ML20066D868

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1981
ML20066D868
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/04/1981
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML20066D863 List:
References
NUDOCS 8211120321
Download: ML20066D868 (1)


Text

.

=

r s

s s

t j

t-OPERATING. DATA REPORT s..-

.s 50-315 D o c r.ET N O. __

DATI 5~4-81 COMPLETED ?.Y A. I. Tetzlaff -

s TELEF!iCNg 616-465-5901 CPERATING STATUS Donald C. Cook Unit 1 Nor:s

1. Unit b.ame:

April 1981

2. Reportiag ?eded:

3250 _

3.1.icensed ne.=:1 ?cwer (MW:):

1983

4. N2=es!ste Rad =;(Gross MWe): _

1054

5. Design Eles::-:=1 R::ing (Nec MWe):

1080

6. M :d:num Depend:hte Cap:ci:y (Gross MWe):

1044 T. Maxir-nm Depe. d:ble C:p:ci:y (Net MWe):

8. If C. sages Oc= urin Capsci:y Rati:gs (Items Nu:nher 3 Through 7) Since Last Repor:. Give R: sons:

t_

9. Power Level To Which Ker:d :ed.If Any (Net MWe):
10. Reasons For R:s:d: dons.If.uy:

his Month Yr.<o.Date Cu=u!s:ive 719

  • 2,879
  • 55.487

!k

11. Hours In Repor:ing Pedod.
  • 42.274.1 719
  • 2,753.1_
12. Nu='cer of Hoc:s Re::or Was Cd:id 0

0 463

13. Re:ctor Rese. e She:down Hot:s 719
  • 2,743.4
  • 41.300.5
14. Hours Gene = tor on.L*ne \\::s 0

0 321

15. Unit R.-serve Shutdown li 2,336,161 8,817,877 118,044,883
16. Cross The:=st En=::y Ce e.hted (MWM)
17. Gross E!ee:de:IIse::y ceae d:ed (MWH) 781,190 _

2,946,920 38,802,580

15. Net E!e :de:1 E==::y Gener ;.$d g4W'r-)

754,512 2,845,722 37,304,863 100 95.3-77.5

19. Unit Service Esc:or 100 95.3 77.5
20. Ucir Av..ilabill:y F:c:or
21. Unit C:paci:y F:::or (Usin: MDC.Yet) 9_7. 0
  • 92.8 69.1 91 7_

65.1 95.'4 ;

22. Unit Capscity F:::or(Using D*R:Iet) 6.5 0

.7

23. Unit For:r'd On::ge Race
24. Shutdowr.s Scheduled Over Nex: 6 Months (Type. D:te. :nd Dur:: ion of E:ch1:

Refueling Outage 5-25-81 60 days

~

25. If Sh:: Do'wn At End Of Report Pedod. Estim: red D ce of Star:up:

. 25. Units In Tes: Sc::us (Pdor to Ce=r=ere!:f Ope::: font:

Force:st Achieved INITIAL CRIT'CA LJTY INITIA L E'. ECTR:C;W CO.*.i.*.! ERC:A:. OPERATION 4

Hours in reporting period changed as requested by NRC (Gill. Ross) t Plant Data is maintained on EST. for Canton SPPC and Ft. Wayne mm Coordinating Office.

' ~'

~

8211120321 810611 DR ADOCK 05000315 PD

__..-..-..~,R__.

w