ML20066G033

From kanterella
Jump to navigation Jump to search
Forwards Rept on Seismograph Surveys Conducted in Barnwell, Aiken & Allendale Counties,SC:AXC-26657 & 1/2 Seismic Survey,Savannah River Plant Bedrock Waste Storage
ML20066G033
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/12/1982
From: Dutton D
GEORGIA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20066G037 List:
References
NUDOCS 8211190271
Download: ML20066G033 (1)


Text

C oq:.sIh;A+, O ;

r.y D i I *.

V' ' ? O Jf.)

[d'. ]Q (;* J Q'd

[d e<,e tj;$;.,7703

' V r,; / J S;-

, a G

3T Georgia Power D. E. Dutton

<: pu c

.c November 12, 1982 Director of Nuclear Reactor Regulation Attention: Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT POSTULATED MILLETT FAULT STUDY

Dear Mr. Eisenhut:

As requested at the October 29, 1982 Postulated Millett Fault Study meeting with members of the NRC staff in Bethesda, Georgia Power Company is for-warding the seismic reflection lines from the Savannah River Plant.

Please find enclosed the replay sections for the refraction lines in the vicinity of the Postulated Millett Fault, the time cross sections, the top triassic, saprolite, and crystalline rock countour maps, and the velocity gradient map. Also enclosed are five copies of a report issued as part of the re-flection studies. All this infonnation is available through the Oak Ridge, Tennessee Repository.

Should you have any questions, please inquire.

  • ncere i

dkN Doug Dutton Vice President Generating Plant Projects O{

QO DED/ JAB /sw y

g xc:

R. A. Thomas G. S. Grainger h4, Ep.

J. A. Bailey R. A. Jackson

0. Batum E. L. Doolittle p *,

D. O. Foster J. M. Grant T

DW C. R. McClure G. F. Trowbridge p

T hK O hoch PDR

./