CHARLES CENTER e P.O. BOX 1475: o. BALTIMORE, MARYLAND 21203 1475 A E,DENTON' t
otunu u4uosa February.14, 1991--
)
. CALVE AT CUFFS i
U.S. Nuclear Regulatory-Commiss!.on Washington, DC 20555
- ?
ATTENTION: Document Control-Desk-
SUBJECT:
Calvert Cliffs Nucicar. Power I'lantt Unit Nos. 1 &i2; Dockets 50 317 and 50 318-January 1991 Operatinst Data Reoorts Centlemen:
The subject reports are being sent:-to you.as required by_; Technical Specification 6.9,1.6.
V Should you have any further questions regarding this' matter,s pleaseL contact-Bruce Meowca at (301)-260,3989.
o truly yours,
[
p
~
RED /LBS/reu i-Attachments
.r cc:
D..A. Brune, Esquire J. E. Silberg, Esquire R.' A. Capra, NRC D. C. Mcdonald, J r., NRC T. T. Martin,- NRC.
i R. I. McLean, DNR
'R.-Hartfield, NRC-3 J. Wheelock, INPO Resident Inspector,.NRC f
i y
9 i
.i
[AljL 9102200015 910131 r
PDR-ADOCK 05000317 R
PDR ri gff
...r.
1
- ,a
. 6.
.8 iUf S.-Nuciscr R$gulatory Ccamissionr February 14,/1991
- Page 2 of 2
'bec:
.J._ A. Tiernan/A.5J. Slusark I
-C. H. Cruse P. E. Katz 3
R.'P. Heibel
- f T. N. Pritchett M. J. Hiernicki 1
W. A. Thornton j
M. C. Gavrilas E. I. Bauereis R. B. Pond, Jr.
S. R. Buxb aum, - J r.
C. C.__ Lawrence, III A. R. Thornton.
L. B. Russell J. R.-Lemons R. M. Douglass R. F. Ash W. R. Corcora'n.
R. E. Denton :
R, C. DeYoung a
C. P. Johnson J. --J. Connolly l
J. H. Walter R. E. Nagel
-M. L. Stone-
[
E.-K. Bewley.
J. E. Ringsdorf, Jr.
J. F. Lohr' P. G.-Chabot/B. B. Mrowca P. A. File /K. J. Allor 4
I. A..Liberatore/C.- Behnke B'. S. Montgomery-;
i D.' song l
G,.~L. Adams'(2 copiec)
B.-Watkins A. : B.- Anuj e L
G. L."Detter-3 0
0.-J.-Falibota L. D. ~ Graber -
j D. V. Graf-il L. 0..Wenger-
-l P.-A. Pieringer
- J. E. Baum:--
Technical Librarian
- File-g
?
fj
-l 1
(
Li U',
.o_.,_
.., _. _. - - _ _,,..,. -- s..
-... -... i,
. a c.;
1 l
q UNIT 1 OPERATING DATA REPORT Docket No. 50-317-February 14, 1991 Prepared _by Leo =Shanley-Telephonet(301)260-6744 OPERATING STATUS t
- 1. UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING-PERIOD JANUARY 1991 3.
LICENSED-THERMAL POWER (MWT) 2700-4.
NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET-MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS
- none-9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date. to Date-
- 11. HOURS IN REPORTING PERIOD 744 744 137,941
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0
-97,260.8
- 13. REACTOR RESERVE SHUTDOWN HOURS H0. 0 0 ~3,019.4
- 14. HOURS GENERATOR 10N LINE 744.0 744.0 95,033.8
- 15. UNIT RESERVE SilUTDOWN HOURS-0.0
- 0. 0 '-
0.0
- 16. GROSS THERMAL ENERGY GENEkATED (>nTri) _ 1,815,749
'1,815,749 238,846_,463
- 17. GROSS ELECTRICAL EKERGY GEN'TED(MWH) 602,374 602,374 '79;433,141
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)-
575,716
- 19. UNIT-SERVICE FACTOR 100.0.
'575,716' 75,465,893
~ 10 0. 0 -
68.9
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0-60.9
- 21. UNIT CAPACITY' FACTOR (USING MDC NET) 93.8 93.8) 66.3 22.-UNIT CAPACITY-FACTOR (USING DER NET) 91.6 91.6 64.7
- 23. UNIT FORCED OUTAGE RATE
-0. 0 0.0 9.3
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT-SIX MONTHS (TYPE,-DATE AND DURATION):-
Maintenance / Test, February:2, 1991 for 14 days Maintenance / Test, June 1, 1991 for 50 days
- 25. IF SHUTDOWN AT END_OF REPORT PERIOu, ESTIMATED DATE OF START-UP:
N/A L
...j UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317
[
I UNIT NAME Calvert Cliffa-U1 a
(
DATE February 14 1991 COMPLETED BY Leo Shanley l
l REPORT MONTH Januarv 1991 TELEPHONE (3011260-6744
-[
y METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE NO.'
DATE TYPEl (HOURS)
REASON 2 DOWN EVENT ACTION TO I
1 REACTOR 3 REPORT f CODE 4 CODES PREVENT RECURRENCE
'91-01 910104
.F-0.0 A
'4 N/A SF VALVEX
- 1) Power was reduced to 79% while evaluating the safety.
significance of q
leak-by on 12B Safety Injection -
. Tank (SIT) outlet check valve.
I
- 2).The safety analysis concluded.
t
.that it was acceptable to operate at full power.
- 3) Valve vill be repaired.daring l
the next maintenance outage.
j:
s i-
?'
t 1
4 3. Method:
4 Exhibit G-Instructions 1 'F:
Forced '..
2i Reasoni S:
Scheduled:
.- A-Equipment: Failure. (Explain) 1-Manual for Preparation of Data B-Maintenance or Test-I
' Manual Scrami Entry Sheets for License
~3-Automatic Scram.
Event Report (LER)LFile;
- C-Refueling-l' D-Regulatory Restriction ~
- 4-Other (Explain)..
(NUREG-0161).
'E-Operator Training & License'. Examination
.F-Administrative 5-Exhibit 1.- Same Source
'G-Operational' Error >(Explain) a.
.~
w,-
a
AVERAGE DAILY: UNIT POWER LEVEL-ono***********************************************e****************a****
~
Docket No. 50-317.
Calvert Cliffs Unit No. 1-
. February 14, 1991 Completed by Leo-Shanley-Telephone
-(301)L260-6744 JANUARY 1991 4
a Average Daily Power Level
-Average Daily-Power _' Level Day (MWe-Net)
-Dayt (MWe-Net)-
1 863
'17 674:
2 834 18.
678 I
3 862 19-
.824:_
4 814 20-
=861-5 673 21
'863 6
676 22:
- 862 7
677 23-862 8
676 24
'862' 9
675 25 862-r 10 675' 26 862-11 673 27~
'8631 12 673
.- 2 8 863:
13
'a7 3
.29-862 14 672 30 863
-15 673 31:
864--
t 16 675-
{-
1 1
s 4'
1
a 1
l DOCKET # 50 317-CALVERT CLIFFS
- UNIT 1 -
February 14, 1991-
SUMMARY
OF OPERATING' EXPERIENCE-r January 1991-Theunitbeganthemonthat100%powerj(860MWe).
-7 Power was reduced to 80% (680 !!We) from'1300 to 1733 ont2jJanuary. -The power /
reduction. accommodated the removal-of a^condensateidemineralizer from service' while maintaining full condensate flow through the remaining demineralizers.
Power was reduced to 79% - (665 MVe) 'on '4. January.af ter it was discovered that:
there was significant leak-by on :12B -Safety injection-Tank (SIT) outlet check -
valve. An analysis'was performed and. it was. concluded that the Unit could safely operate at full power. The Unit'wasireturned to 100%;(855 MWe) at'1030 on 19 January.
The unit ended the. month at 100% powerL(860 MWe).
~
i k
I l'
l-q r.
+
1
'j February 7, 1991 REFUELING INFORNATION REQUEST 1.
Name of facility:
Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown:
March 6, 1992.
3.
Scheduled clate for restart following refueling:' Nay 17, 1992 -
4.
Will-refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?,
Resumption of operation after refueling will require changes to Technical specifications' The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the-Tech Specs for Unit 1 Cycle 11.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
November 1, 1991 * ( reload submittal )
6.
Important licensing considerations associated with the refueling.
None identified at-this time.
7.
The number of fuel assemblies (a) inithe core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1326.
Spent fuel pools-are common to Units 1 and 2.
8.
(a) The' present licensed spent fuel pool' storage ca2acity, and-(b) the size of any increase in licensed storage _ capacity taat has been requested or is _ planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
_The projected date of the last refueling that'can be discharged to the Spent Fuel Pool assuming the present' licensed-capacity and maintaining space for one full core off-load.-
Harch 1992. *
- ENTRY HAS. CHANGED SINCE LAST REPORTED I
t i
e***+***********************************************************************
UNIT 2 OPERATING-DATA REPORT i
4 Docket No. 50-318 February-14,~1991
' i Prepared by Leo Shanley Telephoner (301)260-6744 9$bDI!U9.!IDI95
- i
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD JANUARY 1991 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS-MWo).
860 7.
MAXIMUM DEPENDABLE CAP'Y (NET-MWe) 825
- 8. CHANGE IN CAPACITY-RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date l
- 11. HOURS IN REPORTING PERIOD 744 744 121,296
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 87,437.3 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 3.0 1,296.6 i
- 14. HOURS GENERATOR:ON LINE 0,0 0.0 86,228.9
- 15. UNIT RESERVE SHUTDOWN HOURS-0.0 0.0' O.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
O.
0 238,389,418
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 0 -72,284,632
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
O.
0 69,042,571
- 19. UNIT SERVICE FACTOR 0.0 0.0 71.1
- i
- 20. UNIT AVAILABILITY FACTOR 0.0 0.0
.71.1-l l
- 21. UNIT CAPACITY-FACTOR (USING MDC NET) 0.0 0.0 69.0
- 22. UNIT' CAPACITY FACTOR (USING DER NET) 0.0 0.0 67.4
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT
~ SIX MONTHS-(TYPE, DATE AND DURATION):'
N/A
. 25. IF UN'T IS SHUTDOWN AT END OF REPORT PERIOD, 4
ESTIMATED DATE.0F START-UP:
March-15, 1991
. l i
l t
4 c
v
~
wewr~w
<"-6 se sq d
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-318 UNIT NAME Co1 vert Cliffs-U2 DATE February 14 1991 COMPIITED BY Leo Shanlev REPORT MONTH January 1991 TELEPHONE (3011260-6746 MET 110D OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1
2 NO.
DATE TYPE (HOURS)
REASON DOWN EVENT ACTION TO 3
O
~
3 REACTOR REPORT g CODE CODE PREVENT RECURRENCE 91-01 910101 S
744
'.C N/A N/A Continued shutdown for 8th Cycle Refueling Outage.
I I
F:
Forced 2 Reason:
3' Method:
4 1
Exhibit G-Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for License C-Refueling' 4-Other (Explain)
(NUREC-Ol61) 3-Automatic' Scram.
Event Report (LER) File-D-Regulatory Restriction E-Operator Training & License Examination-F-Administrative 5 Exhibit'I - Same Source
.G-Operational Error (Explain)
H-Other (Explain)
AVERAGE DAILY UNIT. POWER' LEVEL oco*********************************************************************-
i Docket No. 50-318:
Calvert Cliffs-Unit No. 2 February 14, 1991-Completed by Leo Shanley Telephone (301) 260-67.44 :
-t JANUARY -1991 Day (MWe-Net):
~ Average Daily > Power Level Average Daily Power Level Day-(MWe-Net) 1 0
17 10-2 0
'18:
0-3 0
'19 -
0 i
4 0
20 0
5 0
21
~0 6
0 22 0
7 0
23=
-O.
0 0
24 0-9 0
25 10 0
26 0
11 0
27 0
12' O
28 0
13 0
29, 0 --
a 14' O-30
~ O '-
15 0
31:
OI 16 0
i i
DOCKET # 50-318 j
CALVERT CLIFFS - UNIT 2 February 14, 1991
SUMMARY
OF OPERATING EXPERIENCE f
i j
January 1991 The unit began the month in a cont!.nued shutdown for the 8th Cycle Refueling
{
Outage.
Reactor vessel reassembly and the integrated Leak Rate Test were completed.
Maintenance and Surveillance Test Procedures-continued in preparation for i
drawing a bubble in the pressurizer, establishing secondary vacuum, plant heatup and reactor startup.
The unit is scheduled to return to service on March 15, 1991, i
. ~ _ ~. _ _
- y...
a February 7, 1991 REFUELING INFORMATION REQUEST 1
1.
Name of facility: Calvert Cliffs Nuclear Power Planti Unit No.
2.,
j 2.
Scheduled date for next refueling shutdown:.
March 20, 1989.**
1 3.
Schedui i date for restart following--refueling:. March 15, 1991.*
4.
Will refueling or resumption of operation thereafter require.a Technical Specification change or other license amendment?
Unit reload license-and necessary technical specification changes-are-approved. The Unit is in an extended refueling shutdown to. support-system maintenance.
5.
Scheduled date(s) for submitting: proposed 1icensing action:and; supporting information.
Unit reload license has been approved. The Unit is in an-extended refueling shutdown to support-system maintenance.--
6.
Important licensing _ considerations: associated with the refueling.
Reload fuel will be similar to' reload fuellinserted into the previous-cycle except for the 4.3% enrichment, debrisLresistant fuel design,: and four fuel assemblies containingian alternative burnable-absorber.
Changes will be made to the on line incore monitoring program.
7.
The number of fuel assemblies-(a) _in the core and '(b) in the spent fuel.
storage-pool..
- i (a): 217.-
(b)z1326.
Spent fuel pools:are common to Units 1 and 2.
8.
(a) The present licensed spent fuel poolistorage capacity, and-(b)'_the-size of any. increase-_in-licensed-storage capacity that has been requested or is planned, in number of fuelaassembliest (a). 1830.
.(b) _.2880. --
9 The projected date of the last refueling-that can be discharged to the' Spent Fuel Pool assuming the present licensed capacity and-maintaining; space for one full core off-load.
.)
4 l
. March 1992.
- i
[
UNIT CURRENTLY IN REFUELING' SHUT DOWN y
- ENTRY HAS CHANGED SINCE LAST REPORTED 0
l '.
'