Monthly Operating Repts for Jan 1991 for Calvert Cliffs Units 1 & 2
ML20066G681
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/31/1991
From: Denton R, Shanley L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9102200015
Download: ML20066G681 (12)


Text

.- .- . . ... . . ~ . .. , _ . . .

.s.

  • r t

B ALTIMORE;

. ' OAS AND . ,

.*- ELECTRIC  ;

)

CHARLES CENTER e P.O. BOX 1475: o. BALTIMORE, MARYLAND 21203 1475

  • A E,DENTON' -

t otunu u4uosa February.14, 1991-- )'

. CALVE AT CUFFS i

U.S. Nuclear Regulatory-Commiss!.on Washington, DC 20555

?

ATTENTION: Document Control-Desk-

SUBJECT:

Calvert Cliffs Nucicar. Power I'lantt ,

Unit Nos. 1 &i2; Dockets 50 317 and 50 318-January 1991 Operatinst Data Reoorts ,

Centlemen:

The subject reports are being sent:-to you.as required by_; Technical Specification 6.9,1.6. V <

Should you have any further questions regarding this' matter,s pleaseL contact-Bruce Meowca at (301)-260,3989.

o truly yours,

[ p ~

RED /LBS/reu _

i-Attachments .r cc: D..A. Brune, Esquire J. E. Silberg, Esquire R.' A. Capra, NRC D. C. Mcdonald, J r. , NRC T. T. Martin,- NRC. i R. I. McLean, DNR <

'R.-Hartfield, NRC-3 J. Wheelock, INPO . .

Resident Inspector,.NRC f

i y

9 i

.i 9102200015 910131 r

[AljL  !

PDR- ADOCK 05000317 R PDR ri gff

. -_ _ , . _ _ _ . . . _ _ , - _ . . . . . _ _ . . . . . _ _ ...r. . , , , . . - - . .._

1

,a .6. .8 iUf S.-Nuciscr R$gulatory Ccamissionr .;

February 14,/1991

Page 2 of 2

'bec: .J._ A. Tiernan/A.5J. Slusark , I

-C. H. Cruse P. E. Katz 3 R.'P. Heibel T. N. Pritchett :f M. J. Hiernicki -

1 W. A. Thornton j M. C. Gavrilas E. I. Bauereis .

R. B. Pond, Jr.

S . R . Buxb aum , - J r .

C. C.__ Lawrence, III A. R. Thornton.

L. B. Russell J. R.-Lemons '

R. M. Douglass R. F. Ash W. R. Corcora'n.

R. E. Denton :

R, C. DeYoung a C. P. Johnson J . --J . Connolly '

l J. H. Walter R. E. Nagel ,

-M. L. Stone- [

E.-K. Bewley.

J. E. Ringsdorf, Jr.

J. F. Lohr' P. G.-Chabot/B. B. Mrowca P. A. File /K. J . Allor <

4 I. A..Liberatore/C.- Behnke B'. S. Montgomery-; i D.' song l G,.~L. Adams'(2 copiec)

B.-Watkins A. : B .- Anuj e L G. L."Detter- 3 0 0.-J.-Falibota L. D. ~ Graber - , j D. V. Graf- il L. 0..Wenger- -l P.-A. Pieringer

J. E. Baum:--

, Technical Librarian

File- ,

g -

?

fj -l 1

(

. Li U' ,  !

.o_.,_ _. . _ , _ _, . , . . ,_ . . , _ . _ . - - _ _ , , . . , . -- s .. . - . . . - .. . i, .

. a c.;

1 l

. q UNIT 1 OPERATING DATA REPORT Docket No. 50-317-February 14, 1991 '

Prepared _by Leo =Shanley-Telephonet(301)260-6744 OPERATING STATUS .

t

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING-PERIOD JANUARY 1991
3. LICENSED-THERMAL POWER (MWT) 2700-
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET-MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
8. CHANGE IN CAPACITY RATINGS :none-
9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date. to Date-
11. HOURS IN REPORTING PERIOD 744 744 137,941
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 -97,260.8
13. REACTOR RESERVE SHUTDOWN HOURS H0. 0 0 . ~3,019.4
14. HOURS GENERATOR 10N LINE 744.0 744.0 95,033.8
15. UNIT RESERVE SilUTDOWN HOURS- 0.0 0. 0 '- 0.0
16. GROSS THERMAL ENERGY GENEkATED (>nTri) _ 1,815,749 '1,815,749 238,846_,463
17. GROSS ELECTRICAL EKERGY GEN'TED(MWH) 602,374 602,374 '79;433,141
18. NET ELECTRICAL ENERGY GENERATED (MWH)- 575,716 '575,716' 75,465,893
19. UNIT-SERVICE FACTOR 100.0. ~ 10 0 . 0 - 68.9
20. UNIT AVAILABILITY FACTOR 100.0 100.0- 60.9
21. UNIT CAPACITY' FACTOR (USING MDC NET) 93.8 93.8) 66.3 22.-UNIT CAPACITY-FACTOR (USING DER NET) 91.6 91.6 64.7
23. UNIT FORCED OUTAGE RATE -0 . 0 0.0 9.3
24. SHUTDOWNS SCHEDULED OVER THE NEXT-SIX MONTHS (TYPE,-DATE AND DURATION):-

Maintenance / Test, February:2, 1991 for 14 days Maintenance / Test, June 1, 1991 for 50 days

25. IF SHUTDOWN AT END_OF REPORT PERIOu, ESTIMATED DATE OF START-UP:

N/A L

...j -

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317

( UNIT NAME Calvert Cliffa-U1 a DATE February 14 1991 COMPLETED BY Leo Shanley l l, REPORT MONTH Januarv 1991 TELEPHONE (3011260-6744

-[

y METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE NO .' DATE TYPEl (HOURS) REASON 2 DOWN EVENT ACTION TO 1

REACTOR 3 REPORT f CODE 4 CODES PREVENT RECURRENCE

'91-01 910104 .F- 0.0 A '4 N/A SF VALVEX 1) Power was reduced to 79% while evaluating the safety. '

. significance of q

leak-by on 12B Safety Injection -

. Tank (SIT) outlet check valve.

I

2) .The safety analysis concluded. .

t

.that it was acceptable to operate at full power.

3) Valve vill be repaired.daring l the next maintenance outage.

j:  !

s i-

?

t 1

4 .

1 'F: Forced '.. 2i Reasoni 3 . Method: 4 Exhibit G-Instructions S: Scheduled: .- A-Equipment: Failure . (Explain) 1-Manual for Preparation of Data B-Maintenance or Test- Manual Scrami Entry Sheets for License I

.
C-Refueling- .

~3-Automatic Scram. Event Report (LER)LFile; l' D-Regulatory Restriction ~ .

4-Other (Explain).. (NUREG-0161).

. 'E-Operator Training & License'. Examination

. .F-Administrative 5- -

Exhibit 1.- Same Source

'G-Operational' Error >(Explain) ,

__ __ a. . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -. . - - - - . .:- .~ - w ,- -

. -., ., a . -

AVERAGE DAILY: UNIT POWER LEVEL-ono***********************************************e****************a****

~

Docket No. 50-317.

Calvert Cliffs Unit No. 1-

. February 14, 1991 Completed by Leo-Shanley-Telephone -(301)L260-6744 4 JANUARY 1991 a ,

Average Daily Power Level -Average Daily-Power _' Level

. Day (MWe-Net) -Dayt (MWe-Net)- -

1 863 '17 674: ,

2 834 18. 678 I

, 3 862 19- .824:_

4 814 20- =861-5 673 21 '863  ;

6 676 22: :862 7 677 23- 862 8 676 24 '862' 9 675 25 862-r ,

10 675' 26 862-11 673 27~ '8631 12 673 .- 2 8 863:

13 'a7 3 .29- 862 14 672 30 863

-15 673 31
864--

t 16 675- -

{-

1 1

< s 4' 1

a 1

l DOCKET # 50 317- ,'

CALVERT CLIFFS - UNIT 1 -

February 14, 1991-

SUMMARY

OF OPERATING' EXPERIENCE-r January 1991-  ;

Theunitbeganthemonthat100%powerj(860MWe). -7 Power was reduced to 80% (680 !!We) from'1300 to 1733 ont2jJanuary. -The power /

reduction. accommodated the removal-of a^condensateidemineralizer from service' while maintaining full condensate flow through the remaining demineralizers.

Power was reduced to 79% - (665 MVe) 'on '4. January.af ter it was discovered that:

there was significant leak-by on :12B -Safety injection- Tank (SIT) outlet check -

valve. An analysis'was performed and. it was. concluded that the Unit could safely operate at full power. The Unit'wasireturned to 100%;(855 MWe) at'1030 on 19 January.

~

The unit ended the. month at 100% powerL(860 MWe). _

i k

I l' I l- -

q r .

+

1

. 'j February 7, 1991 REFUELING INFORNATION REQUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: March 6, 1992.
3. Scheduled clate for restart following refueling:' Nay 17, 1992 -
4. Will- refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?,

Resumption of operation after refueling will require changes to  :

Technical specifications' The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the-Tech Specs for Unit 1 Cycle 11.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

November 1, 1991 * ( reload submittal )

6. Important licensing considerations associated with the refueling. .

None identified at-this time.

7. The number of fuel assemblies (a) inithe core and (b) in the spent fuel storage pool.

(a) 217. (b) 1326.

Spent fuel pools-are common to Units 1 and 2.

8. (a) The' present licensed spent fuel pool' storage ca2acity, and-(b) the size of any increase in licensed storage _ capacity taat has been requested or is _ planned, in number of fuel assemblies.

(a) 1830. (b) 2880.

9. _The projected date of the last refueling that'can be discharged to the Spent Fuel Pool assuming the present' licensed-capacity and maintaining space for one full core off-load.-

Harch 1992. *

  • ENTRY HAS. CHANGED SINCE LAST REPORTED I

t i

e***+***********************************************************************

UNIT 2 -

OPERATING-DATA REPORT . i

                                                                                                                                                        • 4 Docket No. 50-318 February- 14,~1991 'i Prepared by Leo Shanley .

Telephoner (301)260-6744 9$bDI!U9.!IDI95 -i

1. UNIT NAME Calvert Cliffs Unit 2  ;
2. REPORTING PERIOD JANUARY 1991
3. LICENSED THERMAL POWER (MWT) 2700 ,
4. NAMEPLATE RATING (GROSS MWe) 918 ,
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS-MWo). 860
7. MAXIMUM DEPENDABLE CAP'Y (NET-MWe) 825
8. CHANGE IN CAPACITY-RATINGS none -'
9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a .!

Cumulative This month Year-to-Date to Date l

11. HOURS IN REPORTING PERIOD 744 744 121,296
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 87,437.3 l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 3.0 1,296.6 i
14. HOURS GENERATOR:ON LINE 0,0 0.0 86,228.9
15. UNIT RESERVE SHUTDOWN HOURS- 0.0 0.0' O.0
16. GROSS THERMAL ENERGY GENERATED (MWH) O. 0 238,389,418
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 0 -72,284,632
18. NET ELECTRICAL ENERGY GENERATED (MWH) O. 0 69,042,571
19. UNIT SERVICE FACTOR 0.0 0.0 71.1 -i l
20. UNIT AVAILABILITY FACTOR 0.0 0.0 .71.1- l
21. UNIT CAPACITY-FACTOR (USING MDC NET) 0.0 0.0 69.0 -!
22. UNIT' CAPACITY FACTOR (USING DER NET) 0.0 0.0 67.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3 *
24. SHUTDOWNS SCHEDULED OVER THE NEXT

~ SIX MONTHS-(TYPE, DATE AND DURATION):'

N/A -

. 25. IF UN'T IS SHUTDOWN AT END OF REPORT PERIOD, 4 ESTIMATED DATE.0F START-UP:

March-15, 1991 .l i

l t 4 " , c v ~

wewr~w <"-6 se sq d

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-318 UNIT NAME Co1 vert Cliffs-U2 ,

DATE February 14 1991 COMPIITED BY Leo Shanlev REPORT MONTH January 1991 TELEPHONE (3011260-6746 MET 110D OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1 2 ACTION TO NO. DATE TYPE (HOURS) REASON DOWN EVENT REACTOR3 O

CODE 3

~

REPORT g CODE PREVENT RECURRENCE 91-01 910101 S 744 ' .C N/A N/A Continued shutdown for 8th Cycle Refueling Outage.

I I

1 F: Forced 2 Reason: 3' Method: 4 Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

B-Maintenance or Test 2-Manual Scram. Entry Sheets for License C-Refueling' .

3-Automatic' Scram. Event Report (LER) File-D-Regulatory Restriction .

4-Other (Explain) (NUREC-Ol61)

E-Operator Training & License Examination-F-Administrative 5 Exhibit'I - Same Source

.G-Operational Error (Explain)

H-Other (Explain)

AVERAGE DAILY UNIT. POWER' LEVEL -

oco*********************************************************************- i Docket No. 50-318: ,

Calvert Cliffs-Unit No. 2 February 14, 1991-Completed by Leo Shanley Telephone (301) 260-67.44 :

-t JANUARY -1991 Average Daily Power Level .

~ Average Daily > Power Level Day (MWe-Net): Day- (MWe-Net) 1 0 17 10-2 0 '18: 0-  ;

3 0 '19 - 0

, i 4 0 20 0 5 0 21 ~0 6 0 22 0 7 0 23= -O.

0 0 24 0-9 0 25 10 0 26 0 11 0 27 0 12' O 28 0 13 0 29, 0 -- a 14' O- 30 ~ O '-

15 0 31: OI 16 0 i

i

DOCKET # 50-318 j CALVERT CLIFFS - UNIT 2 February 14, 1991

SUMMARY

OF OPERATING EXPERIENCE f

i January 1991 j

The unit began the month in a cont!.nued shutdown for the 8th Cycle Refueling {

Outage.

Reactor vessel reassembly and the integrated Leak Rate Test were completed.

Maintenance and Surveillance Test Procedures-continued in preparation for i drawing a bubble in the pressurizer, establishing secondary vacuum, plant heatup and reactor startup.

The unit is scheduled to return to service on March 15, 1991, i

- _ . . _ . _ _.. _ - . . _ _ _ _ _ _ . ~ _ ~ . _ _ .

y. ..

a February 7, 1991 REFUELING INFORMATION REQUEST 1

1. Name of facility: Calvert Cliffs Nuclear Power Planti Unit No. 2., j l
2. Scheduled date for next refueling shutdown:. March 20, 1989.** 1
3. Schedui i date for restart following--refueling:. March 15, 1991.*
4. Will refueling or resumption of operation thereafter require.a Technical Specification change or other license amendment?

Unit reload license-and necessary technical specification changes-are- .

approved. The Unit is in an extended refueling shutdown to. support-system maintenance.

5. Scheduled date(s) for submitting: proposed 1icensing action:and; supporting information.

Unit reload license has been approved. The Unit is in an-extended refueling shutdown to support-system maintenance.--  ;

6. Important licensing _ considerations: associated with the refueling.

Reload fuel will be similar to' reload fuellinserted into the previous-cycle except for the 4.3% enrichment, debrisLresistant fuel design,: and ,

four fuel assemblies containingian alternative burnable- absorber.

Changes will be made to the on line incore monitoring program.

7. The number of fuel assemblies-(a) _in the core and '(b) in the spent fuel .

storage-pool..

i (a): 217.- (b)z1326.

Spent fuel pools:are common to Units 1 and 2.

8. (a) The present licensed spent fuel poolistorage capacity, and-(b)'_the-size of any. increase-_in-licensed-storage capacity that has been requested or is planned, in number of fuelaassembliest (a). 1830. .(b) _.2880. --

9 The projected date of the last refueling-that can be discharged to the' Spent Fuel Pool assuming the present licensed capacity and-maintaining;

space for one full core off-load. .) 4 l . March 1992. * --

i

    • UNIT CURRENTLY IN REFUELING' SHUT DOWN y ,
  • ENTRY HAS CHANGED SINCE LAST REPORTED 0 l '.  ;

'