ML20066G634
| ML20066G634 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/31/1991 |
| From: | Buschbaum D, William Cahill, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TXX-91067, NUDOCS 9102190213 | |
| Download: ML20066G634 (5) | |
Text
- _ _ - - _ - _ _ _ _ _ _
4 l
__[]
Log # TXX 91067 File # 10010.2 Ref.
- 10CFR50.36 1UELECTRIC Fek uary 15, 1991 wmiam J. cahm. Jr.
Execunw Vke hmirris V. S. Nuclear Regulatory Commission Attn:
Document Control Desk
^
Washington, DC 20555
$UBJECT:
C0HANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 HONTHLY OPERATING REPORT FOR JANUARY 1991 Gentlemen:
Attached is the Monthly Operating Report for January 1991 prepared and submitted pursuant to Specification 6.9.1.5 of Appendix A (Technical Specifications) to the Comanche Peak Unit 1 Steam Electric Station Operating License, HPF-87.
Sincerely, William J. Cahill, Jr.
By:
D. R. Woodlan Docket Licensing Manager JLR/grp Attachment c - Mr. R. D. Hartin, Region IV Resident Inspectors, CPSES (3)
Mr. J. W Clifford, NRR 9102190213 910131 PDR ADOCK 0500 5
((g 400 North Olive Street L.ll. 81 Dallas, Texu 75201 j
F 1
Attachment to TXX 91067_
Page 1 of 4..
COMANCHE PEAK STEAM' ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO:
50 445 UNIT:
CPSES 1 DATE:
Februarv 8.1991 COMPLETED BY:
D. E. Buschbaum TELEPHONE:
817 897-5851 OPERATING STATUS -
5
( 1 '. -
Reporting Period:' JANUARY 1991 Gross hours in reporting period: 744 2.
Currently authorized power level (MWt): 3111. Max. depend. capacity (MWe-Net): 11M* Design Electrical Rating (MWe Net):.11E 3.
Power level to which restricted (if any) (MWe Net): Hong
'4.
Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE 5..
Number of hours reactor was critical 710.5 710.5 3636.9-
-6i Reactor reserve shutdown hours 33.5 33.5 306.4
.7.
L Hours generator on line 702.5 702.5 3568.2
!.8, -
Unit reserve shutdown hours 0
0 0
.9.
Gross thermal energy generated (MWH) 2,259,446 2,259,446 10,416,374
- 10. Gross electrical energy generated (MWH) 762,318 762,318 3,427,318
- 11. Net = electrical energy generated (MWH) 728,251 728,251 3,241.765
' 12. Reactor Service factor ~
95.5 95.5 88.3
.1 3.- Reactor availability factor
.100 100 95.7
- 14. ' Unit. service factor 94.41 94.4 86.0 15'.' ' Unit availability > f actor 94.4 94.4 86.6 L16! Unit capacity factor (Using MDC) 85.2 85.2 68.4
- 17..-Unit capacity factor (Using Design MWe) 85.2 85.2 68.4
- 18. Unit forced outage rate-5.6 5.6 7.4
- 19. -Shutdowns' scheduled over next 6 months (Type, Date, and Duration of each):' a) Maintenance /
t Surveillance, 910413,' 6 weeks.
~20<'If shutdown at end of report period estimated date of startup:
=21., Units in test status (prior to commercial operation):
FORECAST ACHIEVED Initlai Criticality 900403 900403 initial' Eleciricity 900501 900424 Commercial Operation 900721 900813 l-
_ Estimated
l s-
' Attachm?nt to TXX 91067_-
- Page 2 of 4..
AVERAGE DAILY UNIT POWER LEVEL
-h DOCKETNO:
50 445-UNIT:
CPSES 1 DATE:
February 8.1991 COMPLETED BY:
D. E. Buschbaum TELEPHONE:
817-897-5851-MONTH. JANUARY 1991 DAY -
AVERAGE DAILY POWER LEVEL.
DAY
- AVERAGE DAILY POWER LEVEL-(MWe Net)
-(MWe Net)
!1 1063 17 1065 2-1063 18 1053 3<-
1061 19 1061
- _ 4 '
1061 20
-1060 t51
-1060-21 1060-1
!6:
1R' 22 1060
' 7-1060 23 720 E8-1062 24 0
- 9_)
1061 25 205-10'-
1067' 26 879 11 1 1066 27 1062 z12 1018
-28~
1357-
~ 13 --
1066-29 1053 E14:
1061 30 1048-
.15 ~
1060 31 1050 16' 1063
i.o ' ;
g[
Attachment to TXX 91067 -
L Page 3 of 4., -
q, 7
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH' t
.]:
DOCKETNO:
50-445' UNIT:
- CPSES 1 DATE:
Februarv 8,1991 COMPLETED BY:
D. E. Buschbaum
[
TELEPHONE:
B17 897 5851
[
- MONTH': JANUARY 1991 J-1/1l 0000 Unit started month in MODE 1.
1/23 1636-
- Reactor Trip, Unit entered. MODE 3.
Reactor tripped on Turbine Trip due to low primary _ water pressure to main generator.
3 D25' 0206
. Unit' entered MODE 2.
0340 Unit Ontered MODE 1.
11/31 2400-
~. Unit ended month in MODE 1.
I F, \\, $
3 W
'-}
'l t
l'
-. = -.
{ \\,
Attachment to TXX-91067.
..c Page 4 of 4
(
L UNIT SHUTDOWNS' AND POWER REDUCTIONS DOCKETNO -
50-445
- UNIT:.
CP_SES1
. DATE:
February 8.1991' COMPLETED BY:
D. E. Buscitaum TELEPHOfE:
817-897-5851:
- REPORT MONTH JANUARY 1991-AETHODOF -
TYPE SHUTTNG DOWN.
F. 6 DURATION TFEREACTOROR M
DATE SSCHEDUED (HOURS)
FEATN REDUCNG POWER CORREunVE/CTIONSCOfAENTS 001 900123' F.
41.5
~A 3
. Reactor Trip on Turbine Trip..See previous page. IIR 91-002 to follow.
4 t
t i
1}
REASCN 2 ) METHOD A : EQUIPMENT FAILURE (EXPLAIN)
E OPERATOR TRANING AND UCEPGE EXAMINATION 1: MANUAL
.j B: MAINTOR TEST F: ADMINISTRATIVE 2i MANUALSCRAM C-REFUEUNG G OPERATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM l
D: REGlA.ATORYRESTRCTION H: OTHER(EXPLAIN)'
4: OTHER (EXPLAIN) -
_