ML20066D861

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1981 & Revised Monthly Operating Rept for Apr 1981
ML20066D861
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/11/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20066D863 List:
References
NUDOCS 8211120318
Download: ML20066D861 (1)


Text

'* ^,. -

p.

z +' y %

",,. INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (GIG) 465-5901 June 11,1981 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

~

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the month of May, 1981 is submitted.

Also attached is a revised copy of the Operating Data Report for the month of April, 1981 which was changed at your request to show 719 i

hours in the reporting period rather than 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> due to the change to daylight savings time.

Sincerely, D. V. Shaller s

Plant Manager DVS:ab Attachments cc:

R. S. Hunter J. E. Dolan R. W. Jurgensen NRC Region III E. R. Swanson W. Lavallee (NSAC)

R. C. Callen S. J. Mi'erzwa R. F. Kroeger

-H. L. Sobel J. D. Huebner J. M. Hennigan A. F. Kozlowski R. F. Hering J. F. Stietzel PNSRC File 8211120318 810611 PDR ADOCK 05000315 R

PDR