ee OPERATING DATA REPORT DOCKET NO. 50-313 DATE 1/12/82 CON 1PLETED llY _Bramlett TELEPilONE .501-964-3145 OPERAlING STAl US Notes

1. Unit Name: Arkansas Nuclear One - Unit 1 December 1 - 31, 1981
2. Reporting Period:
3. Licensed Thermal Power (5th:1: 2568
4. Nameplate Rating (Gross stWel:

902.74 .

5. Design Electrical Rating (Net 51Wel:

8E

6. Slasimum Dependable Capacity (Gross h!We): 883
7. 51asimum Dependabic Capacity (Net A!We;: 836
8. If Changes Occur in Capacity RatinFs (ltems Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Lesel To which Restricted. lf Anv (Net SlWe): None
10. Reasons For Restrictions. If Any: N/A This hionth Yr.. o.Date Cumulatise l l .Cilours in Reporting Period 744.0 8760.0 61675.0 ---

12; Number Of liours Reactor Was Critical 744.0 6457.2 42247.5 13.vReactor Resene Shutdown llour, 0.0 149.0 5044.0 14.11ours Generator On.Line 744.0 6338.8 41383.8~

0.0 0.0 UI/.b

15. Unit Rewne Shutdown liours
16. Grow Thermal Energy Generated (51Will 1713511. 15358240. 99530206.
17. Gross Electrical Energy Generated 131Will 578550. 5138195. 32836756.
18. Net Electrical Energy Generated th1Will 550978. 4900762. 31316401.

100. 72.4 67.1

19. Unit Senice Factor 100. 72.4 68.4
20. Unit Asailabiliiy Factor
21. Unit Capacity Factor (Using 51DC Neti 88.6 66.9 60.7
22. Unit Capacity Factor (Using DER Net) 87.I 65.8 59.7 l
23. Unit Forced Outage Rate / 0.0
24. Shutdowns Scheduled Oser Nest 6 51onths (Type. Date.and Duration of Eacht:

8.9 16.1 None

. s

25. If Shut Down At I nd Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achiesed INI TI A L CRITICA LITY INillT I. ELECT RICI TY CO\1\ll.RCI A L OPER AIION
8211150146 820115 '

hDRADOCK 05000313 p,,;y ,

PDR

I I

,= AVER AGE DAILY UNIT POWER LEVEL f

50-313 l DOCKET NO. - 1 UNIT 1 DATE l/12/82 COMPLETED BY Bramlett TELEPHONE 501-964-3i45 MONm December \

DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 713 37 748

. . 2 713 744 33 3 712 ', 745

! 713 745 4 20 -

5 715 21 744 6 736 g 743 7 764 23 742 8 762 24 738 9 758 25 736 10 764 26 732-11 760 27 734 12 757 734 28 13 7RR ---

29 735 14 751 3o 734 15 751 735 3,

I 16 748 INSTRUCTIONS On this forrnat, hst the aveuge daily unit power leselin MWe Net for each dayin the reporting inonth. Compute to the nearest whole rnegawaii.

(9/77) b

. o, 50-313 DOCKET NO.

UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-Unit 1 DATE Jannarv 4- 1QR7 COMPLETED BY A. J. Gertsch REPORT MONTH December TELEPHONE (501) 964-3155

~;-

ea 3 to O ,

.=2 ,e E ,sx Licensee g-to 6t

= Cause & Corrective N,o . Date g 3g 3 ,3 g 5 Event  ?? S.3 0

Action to H 5 rE 0 Prevent Recurrence

$E j@g Report a 6

NONE b

i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3- Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Continuation 0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative I 9-Other Exhibit I Same Source G-Operational Error (Explain) 01/77) Il Other (Explain)

. i

UNIT SHUTDONNS AND POWER REDUCTIONS INSTRUCTIONS This report should describe all plant shutdowns during the in accordance with the table appearing on the report form.

report period. In addition,it should be the source of explan. If category 4 must be used, supply brief comments.

ation of significant dips in average power levels. Each signi-LICENSEE EVENT REPORT -t. Reference the applicable ficant reduction in power level (greater than 207c reduction in average daily power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) reportable occurrence pertaining to the outage or power should b'e noted, even though the unit may not have been reduction. Enter the first four parts (event year. sequential report number, occurrence code and report type) of the (ne shut down completely l For such reductions in power level, the duration should be listed as zero, the method of reduction part designation as described in item 17 of instructions for Preparation of Data Entry Sheets for Licensee Event Repon should be listed as 4 (Other), and the Cause and Corrective Action to Prevent Recurrence column should explain. The (LER) File (NUREG 0161). This information may not he immediately evident for all such shutdowns of course, smee Cause and Corrective Action to Prevent Recurrence column further investigation may he required to ascertam whether or should be used to provide any needed explanation to fully describe the circumstances of the outage or power reduction.

not a reportable occurrence was involved.) If the outage or power reduction will not result in a reportable occurrence.

NUMBER. This column should indicate the sequential num- the positive indication of this lack of correlation should be noted as not applicable (N/A).

ber assigned to each shutdown or significant reductionin power for that calendar year. When a shutdown or significant power SYSTEM CODE. The system in which the outage or power reduction begins in one report period ard ends in another. reduction originated should be noted by the two digit code of an entry should be made for both report periods to be sure Exhibit G Instructions for Preparation of Data Entry Sheets all shutdowns or significant power reductions are reported. f r Licensee Event Report (LER) File (NUREG-0161).

Until a unit has achieved its first power generation, no num-ber should be assigned to each entry. Systems that do not fit any existing code should be designa ted XX. The code ZZ should be used for those events where DATE. This column should indicate the date of the start a system is not applicable.

of each shutdown or significant power reduction. Report as yeer, month, and day. August 14,1977 would be reported COMPONENT CODE. Select the most appropnate component as 770814. When a shutdown or significant power reduction from Exhibit 1 - Instractions for Preparation of Data Entry beginsin one report period and ends in another, an entry should Sheets for Licensee Event Report (LER) File (NUREG-01611.

be made for both report periods to be sure all shutdowns using the following critieria:

or significant power reductions are reported.

TYPE. Use "F" or "S" to indicate either " Forced" or " Sche. _

duled," respectively, for each shutdown or significant power B. If not a component failure, use the related component.

reduction. Forced shutdowns include those required to be e.g.. wrong valve operated through error; list valve as initiated by no later than the weekend following discovery component.

of an off-normal condition. It is recognized that some judg.

ment is required in categorizing shutdowns in this way. In C. If a chain of failures occurs, the first component to mal.

general, a forced shutdown is one that would not have been function should be listed. The sequence of events.includ-completed in the absence of the condition for which corrective ing the other components which fail. should be described action was taken under the Cause and Corrective Action to Present Recur-rence column.

DURATION. Self-explanatory. When a shutdown extends Components that do not fit any existing code should be de-beyond the end of a report period, count only the time to the signated XXXXXX. The code ZZZZZZ should be used fm end of the report period and pick up the ensuing down time events where a component. designation is not applicable.

m the following report periods. Report duration of outages rounded to the nearest tenth of an hour to facilitate summation. CAUSE & CORRECTIVE ACTION TO PREVENT RECUR.

The sum of the total outage hours plus the hours the genera. RENCE. Use the column in a narrative fashion to amphis m '

tor was on line should equal the gross hours m the reportmg explain the circumstances of the shutdown or power reduction penod. The column should include the specific cause for each sinn down or significant power reduction and the~immediate anJ REASON. Categoriqe by Ictter designation in accordance contemplated long term sorrective action iaken. if approrn-with the table appearmg'on the report form. If category 11 ate. This column should also be used for a desenption of the must be used. supply brief comments major safety-related corrective mamtenance perfomied during the outage or power reductmn including an identification of METilOD OF SilUTTING DOWN Tile REACTOR OR the critical path activity and a report of any single release of REDUCING POWER. Cateponte by number designation radioactivity or single radiation esposure specitically associ.

INote that this ditters from the Edison Electric Institute sted with the outage which accounts for more than 10 percent (EEI) definitions of " Forced Partial Outage" and " Sche. of the allowable annual values.

daled Partial Outage." For these terms eel uses a change of For long textual reports continue narrative on separate paper 30 MW as the break point. For larger power reactors. 30 MW and reference the shutdown or power reductmn for thi>

is too small a change to wanant explanation. narrative.

o REFUELING INFORMATION

l. Name of facility. Arkansas Nuclear One - Unit 1
2. Scheduled date for next refueling shutdown. 1/1/83
3. Scheduled date for restart following refueling.3/15/83
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes. Reload report and associated proposed Specification changes.

5. Scheduled date(s) for submitting proposed licensing action 'and supporting information.10/1/82
6. Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Will reload 72 fresh fuel assemblies and operate for approximately 16 months. FoUr of which will be high burn-up test assemblies.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 244
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 589 increase size by 0

9. The projected date of the last refueling that can be discharged
to the spent fuel pool assuming the present licensed capacity.

l DATE: 1986 0

--- m m.. -- . - - _.

t V ".

t NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

- DECEMBER, 1981 UNIT 1 Unit One began the month at 85.97% full power. The unit is in a power

limited condition due to fouling of the "A" Steam Generator. Periodic

! power adjustments have been required throughout the month to prevent flooding of the feedwater nozzles. Unit One ended the month at 88.30%

full power with further power adjustments anticipated.