UPERATING DATA REPORT 1
DOCKETNO 50-413 1 ATE ILny,a_r.L1}d991 OPEMT!NG$1ATUS COMPLETED BY R.A. Willises
]
TELEFHONE - 704-373-59R L l
!. Unit Nant Catawba 1
- 2. Reporting Perloh December 1, 1990-;ecember 31, 1990
- 3. Licensed Iberaal Power (MWth 3411 C.NaseplateRating(BrossMWe):
1305s.
Notes-*NaseplateRatiN
- 5. Design Electrical Rating (Net MWe):
!!45 (Gress MWe) calculated as
-l 6.MaxinusDependableCapacity(6rossMWeh-1192 1450.000 MYA x.90 power
- 7. Maxinus Dependable C#pacity (Net MWe):
1129-NURE6-0020.
fa: tor per Page 111, j
B. If Changes Occur in Capacity Ratings (iteas Nusber 3 Through 7) Since Last Report. Give Reasons
- 9. Power Level To Which Restricted, if Any (Net MWe):
i
- 10. Reason For Restrictions, if any:
This Mcnth
.Yr -to Date Cumulative
- 11. Hours in Reporting Ferted 744.0 B760.0 482119.0
- 12. Nuaber Of Hours hactor Was Critical 744,0 6348.9 36017.7
-13. Reactor Reserve Shutdown Hours
- =--0--
--0--
- 14. Hours 6enerator On-Line 744.0' 6278.9 35164M-
- 15. Unit Reserve Shutdova Hours
--0--
--0--
.6. Gross Thermal Energy Benerated (MWH) 2472954 20766406 11330:511
- 17. Gross Electrical Er.argy Generated (MWH) 666619 73tl663 39764484
- 18. Net Electrical Energy Generated (MWH) 840769~
6869051 372662E9
- 19. Unit Service Factor 100.0 71.7 72.B 20.UnitAvailabilityFactor
-100.0'
'71.7 72.B -
- 21. Unit Capacity Factor (Using MDC Net) 100.1 69.5 67.9
- 22. Unit Capacity Factor (Using DER Net) 98.7'
. ' 68.5 -
67.4
- 23. Unit Forced Outage Rate 0.0 9.0 12.7-
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Rnfurling - March 185. 1941 - 19 wnnks-1
- 25. 1f Shut Down At End Of Report Period. Estimated Date of Startup
- 26. linits in Test Status (Prior to Conaercial Operation):
Forecast Achieved INITIALCR111CALITY INITIALELECTRICITY COMERCIAL OPERATION t
- I 9101180301 910115 PDR -ADOCK 03000413
-R PDR
+,..
t
+.;
4 OPERATING DATA REPORT
- DOCKET NO 50-413 UNii Catauba 1-DATE Januuv 15i 1990 -
E0MPLETEDBY R.A. Williaec TELEPHONE,, 704-373-5907 RON1H Decesber,1990 QE AVERASE-DAILYPOWERLEVEL' QM AVERAGE. DAILY POWER LEVEL (MWe-Net)'
(MWe-Net 1 l
1
!!34 17 1131 2
1132 18-1126 3
1124'
-19 1127 4
1130 20 1130 l
5 1134 21
- 1130 6
1135 22 1125' 7
t135 23 110e 6=
1137 24 1127 9
1121 25 1132-
[
10 1133 l26 1134-11 1133 27 1135 12
-1132 28 1136 13 1130 29 1135 t-14 1132 30 1128 15 1134 31 1po-16~
1129 1
I e
~-
2 m.,
v r
.e
~
UNIT' SHUTDOWNS RND POWER REDUCTIONS DOCKET NO.
50-413'
' UNIT NAME CATAWL3A 1-DATE ul/13/v1 REPORT MONTH
' December 1990-
~ COMPLETED BY s.
W.
Must.x
. TELEPHONE-t/v4)-3/J-D/b2 (1) 2)
(4)
(5)
E HOD
~T-A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O.
P DURATION O
DOWN REPORT.
TEM COMPONENT ACTION TO DATE E
HOURS N-R/X NO.
CODE CODE PREVENT RECU13tENCE.
NO SHUTDOWNS OR REDUCTION S I'
i
-(1{ Forced -
eason-.
(3
-(4 (2
ethod:
' xhibit G - Instructions' S Scheduled A-Eaui ment: Failure Explain)
~1-Manual-(EntrySgarationof-Data-eets For'-Licensee-for Pre B-Mdin enance or tes
'2-Manual Scram.
C-Refueling
'3-Automatic Scram-Event Report (LER (NUREG-Ol61))
D-Regulatory Restriction.
4-Other-(Explain).
File E-Operator' Training' & -License Examination F-Administrative-(5)-
G-Operator Error (Explain).
Exhibit I - Same Source H--Other (Explain)'
1 w
=
-aum...
m
,.,,,m--.
..,__,,._d...~._4dT
....E.
,,..m._,,_,.,m
DOCKET NO:
50 413 UNIT: Catawba 1 DATE:
1/15/91 i
~!
NARRATIVE
SUMMARY
MONTil:
December 1990 Catawba Unit 1 began the month of December operating at.100% full: power, The unit operated at or near,100% full power for the entire month, and endct the month operating at 100% full power.
4 s
t Prepared by:
S. W. Moser Telephone:
704 373-5762
MONTilLY REFUELING INFORMATION REQUEST 1.
Facility names catawba. Unit 1 2.
Scheduled next refueling shutdown: March 1991 3.
Scheduled restart following refueling: June 1991 4.
Will refueling or resumption _of operation thereafter require a technical specification change or other license' amendment?
If yes, what will these be?
If no, has reload design and core _ configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?-
5.
Scheduled date(s) for submitting proposed licensing-action and supporting information:
6.
Important licensing considerations (now or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new cperating procedures).
Tile PROJEGT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.
7.
Number of fuel assemblies (a) in the coret 193 (b) in the spent fuci pooli 264 i
8.
Present licensed fuel pool capacitp 1418 Size of-requested or planned increase g
9.
Projected data of last refueling which can be accomm, dated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: January 15, 1991 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
~
OPERATING DATA REPORT l
l DOCKET ND 50-414 l
DATE h DUafY 15. 1991 l
OPERATINB STATUS COMPLETED BY _ R.A.-Williaes TELEPHONE 704 373-5987
- 1. Unit Name: CatanDa 2 2, Reporting Feriodi December l 19904eceeber 31,1990' i
- 3. Licensed Thereal Power (MWt):
3411
- 4. Naseplate Ratitig (6 toss MWe):
1305e Notes *Naseplate Rating 5.DesignElectricalRating(NetMWe):
1145 (Bross MWe) calculated 45' %
6.MaxinusDependableCapacity(BrossMWe):
1192 1450.000 MVA
.90 power
- 7. Maxinus Dependable Capacity (Net MWe):
-1129 factor per Page ill,-
- 8. If Changes Occur in Capacity Ratings (Ite65 Nusber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasonsi
- 9. Power level To Which Restricted, if Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Feriod 744.0 6760.0 38305.0'
- 12. Nueber Of Hours Reactor Was Critical 744.0 6047.5 27596.0
- 13. Reactor Reserve Shutdown Hours
--0--
--0-- -
- 14. Hours Generator DrK.ine 744.0 5986.2 26941.0 l
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy 6enerated (MWH) 2430352-19219046 83331646
- 17. Gross Electrical Energy Generated (MWH) 066012 6847259 29463425 l
- 18. Net Electrical Energy Generated IMW){}
821921 6437597 27582613 l
19.UnitServicefacter 100.0 68.3 70.3 L
- 20. thit Availability factor 100,0 60.3 70.3
- 21. Unit Capacity Fattor (Using MDC Net!
97.8 65.1-63.5
- 22. Unit Capacity Factor (Using CER Net) 96.5 64.2 62.9
- 23. Unit Forced Outage Rate 0.0 1.6 14.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, 9 ate, and Duration of Each):
Nnnn i
I l
- 25. If Shut Down At End Of Report Feriod. Estinated u te of Startupi
- 26. Units in Test Status (Prior to Cosearcial Operation):
Forecast Achieved INITIALCRITICALITY INiilAL ELECTRICITY l
COMERCIAL 0FERAil0N l
t i
'lFERAf f r' DATA REPORT 2
l DOCKETN0 50-414 i
UN!I__...(t{4mbaP t' Alt hnwy 15. 1990 COTLETEDBY FAntillim i
t[i[PHDNE 704 37b5987 s
J 00 NTH Detteter.100.
(11 AVERACE DAILY iDWER LtVEL El AVIRADE DAILY POWER LEVEL 1
(MWe Net)
(MWeNet) i 1129..
17 1129 2
1127 1B 1106 3
1120 19 1000 4
1124 20 ~
1094 i
r 1
1129 21 llP' 6
1120 22 1130 7
1129 23 1124 8
1104 14 920 9
1127 25 1120
'l s
l 10 llP9 26 l$37 1.
l 11 1129
- 27 1135 t
12 1 RL.,
EB 1133 l
13 1124 29 1133
(
14 1120 30 llP3 15 005 31 1127 16 1049 i
l l
f L
l.
i e
l; I
.-4
.- - ~.._
m..._..,.
..--_.~....,.-,.:,.
.~
i UIGT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAWBA z r
DATE 01/ id/ 91 REPORT MONTH December 1990 COMPLETED BY
.s. w. rivd t.H TELEPHONE
(/v41-J/J-bib 2 (1) 2)
3 (4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SvS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
P/X NO.
Cer-CODE PREVENT RECURRENCE 18-P 90-12-15 F
A CH TURBIN FEEDWATER PUMP TURBINE
'B' REPAIRS 19-P 90-1? 24 S
F ZZ ZZZZZZ DISPATCH REDUCTION i
i I
s V
1 (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-Equihment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Entry Sneets For Licensee l
C-Refueling 3-Automatic Scpm Event Rep rt (LER)
D-Regulatory Restrictien 4--Other (Explain)
File (NLnEG-Ol61)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Errgr (Explain)
Exhibit I - Same Source H-Other (Explain) h 6
4
_. _ _. ~
l 1
DOCKET NO:
50 414 UNIT:
Catawba 2 DATE:
1/15/91 NARRATIVE SUHMARY MONTH:
December 1990 Catawba Unit 2 began the month of December operating at 984 power, limited due to steam generator "D" feedwater preheater max flow.
The unit operated at or near 98t power until 0001 on 12/15, when a load
~
reduction was commenced due'to a problem with feedwater pump turbine "Ba.
The unit was held at approximately 706 power from 0633 on 12/15 to 0005 on 12/16.
The unit reached 986 power at 1030 on 12/16, and operated at or near 98% power until 2305 on 12/23, when a load reduction was commenced due to economic dispatch. The unit was held at
~
approximately 70% power from 0300 to 0827 on 12/24 per dispatcher's request.
The unit reached 98% at 0027 on 12/25, and operated at:98%
power for the remainder of the month, l
1.
t i
l l
Prepared by:
S. W. Moser Telephone:
704 373 5762 t
i y
i 1
)
i i
MONTIILY REFUELING INFORMATION REQUEST i
1.
Facility names Catawba. Unit 2 2.
Scheduled next refu ling shutdown:
September 1991 3.
Scheduled restart following refueling: F.>vember 1991, 4.
Will refueling or resumption of operr. tion thereafter require a technical specification change or other licenso amendecat?
If yes, what will these bc7 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting informationt 6.
Important licensing considerations (now or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Ti!E PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANCE OR LICENSE AMENDhCNT. TilEREFORE, QUESTIONS 4 TIIROUGb 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
7.
Number of fuel assemblics (a) in the core 193 (b) in the spent fuel pool 204, 8.
Present licensed fuel pool capacit.y:
1418 Size of requested or planned increase 9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
January 15. 1991 Name of
Contact:
J. A. Reavis Phone:
704-373-7567