10 GE338 NEW~

31 18-66

~ 1. 7 7 8..

84.9:

1.720 87.8 11 GE338 NEW

~ 47-26 18 43

1.782 84.7 1.726 87.5 12-GE321-NEW 39-14

'.16 50 1.829 82.6.

1.7.70 85.3 i

13 GE321-NEW-41-24~

18 43:

1.839' 82.1-1.779 84.9 5

114 GP.321 NEW

'29-12a 18.

43

~1.840 82.1-

.1.780 84.8 a5' GE338 NEW.

'31-06

-18 93-1.887-

"80.0 1.826 82.7' 1

]

- a

- 1 61-GE321 NEW 27-08.

34 43

-1.892' 79.8-1.840' 82.1-e J

I l

l m..

~,.-~..__.a,,,_.._