Monthly Operating Repts for Jan 1991 for Calvert Cliffs Units 1 & 2
ML20066G681
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/31/1991
From: Denton R, Shanley L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9102200015
Download: ML20066G681 (12)


Text

.-

. ~.

  • r

.s.

t B ALTIMORE;

' OAS AND.

ELECTRIC

)

CHARLES CENTER e P.O. BOX 1475: o. BALTIMORE, MARYLAND 21203 1475 A E,DENTON' t

otunu u4uosa February.14, 1991--

)

. CALVE AT CUFFS i

U.S. Nuclear Regulatory-Commiss!.on Washington, DC 20555

?

ATTENTION: Document Control-Desk-

SUBJECT:

Calvert Cliffs Nucicar. Power I'lantt Unit Nos. 1 &i2; Dockets 50 317 and 50 318-January 1991 Operatinst Data Reoorts Centlemen:

The subject reports are being sent:-to you.as required by_; Technical Specification 6.9,1.6.

V Should you have any further questions regarding this' matter,s pleaseL contact-Bruce Meowca at (301)-260,3989.

o truly yours,

[

p

~

RED /LBS/reu i-Attachments

.r cc:

D..A. Brune, Esquire J. E. Silberg, Esquire R.' A. Capra, NRC D. C. Mcdonald, J r., NRC T. T. Martin,- NRC.

i R. I. McLean, DNR

'R.-Hartfield, NRC-3 J. Wheelock, INPO Resident Inspector,.NRC f

i y

9 i

.i

[AljL 9102200015 910131 r

PDR-ADOCK 05000317 R

PDR ri gff

...r.

1

,a

. 6.

.8 iUf S.-Nuciscr R$gulatory Ccamissionr February 14,/1991

Page 2 of 2

'bec:

.J._ A. Tiernan/A.5J. Slusark I

-C. H. Cruse P. E. Katz 3

R.'P. Heibel

f T. N. Pritchett M. J. Hiernicki 1

W. A. Thornton j

M. C. Gavrilas E. I. Bauereis R. B. Pond, Jr.

S. R. Buxb aum, - J r.

C. C.__ Lawrence, III A. R. Thornton.

L. B. Russell J. R.-Lemons R. M. Douglass R. F. Ash W. R. Corcora'n.

R. E. Denton :

R, C. DeYoung a

C. P. Johnson J. --J. Connolly l

J. H. Walter R. E. Nagel

-M. L. Stone-

[

E.-K. Bewley.

J. E. Ringsdorf, Jr.

J. F. Lohr' P. G.-Chabot/B. B. Mrowca P. A. File /K. J. Allor 4

I. A..Liberatore/C.- Behnke B'. S. Montgomery-;

i D.' song l

G,.~L. Adams'(2 copiec)

B.-Watkins A. : B.- Anuj e L

G. L."Detter-3 0

0.-J.-Falibota L. D. ~ Graber -

j D. V. Graf-il L. 0..Wenger-

-l P.-A. Pieringer

J. E. Baum:--

Technical Librarian

File-g

?

fj

-l 1

(

Li U',

.o_.,_

.., _. _. - - _ _,,..,. -- s..

-... -... i,

. a c.;

1 l

q UNIT 1 OPERATING DATA REPORT Docket No. 50-317-February 14, 1991 Prepared _by Leo =Shanley-Telephonet(301)260-6744 OPERATING STATUS t

1. UNIT NAME Calvert Cliffs Unit 1 2.

REPORTING-PERIOD JANUARY 1991 3.

LICENSED-THERMAL POWER (MWT) 2700-4.

NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET-MWe) 845 6.

MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.

MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.

CHANGE IN CAPACITY RATINGS

none-9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date. to Date-
11. HOURS IN REPORTING PERIOD 744 744 137,941
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0

-97,260.8

13. REACTOR RESERVE SHUTDOWN HOURS H0. 0 0 ~3,019.4
14. HOURS GENERATOR 10N LINE 744.0 744.0 95,033.8
15. UNIT RESERVE SilUTDOWN HOURS-0.0
0. 0 '-

0.0

16. GROSS THERMAL ENERGY GENEkATED (>nTri) _ 1,815,749

'1,815,749 238,846_,463

17. GROSS ELECTRICAL EKERGY GEN'TED(MWH) 602,374 602,374 '79;433,141
18. NET ELECTRICAL ENERGY GENERATED (MWH)-

575,716

19. UNIT-SERVICE FACTOR 100.0.

'575,716' 75,465,893

~ 10 0. 0 -

68.9

20. UNIT AVAILABILITY FACTOR 100.0 100.0-60.9
21. UNIT CAPACITY' FACTOR (USING MDC NET) 93.8 93.8) 66.3 22.-UNIT CAPACITY-FACTOR (USING DER NET) 91.6 91.6 64.7
23. UNIT FORCED OUTAGE RATE

-0. 0 0.0 9.3

24. SHUTDOWNS SCHEDULED OVER THE NEXT-SIX MONTHS (TYPE,-DATE AND DURATION):-

Maintenance / Test, February:2, 1991 for 14 days Maintenance / Test, June 1, 1991 for 50 days

25. IF SHUTDOWN AT END_OF REPORT PERIOu, ESTIMATED DATE OF START-UP:

N/A L

...j UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317

[

I UNIT NAME Calvert Cliffa-U1 a

(

DATE February 14 1991 COMPLETED BY Leo Shanley l

l REPORT MONTH Januarv 1991 TELEPHONE (3011260-6744

-[

y METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE NO.'

DATE TYPEl (HOURS)

REASON 2 DOWN EVENT ACTION TO I

1 REACTOR 3 REPORT f CODE 4 CODES PREVENT RECURRENCE

'91-01 910104

.F-0.0 A

'4 N/A SF VALVEX

1) Power was reduced to 79% while evaluating the safety.

significance of q

leak-by on 12B Safety Injection -

. Tank (SIT) outlet check valve.

I

2).The safety analysis concluded.

t

.that it was acceptable to operate at full power.

3) Valve vill be repaired.daring l

the next maintenance outage.

j:

s i-

?'

t 1

4 3. Method:

4 Exhibit G-Instructions 1 'F:

Forced '..

2i Reasoni S:

Scheduled:

.- A-Equipment: Failure. (Explain) 1-Manual for Preparation of Data B-Maintenance or Test-I

' Manual Scrami Entry Sheets for License

~3-Automatic Scram.

Event Report (LER)LFile;

C-Refueling-l' D-Regulatory Restriction ~
4-Other (Explain)..

(NUREG-0161).

'E-Operator Training & License'. Examination

.F-Administrative 5-Exhibit 1.- Same Source

'G-Operational' Error >(Explain) a.

.~

w,-

a

AVERAGE DAILY: UNIT POWER LEVEL-ono***********************************************e****************a****

~

Docket No. 50-317.

Calvert Cliffs Unit No. 1-

. February 14, 1991 Completed by Leo-Shanley-Telephone

-(301)L260-6744 JANUARY 1991 4

a Average Daily Power Level

-Average Daily-Power _' Level Day (MWe-Net)

-Dayt (MWe-Net)-

1 863

'17 674:

2 834 18.

678 I

3 862 19-

.824:_

4 814 20-

=861-5 673 21

'863 6

676 22:

862 7

677 23-862 8

676 24

'862' 9

675 25 862-r 10 675' 26 862-11 673 27~

'8631 12 673

.- 2 8 863:

13

'a7 3

.29-862 14 672 30 863

-15 673 31:

864--

t 16 675-

{-

1 1

s 4'

1

a 1

l DOCKET # 50 317-CALVERT CLIFFS

- UNIT 1 -

February 14, 1991-

SUMMARY

OF OPERATING' EXPERIENCE-r January 1991-Theunitbeganthemonthat100%powerj(860MWe).

-7 Power was reduced to 80% (680 !!We) from'1300 to 1733 ont2jJanuary. -The power /

reduction. accommodated the removal-of a^condensateidemineralizer from service' while maintaining full condensate flow through the remaining demineralizers.

Power was reduced to 79% - (665 MVe) 'on '4. January.af ter it was discovered that:

there was significant leak-by on :12B -Safety injection-Tank (SIT) outlet check -

valve. An analysis'was performed and. it was. concluded that the Unit could safely operate at full power. The Unit'wasireturned to 100%;(855 MWe) at'1030 on 19 January.

The unit ended the. month at 100% powerL(860 MWe).

~

i k

I l'

l-q r.

+

1

'j February 7, 1991 REFUELING INFORNATION REQUEST 1.

Name of facility:

Calvert Cliffs Nuclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown:

March 6, 1992.

3.

Scheduled clate for restart following refueling:' Nay 17, 1992 -

4.

Will-refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?,

Resumption of operation after refueling will require changes to Technical specifications' The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the-Tech Specs for Unit 1 Cycle 11.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

November 1, 1991 * ( reload submittal )

6.

Important licensing considerations associated with the refueling.

None identified at-this time.

7.

The number of fuel assemblies (a) inithe core and (b) in the spent fuel storage pool.

(a) 217.

(b) 1326.

Spent fuel pools-are common to Units 1 and 2.

8.

(a) The' present licensed spent fuel pool' storage ca2acity, and-(b) the size of any increase in licensed storage _ capacity taat has been requested or is _ planned, in number of fuel assemblies.

(a) 1830.

(b) 2880.

9.

_The projected date of the last refueling that'can be discharged to the Spent Fuel Pool assuming the present' licensed-capacity and maintaining space for one full core off-load.-

Harch 1992. *

  • ENTRY HAS. CHANGED SINCE LAST REPORTED I

t i

e***+***********************************************************************

UNIT 2 OPERATING-DATA REPORT i

4 Docket No. 50-318 February-14,~1991

' i Prepared by Leo Shanley Telephoner (301)260-6744 9$bDI!U9.!IDI95

- i

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD JANUARY 1991 3.

LICENSED THERMAL POWER (MWT) 2700 4.

NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845

6. MAXIMUM DEPENDABLE CAP'Y (GROSS-MWo).

860 7.

MAXIMUM DEPENDABLE CAP'Y (NET-MWe) 825

8. CHANGE IN CAPACITY-RATINGS none 9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date l
11. HOURS IN REPORTING PERIOD 744 744 121,296
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 87,437.3 l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 3.0 1,296.6 i
14. HOURS GENERATOR:ON LINE 0,0 0.0 86,228.9
15. UNIT RESERVE SHUTDOWN HOURS-0.0 0.0' O.0
16. GROSS THERMAL ENERGY GENERATED (MWH)

O.

0 238,389,418

17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 0 -72,284,632
18. NET ELECTRICAL ENERGY GENERATED (MWH)

O.

0 69,042,571

19. UNIT SERVICE FACTOR 0.0 0.0 71.1

- i

20. UNIT AVAILABILITY FACTOR 0.0 0.0

.71.1-l l

21. UNIT CAPACITY-FACTOR (USING MDC NET) 0.0 0.0 69.0
22. UNIT' CAPACITY FACTOR (USING DER NET) 0.0 0.0 67.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3
24. SHUTDOWNS SCHEDULED OVER THE NEXT

~ SIX MONTHS-(TYPE, DATE AND DURATION):'

N/A

. 25. IF UN'T IS SHUTDOWN AT END OF REPORT PERIOD, 4

ESTIMATED DATE.0F START-UP:

March-15, 1991

. l i

l t

4 c

v

~

wewr~w

<"-6 se sq d

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-318 UNIT NAME Co1 vert Cliffs-U2 DATE February 14 1991 COMPIITED BY Leo Shanlev REPORT MONTH January 1991 TELEPHONE (3011260-6746 MET 110D OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1

2 NO.

DATE TYPE (HOURS)

REASON DOWN EVENT ACTION TO 3

O

~

3 REACTOR REPORT g CODE CODE PREVENT RECURRENCE 91-01 910101 S

744

'.C N/A N/A Continued shutdown for 8th Cycle Refueling Outage.

I I

F:

Forced 2 Reason:

3' Method:

4 1

Exhibit G-Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

B-Maintenance or Test 2-Manual Scram.

Entry Sheets for License C-Refueling' 4-Other (Explain)

(NUREC-Ol61) 3-Automatic' Scram.

Event Report (LER) File-D-Regulatory Restriction E-Operator Training & License Examination-F-Administrative 5 Exhibit'I - Same Source

.G-Operational Error (Explain)

H-Other (Explain)

AVERAGE DAILY UNIT. POWER' LEVEL oco*********************************************************************-

i Docket No. 50-318:

Calvert Cliffs-Unit No. 2 February 14, 1991-Completed by Leo Shanley Telephone (301) 260-67.44 :

-t JANUARY -1991 Day (MWe-Net):

~ Average Daily > Power Level Average Daily Power Level Day-(MWe-Net) 1 0

17 10-2 0

'18:

0-3 0

'19 -

0 i

4 0

20 0

5 0

21

~0 6

0 22 0

7 0

23=

-O.

0 0

24 0-9 0

25 10 0

26 0

11 0

27 0

12' O

28 0

13 0

29, 0 --

a 14' O-30

~ O '-

15 0

31:

OI 16 0

i i

DOCKET # 50-318 j

CALVERT CLIFFS - UNIT 2 February 14, 1991

SUMMARY

OF OPERATING EXPERIENCE f

i j

January 1991 The unit began the month in a cont!.nued shutdown for the 8th Cycle Refueling

{

Outage.

Reactor vessel reassembly and the integrated Leak Rate Test were completed.

Maintenance and Surveillance Test Procedures-continued in preparation for i

drawing a bubble in the pressurizer, establishing secondary vacuum, plant heatup and reactor startup.

The unit is scheduled to return to service on March 15, 1991, i

. ~ _ ~. _ _

y...

a February 7, 1991 REFUELING INFORMATION REQUEST 1

1.

Name of facility: Calvert Cliffs Nuclear Power Planti Unit No.

2.,

j 2.

Scheduled date for next refueling shutdown:.

March 20, 1989.**

1 3.

Schedui i date for restart following--refueling:. March 15, 1991.*

4.

Will refueling or resumption of operation thereafter require.a Technical Specification change or other license amendment?

Unit reload license-and necessary technical specification changes-are-approved. The Unit is in an extended refueling shutdown to. support-system maintenance.

5.

Scheduled date(s) for submitting: proposed 1icensing action:and; supporting information.

Unit reload license has been approved. The Unit is in an-extended refueling shutdown to support-system maintenance.--

6.

Important licensing _ considerations: associated with the refueling.

Reload fuel will be similar to' reload fuellinserted into the previous-cycle except for the 4.3% enrichment, debrisLresistant fuel design,: and four fuel assemblies containingian alternative burnable-absorber.

Changes will be made to the on line incore monitoring program.

7.

The number of fuel assemblies-(a) _in the core and '(b) in the spent fuel.

storage-pool..

i (a): 217.-

(b)z1326.

Spent fuel pools:are common to Units 1 and 2.

8.

(a) The present licensed spent fuel poolistorage capacity, and-(b)'_the-size of any. increase-_in-licensed-storage capacity that has been requested or is planned, in number of fuelaassembliest (a). 1830.

.(b) _.2880. --

9 The projected date of the last refueling-that can be discharged to the' Spent Fuel Pool assuming the present licensed capacity and-maintaining; space for one full core off-load.

.)

4 l

. March 1992.

  • i

[

UNIT CURRENTLY IN REFUELING' SHUT DOWN y

  • ENTRY HAS CHANGED SINCE LAST REPORTED 0

l '.

'