Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
.- .- . . ... . . ~ . .. , _ . . .
.s.
B ALTIMORE;
. ' OAS AND . ,
.*- ELECTRIC ;
)
CHARLES CENTER e P.O. BOX 1475: o. BALTIMORE, MARYLAND 21203 1475
t otunu u4uosa February.14, 1991-- )'
. CALVE AT CUFFS i
U.S. Nuclear Regulatory-Commiss!.on Washington, DC 20555
- ?
ATTENTION: Document Control-Desk-
SUBJECT:
Calvert Cliffs Nucicar. Power I'lantt ,
Unit Nos. 1 &i2; Dockets 50 317 and 50 318-January 1991 Operatinst Data Reoorts ,
Centlemen:
The subject reports are being sent:-to you.as required by_; Technical Specification 6.9,1.6. V <
Should you have any further questions regarding this' matter,s pleaseL contact-Bruce Meowca at (301)-260,3989.
o truly yours,
[ p ~
RED /LBS/reu _
i-Attachments .r cc: D..A. Brune, Esquire J. E. Silberg, Esquire R.' A. Capra, NRC D. C. Mcdonald, J r. , NRC T. T. Martin,- NRC. i R. I. McLean, DNR <
'R.-Hartfield, NRC-3 J. Wheelock, INPO . .
Resident Inspector,.NRC f
i y
9 i
.i 9102200015 910131 r
[AljL !
PDR- ADOCK 05000317 R PDR ri gff
. -_ _ , . _ _ _ . . . _ _ , - _ . . . . . _ _ . . . . . _ _ ...r. . , , , . . - - . .._
1
- ,a .6. .8 iUf S.-Nuciscr R$gulatory Ccamissionr .;
February 14,/1991
- Page 2 of 2
'bec: .J._ A. Tiernan/A.5J. Slusark , I
-C. H. Cruse P. E. Katz 3 R.'P. Heibel T. N. Pritchett :f M. J. Hiernicki -
1 W. A. Thornton j M. C. Gavrilas E. I. Bauereis .
R. B. Pond, Jr.
S . R . Buxb aum , - J r .
C. C.__ Lawrence, III A. R. Thornton.
L. B. Russell J. R.-Lemons '
R. M. Douglass R. F. Ash W. R. Corcora'n.
R. E. Denton :
R, C. DeYoung a C. P. Johnson J . --J . Connolly '
l J. H. Walter R. E. Nagel ,
-M. L. Stone- [
E.-K. Bewley.
J. E. Ringsdorf, Jr.
J. F. Lohr' P. G.-Chabot/B. B. Mrowca P. A. File /K. J . Allor <
4 I. A..Liberatore/C.- Behnke B'. S. Montgomery-; i D.' song l G,.~L. Adams'(2 copiec)
B.-Watkins A. : B .- Anuj e L G. L."Detter- 3 0 0.-J.-Falibota L. D. ~ Graber - , j D. V. Graf- il L. 0..Wenger- -l P.-A. Pieringer
- J. E. Baum:--
, Technical Librarian
- File- ,
g -
?
fj -l 1
(
- . Li U' , !
.o_.,_ _. . _ , _ _, . , . . ,_ . . , _ . _ . - - _ _ , , . . , . -- s .. . - . . . - .. . i, .
. a c.;
1 l
. q UNIT 1 OPERATING DATA REPORT Docket No. 50-317-February 14, 1991 '
Prepared _by Leo =Shanley-Telephonet(301)260-6744 OPERATING STATUS .
t
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING-PERIOD JANUARY 1991
- 3. LICENSED-THERMAL POWER (MWT) 2700-
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET-MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS :none-
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date. to Date-
- 11. HOURS IN REPORTING PERIOD 744 744 137,941
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 -97,260.8
- 13. REACTOR RESERVE SHUTDOWN HOURS H0. 0 0 . ~3,019.4
- 14. HOURS GENERATOR 10N LINE 744.0 744.0 95,033.8
- 15. UNIT RESERVE SilUTDOWN HOURS- 0.0 0. 0 '- 0.0
- 16. GROSS THERMAL ENERGY GENEkATED (>nTri) _ 1,815,749 '1,815,749 238,846_,463
- 17. GROSS ELECTRICAL EKERGY GEN'TED(MWH) 602,374 602,374 '79;433,141
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)- 575,716 '575,716' 75,465,893
- 19. UNIT-SERVICE FACTOR 100.0. ~ 10 0 . 0 - 68.9
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0- 60.9
- 21. UNIT CAPACITY' FACTOR (USING MDC NET) 93.8 93.8) 66.3 22.-UNIT CAPACITY-FACTOR (USING DER NET) 91.6 91.6 64.7
- 23. UNIT FORCED OUTAGE RATE -0 . 0 0.0 9.3
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT-SIX MONTHS (TYPE,-DATE AND DURATION):-
Maintenance / Test, February:2, 1991 for 14 days Maintenance / Test, June 1, 1991 for 50 days
- 25. IF SHUTDOWN AT END_OF REPORT PERIOu, ESTIMATED DATE OF START-UP:
N/A L
...j -
I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317
( UNIT NAME Calvert Cliffa-U1 a DATE February 14 1991 COMPLETED BY Leo Shanley l l, REPORT MONTH Januarv 1991 TELEPHONE (3011260-6744
-[
y METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE NO .' DATE TYPEl (HOURS) REASON 2 DOWN EVENT ACTION TO 1
REACTOR 3 REPORT f CODE 4 CODES PREVENT RECURRENCE
'91-01 910104 .F- 0.0 A '4 N/A SF VALVEX 1) Power was reduced to 79% while evaluating the safety. '
. significance of q
leak-by on 12B Safety Injection -
. Tank (SIT) outlet check valve.
I
- 2) .The safety analysis concluded. .
t
.that it was acceptable to operate at full power.
- 3) Valve vill be repaired.daring l the next maintenance outage.
j: !
s i-
?
t 1
4 .
1 'F: Forced '.. 2i Reasoni 3 . Method: 4 Exhibit G-Instructions S: Scheduled: .- A-Equipment: Failure . (Explain) 1-Manual for Preparation of Data B-Maintenance or Test- Manual Scrami Entry Sheets for License I
- .
- C-Refueling- .
~3-Automatic Scram. Event Report (LER)LFile; l' D-Regulatory Restriction ~ .
- 4-Other (Explain).. (NUREG-0161).
. 'E-Operator Training & License'. Examination
. .F-Administrative 5- -
Exhibit 1.- Same Source
'G-Operational' Error >(Explain) ,
__ __ a. . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -. . - - - - . .:- .~ - w ,- -
. -., ., a . -
- AVERAGE DAILY: UNIT POWER LEVEL-ono***********************************************e****************a****
~
Docket No. 50-317.
Calvert Cliffs Unit No. 1-
. February 14, 1991 Completed by Leo-Shanley-Telephone -(301)L260-6744 4 JANUARY 1991 a ,
Average Daily Power Level -Average Daily-Power _' Level
. Day (MWe-Net) -Dayt (MWe-Net)- -
1 863 '17 674: ,
2 834 18. 678 I
, 3 862 19- .824:_
4 814 20- =861-5 673 21 '863 ;
6 676 22: :862 7 677 23- 862 8 676 24 '862' 9 675 25 862-r ,
10 675' 26 862-11 673 27~ '8631 12 673 .- 2 8 863:
13 'a7 3 .29- 862 14 672 30 863
- -15 673 31
- 864--
t 16 675- -
{-
1 1
< s 4' 1
a 1
l DOCKET # 50 317- ,'
CALVERT CLIFFS - UNIT 1 -
February 14, 1991-
SUMMARY
OF OPERATING' EXPERIENCE-r January 1991- ;
Theunitbeganthemonthat100%powerj(860MWe). -7 Power was reduced to 80% (680 !!We) from'1300 to 1733 ont2jJanuary. -The power /
reduction. accommodated the removal-of a^condensateidemineralizer from service' while maintaining full condensate flow through the remaining demineralizers.
Power was reduced to 79% - (665 MVe) 'on '4. January.af ter it was discovered that:
there was significant leak-by on :12B -Safety injection- Tank (SIT) outlet check -
valve. An analysis'was performed and. it was. concluded that the Unit could safely operate at full power. The Unit'wasireturned to 100%;(855 MWe) at'1030 on 19 January.
~
The unit ended the. month at 100% powerL(860 MWe). _
i k
- I l' I l- -
q r .
+
1
. 'j February 7, 1991 REFUELING INFORNATION REQUEST
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
- 2. Scheduled date for next refueling shutdown: March 6, 1992.
- 3. Scheduled clate for restart following refueling:' Nay 17, 1992 -
- 4. Will- refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?,
Resumption of operation after refueling will require changes to :
Technical specifications' The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the-Tech Specs for Unit 1 Cycle 11.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
November 1, 1991 * ( reload submittal )
- 6. Important licensing considerations associated with the refueling. .
None identified at-this time.
- 7. The number of fuel assemblies (a) inithe core and (b) in the spent fuel storage pool.
(a) 217. (b) 1326.
Spent fuel pools-are common to Units 1 and 2.
- 8. (a) The' present licensed spent fuel pool' storage ca2acity, and-(b) the size of any increase in licensed storage _ capacity taat has been requested or is _ planned, in number of fuel assemblies.
(a) 1830. (b) 2880.
- 9. _The projected date of the last refueling that'can be discharged to the Spent Fuel Pool assuming the present' licensed-capacity and maintaining space for one full core off-load.-
Harch 1992. *
- ENTRY HAS. CHANGED SINCE LAST REPORTED I
t i
e***+***********************************************************************
UNIT 2 -
OPERATING-DATA REPORT . i
- 4 Docket No. 50-318 February- 14,~1991 'i Prepared by Leo Shanley .
Telephoner (301)260-6744 9$bDI!U9.!IDI95 -i
- 1. UNIT NAME Calvert Cliffs Unit 2 ;
- 2. REPORTING PERIOD JANUARY 1991
- 3. LICENSED THERMAL POWER (MWT) 2700 ,
- 4. NAMEPLATE RATING (GROSS MWe) 918 ,
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS-MWo). 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET-MWe) 825
- 8. CHANGE IN CAPACITY-RATINGS none -'
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a .!
Cumulative This month Year-to-Date to Date l
- 11. HOURS IN REPORTING PERIOD 744 744 121,296
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 87,437.3 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 3.0 1,296.6 i
- 14. HOURS GENERATOR:ON LINE 0,0 0.0 86,228.9
- 15. UNIT RESERVE SHUTDOWN HOURS- 0.0 0.0' O.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) O. 0 238,389,418
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 0 -72,284,632
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) O. 0 69,042,571
- 19. UNIT SERVICE FACTOR 0.0 0.0 71.1 -i l
- 20. UNIT AVAILABILITY FACTOR 0.0 0.0 .71.1- l
- 21. UNIT CAPACITY-FACTOR (USING MDC NET) 0.0 0.0 69.0 -!
- 22. UNIT' CAPACITY FACTOR (USING DER NET) 0.0 0.0 67.4
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.3 *
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT
~ SIX MONTHS-(TYPE, DATE AND DURATION):'
N/A -
. 25. IF UN'T IS SHUTDOWN AT END OF REPORT PERIOD, 4 ESTIMATED DATE.0F START-UP:
March-15, 1991 .l i
l t 4 " , c v ~
wewr~w <"-6 se sq d
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-318 UNIT NAME Co1 vert Cliffs-U2 ,
DATE February 14 1991 COMPIITED BY Leo Shanlev REPORT MONTH January 1991 TELEPHONE (3011260-6746 MET 110D OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1 2 ACTION TO NO. DATE TYPE (HOURS) REASON DOWN EVENT REACTOR3 O
CODE 3
~
REPORT g CODE PREVENT RECURRENCE 91-01 910101 S 744 ' .C N/A N/A Continued shutdown for 8th Cycle Refueling Outage.
I I
1 F: Forced 2 Reason: 3' Method: 4 Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -
B-Maintenance or Test 2-Manual Scram. Entry Sheets for License C-Refueling' .
3-Automatic' Scram. Event Report (LER) File-D-Regulatory Restriction .
4-Other (Explain) (NUREC-Ol61)
E-Operator Training & License Examination-F-Administrative 5 Exhibit'I - Same Source
.G-Operational Error (Explain)
H-Other (Explain)
AVERAGE DAILY UNIT. POWER' LEVEL -
oco*********************************************************************- i Docket No. 50-318: ,
Calvert Cliffs-Unit No. 2 February 14, 1991-Completed by Leo Shanley Telephone (301) 260-67.44 :
-t JANUARY -1991 Average Daily Power Level .
~ Average Daily > Power Level Day (MWe-Net): Day- (MWe-Net) 1 0 17 10-2 0 '18: 0- ;
3 0 '19 - 0
, i 4 0 20 0 5 0 21 ~0 6 0 22 0 7 0 23= -O.
0 0 24 0-9 0 25 10 0 26 0 11 0 27 0 12' O 28 0 13 0 29, 0 -- a 14' O- 30 ~ O '-
15 0 31: OI 16 0 i
i
DOCKET # 50-318 j CALVERT CLIFFS - UNIT 2 February 14, 1991
SUMMARY
OF OPERATING EXPERIENCE f
i January 1991 j
The unit began the month in a cont!.nued shutdown for the 8th Cycle Refueling {
Outage.
Reactor vessel reassembly and the integrated Leak Rate Test were completed.
Maintenance and Surveillance Test Procedures-continued in preparation for i drawing a bubble in the pressurizer, establishing secondary vacuum, plant heatup and reactor startup.
The unit is scheduled to return to service on March 15, 1991, i
- _ . . _ . _ _.. _ - . . _ _ _ _ _ _ . ~ _ ~ . _ _ .
- y. ..
a February 7, 1991 REFUELING INFORMATION REQUEST 1
- 1. Name of facility: Calvert Cliffs Nuclear Power Planti Unit No. 2., j l
- 2. Scheduled date for next refueling shutdown:. March 20, 1989.** 1
- 3. Schedui i date for restart following--refueling:. March 15, 1991.*
- 4. Will refueling or resumption of operation thereafter require.a Technical Specification change or other license amendment?
Unit reload license-and necessary technical specification changes-are- .
approved. The Unit is in an extended refueling shutdown to. support-system maintenance.
- 5. Scheduled date(s) for submitting: proposed 1icensing action:and; supporting information.
Unit reload license has been approved. The Unit is in an-extended refueling shutdown to support-system maintenance.-- ;
- 6. Important licensing _ considerations: associated with the refueling.
Reload fuel will be similar to' reload fuellinserted into the previous-cycle except for the 4.3% enrichment, debrisLresistant fuel design,: and ,
four fuel assemblies containingian alternative burnable- absorber.
Changes will be made to the on line incore monitoring program.
- 7. The number of fuel assemblies-(a) _in the core and '(b) in the spent fuel .
storage-pool..
- i (a): 217.- (b)z1326.
Spent fuel pools:are common to Units 1 and 2.
- 8. (a) The present licensed spent fuel poolistorage capacity, and-(b)'_the-size of any. increase-_in-licensed-storage capacity that has been requested or is planned, in number of fuelaassembliest (a). 1830. .(b) _.2880. --
9 The projected date of the last refueling-that can be discharged to the' Spent Fuel Pool assuming the present licensed capacity and-maintaining;
- space for one full core off-load. .) 4 l . March 1992. * --
i
- UNIT CURRENTLY IN REFUELING' SHUT DOWN y ,
- ENTRY HAS CHANGED SINCE LAST REPORTED 0 l '. ;
'