Forwards High Energy Line Break/Control Sys Failure Analysis, Per Section 7.7 of Suppl 1 to Ser.Postulated Break,W/Resulting Adverse Effects of Nonsafety Feature,Poses No Major Risk to Public Safety & Health
ML20066E799
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/08/1982
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20066E800 List:
References
SNRC-786, NUDOCS 8211170211
Download: ML20066E799 (2)


Text

LONG ISLAND LIGHTING COMPANY W

/ww SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 November 8, 1982 SNRC-786 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SER Issue No. 48, High Energy Line Breaks Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Mr. Denton:

As stated in section 7.7 of Supplement No. 1 to the Shoreham Safety Evaluation Report (SER), the Long Island Lighting Company committed to conduct a review to demonstrate that the harsh environments associated with high energy line breaks do not cause control system malfunctions and result in consequences more severe than those of the Chapter 15 analyses or beyond the capability of operators or safety systems.

O N/

In fulfillment of this commitment, enclosed are forty (40) copies m

of a report entitled, "High Energy Line Break / Control System Failura Analysis".

This report presents the results of a compre-hensive study, including a walkdown of the plant areas, that was conducted (1) to identify non-safety control systems and components that may be affected by postulated pipe breaks, and then (2) to conservatively determine the state of the reactor as a result of the simultaneous failure of all affected non-safety control systems.

It is concluded that all conditions resulting from the postulated pipe break events (10 conditions resulting from a postulated pipe break were evaluated individually and in a com-bination) are bounded by the Chapter 15 analysis.

With the excep-tion of the loss of feedwater heating exacerbated by a turbine trip at elevated reactor power levels, the transient events meet the conservative limits of the transient category.

It is concluded, based upon analyses, inspection procedures, and operator action, that this event is a low-frequency accident event which is bounded by the accident events of the FSAR Chapter 15.

Therefore, the postulated high energy line break, with resulting adverse effects of non-safety control systems, poses no significant risk to the health and safety of the public.

No further accident analysis or any design modification is necessary.

n

(

)

N,1 I211170211 8211og

}I

{DRADOCK 05000322 PDR

(

November 8, 1982 O

SNRC-786 Page 2 The submittal of this report completes the confirmatory information required by the Staff to completely close out SER Issue Number 48.

Should you have any questions, please contact this office.

Very truly yours, l -

v J. L. Smith l

Manager, Special Projects j

Shoreham Nuclear Power Station i

RJT:mp Enclosure cc:

J.

Higgins All parties O

l l

.. ~