ML20066D355

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1990 for Point Beach Nuclear Plant Units 1 & 2
ML20066D355
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/1990
From: Fay C, Jack J
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-003, CON-NRC-91-3 VPNPD-91-014, VPNPD-91-14, NUDOCS 9101150001
Download: ML20066D355 (9)


Text

1 f

Wisconsin 1 Electnc POWER COMPANY m w uanan to Na 2xt.wea#w a sam imim txs VPNPD-91-014 NRC-91-00' January 10, 1991 k

U..S.

NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station Pl~137 Washington, D.

C.

20555 Gentlement-DOCKETILiQ-266 AND 50-301 liQtiTilk.L.QEERATING REPORTS EQlllT. EEH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of December 1990.

Very truly yours, f(6 ;tt !

C. W.

Fay' Vice President Nuclear Power Attachments Copies to R.

S.

Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector g

9101150001 901231 POR ADOCK 05000266 g

PDR d

y o.. 1 l-A suhsf4 vihvmin Dum amvatiw

OPERATING DATA REPORT DOCKET NO. 50-266 DATE January 9, 1991 COMPI.c. A r.u BY J.

W. Jack TELEPHONE 414 755 2321 OPERATING STATUS 1.

UNIT NAS'.E:

POINT BEACH NUCLEAR PLANT UNIT 1

. NOM

2. REPORTING PERIOD: DECEMBER 1990
3. LICENSED THERMAL POWER (MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.

7. MAXIMUM DEPENDABLE CAPACITY (NE~ MWE):

485.

8.

IF CHANGES OCCUR IN CAPACITY PATINGS (I M S NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE PIASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHIC9 RESTRICTED, IF ANY l NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 744 8,760 176,664
11. HOURS IN REPORTING PERIOD 744.0 7,423.8 145,767.5
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 652.7
13. REACTOR RESERVE SHUTDOWN HOURS 744.0 7,364.3 142,903.5
14. iiOURS GENERATOR ON LINE O.0 0.0 837.9
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THEPJd.AL ENERGY GENERATED (MWH) 1,127,913 10,93S,303 199,406,695
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 382,910 3,697,690 67,302,380
18. NET ELECTRICAL ENERGY GENERATED (MWH) 366,401 3,530,349 64,121,040 100.0 84.1 80.9
19. UNIT SERVICE FACTOR 100.0 84.1 81.4
20. UNIT AVAILABILITY FACIUR
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.5 83.1 74.4
22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 81.1 73.0 O.0 0.0 1.7
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Forty-two day refueling and naintenance outage scheduled to start April 5, 1991.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDCic DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NPC LE l a tu< DATED SEPTEMBER 22, 1977

POITT BEACil NUCLEAR PIANT Docket No.

50'Y4 Unit Name Ent Beac!t Unit L LINIT SiltrIT) OWNS AND NMVER REDttTTONS Date

_ Januarvo.191 t

(

Compicted By

_J. W.Jxt REPORT LiC,NTII DECEMBER Teicphme No.

414 f55 '521 I

MetW of Sherring Cmsse aM Correarve Aoina No.

Date Type' Duration Reasorr Down Isemee Dent Svsaern Compo en 2

O kms)

Restd Renan %

Gw*e*

cme' fo P m m F-rw e 1

l l

I I

2

'_'.f etkxi-

' Exhibit G - Intructions

'F: Forced Reason-S: Scheduled A - Equipment Failure (explain) 1 - Afamtal for preparation of B - Maintenante or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER fide (NUREG-0161)

D - Regulatory Restrictitm 4 - Continuat'ma of Predous Shutdown E - Operator Training &

Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) run w esh (0190)

M

POINT BEACH NUCLEAR PLANT DOCKET NO.

M2M AVERAGE DAILY UNIT POWER LEVEL UNIT NAME

_P<st Beach. Urst 1 MONTH DECEMBER DATE Januarv 9.1*J91 COMPLETED BY J.W Jack m

TEIIPHONE 4!4/755-T I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

493 11 492 21 WM l

2

  1. 8 12
  • U 22 495 3
  1. 14 13
  1. G 23 465 4
  1. 11 14 SC 24 M

5 493 15

  • )4 25
  1. 4 6

493 16

  1. G 26
  1. 6 7

493 17

  1. C 27 494 8
  1. S 18 SO 28 56 9
  1. 14 19
  1. C 29 Su 10 494 20
  1. G 30 494 31 SM rinuunsa (03 90)

DOCKET NO.

50-266 UNIT NAME Point Beach, Unit 1 DATE Januwry 9, 1991 COMPLETED BY J. W. Jack TELEPHONE 414/755-2321 Unit 1-operated at approximately 493 MWe net throughout this leport period with the following load reduction:

p December 23 - Power reduced to 357 Mwe for turbine stop valve testing Sefety-related maintenance included the following:

Motor rebalanced on service water pump F Corrodion repaired on cooling water supply lines to motor-driven auxiliary feedwater pumps A and B and turbine-driven auxiliary feodwater pump Repaired steam leak on pipe thr:oads of "B" steam generator samplo isolation valve Adjusted packing on pressurizer liquid sample valve

a s

1I j

i J

~

S 5742 02291

. N E

O V

94692903661 91

. S I

481 100668887 A

T E,0,2 9,'3 4,2,0,

. E A

R L

1 1 8

4 7 2 U

64 3

693 E

F 11 1

1 2,1, V

U I

C 974 G

766 7

1 7

9 T

1 1

. R 2

O 3

. P 2

2 E

N 2

k

. R 801 0 1 131 0 E'

R c

5 E

X 1

a 5

. T T

0804O3063897 0 :

E I

T B

9 J

7 S

A 63 1

7 4 58888

)

9

. A D

7, 7, 7,

8, 0, 4, H

U M

1 4

L C

H E

1 W

1 O

87 7

G23 A

S T

0 4

E T

87 9 E

P 3

9 T

E C

5, 9, 7, J

N R

F O

S 0

y

. I E

T 133 O

N 5

r Y

E S

L 1

D a

B N

B N

E T

u O

A O

)

O n

u H

. 7 C

I P

A N

a uE P

I T

U D

J

. 9 L

A T

T E

L G

P R

R R

0 0 0. O 0.O.61 0. U A

c I

L E~

. U P

H

,y P

E P

T O

A T

4404' 1 01 0O2 0OD T

u C

T M

.S R

N 4 4 4

09 7 0C00 S

O A

O

.E H

T O

7 7 7

5, 8, ', 1 N

F L

I 1 1 D

e D

D C

T

. T O

M

.O N

060 A

O

- N

. 3 S

78 7 C

E R

E I

1,3 3 R

E T

N

L H

B T

1 T

A E

)

B EA A

D N

M WC D

I U

MI DE D

?

9 N

L 0.

TP E

T E

T 55 S EP P

A T

I 8 M NA Y

M S

E

(

T I

E N

4. T T

T U

U 7 :

(

i S

Q 9)

I YO 4E:

NN H

S E

E

(

T 58 W)

A W)

H R

1 N

MES L

T MH

)

) )

A 83 :

WG F

A H( W TT N

D S

L 1 2) SMN I

)

C W

.M EE O

O A

T P

55ES. I Y

I MD(

NN M

I R

0 1 WOTT

,N T

E R

D

(

O R9 MREA DA I

T D CR 6

E E

P A9 GNP E

RS DAE DE P

T F(, Y CI U

TEA X

T L

TF CR ERT MD T

A E

E1 : :

(

R L

) )

CRTENYYT I (

SO SANR GG E

R U

A UEWW( TTI R

AH RREE NN N

O C

c DW UEGN I I P

L T

NBMM I I C T

A C N. (

GCCA SS O

N ON E

RSS R

E A

H SNAAP EN I RWEHEYG OUUEE R

C O

f SI PPA RO ROON t

TV T(

G G'Y C

AO F

S

(

G AEEOTAAC I

ETDI N R

N EDWRACC HT PCTLWYEG ARRR O

R I

B OGR NECC Ai OGNRRFOO D

O T

P(

EEI LI I GEHNDREEO TTEE D

T A

T:

LLL BHR NRSOTE NTYCCGL N

C R

NDLGABBRAWT I

UNLECTAAAU E

A E

I OANCAAUC S

TSERHEA AI FFTD F

P OI MI I DDCI OE POEAEARNEBTT RRVOS C

FL UE T

OURT

.LI I YYOH A

D O

PRRTRNNCLTR S

EEATEECP C

N U

PHRCPP P LR CAI I DSE N

A EHSRVMT'RI T

T EEES AEO R

EERRC LCCE N

W A

E G' ELDD2 VF FRNEEETVI AACS O O

D T

MNDTE GTE NO ESHLCRAPPRN N D

E S

.AI EA MMNOLS I

RGCTEEEVAAOW T

T NTSLNUUAN N

RO R

LSACCFO U

R G

RNPGMMH RO SETS. SSE D

H O

N TOEEI I I C ES RB CRTS S TTTTTT S

P I

I P CMSXX WA UMAUI OOTI I I I I U E

T NEI AEAAF OE OUEONRRENNNNNH F

R A

URLNDMMI PR HNRHUGGNUUUUUS I

P A

E T

P 1234S67 8 90 123 4 567S901 23 4 5

A O

1 1 111 1 1 1 I 1 22222 2

D L_

~

POINT BEACil NUCLEAR PLANT

' DOCKET NO.

3D-RM '

AVERAGE DAILY UNIT POWER LEVEL.

UNIT NAME Point Beach. Unit 2 MONTII DECEMBER DATE Januarv 9.1991 COMPLETED BY J. W. Jack TELEPIIONE 414/755-2321 AVERAGE.

/"ERAGE AVERAGE.

DAILY LAILY DAILY POWER LEVEL POWER LEVEL POWER LEVil DAY MWe NET DAY MWe NET DAY MWe NET 1

502 11 501 21 501 2

499 12 503 22 500 3

504 13 472 23 4%

4 500 14 501 24 501 5

501 15 Sn* ___

25 5(0 6

502 16 503 26 4W 7

502 17 501 27 500 8

502 18 503 23 501 C

4R4 19 501 29 501 10 502 20 432 30 500 31 S1 _._

PBF T)28a (0190)

~..

"OINT BEACH NUCLEAR PLANT Docket No.

50-%1 Unit Name _

Foint Beach. Unit 2 UNITSIIUTDOWNS AND POuTR REDUCOONS

~ Date" Januarv 9.1991 '

~ Completed Sy.

J. W. Jack REPORT MONTII DECEMBER Tclephone No.

414/755-2321 Method of Shutting 2

No.

Dave Type' Duration R$ en Donn lxecsee bem System Component Cause and Conectwe Action 3

filours)

Reactor Remet W Cn5e*

Code' To Prevent Reconence

' F: Forced Reason-

' Method-

' Exhibit G - Instructions 2

S: Scheduled A - Equipment Failure (explain) 1 - Manual.

for preparation of

. B - Maintenance or Testing 2 - Manua: Sc am data entry sheets C - Refueling 3 - Automatic Scro LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previo2s Shutdonti Licensing Exam 5 - Reduced lead F-Administratim 6 - Other (explain)

' Exhibit I - Same Sou ce G - Operational Error (explain)

Ii - Other (explain) ;.

PDF4028b (03-90)

s,
  • DOCKEf NO.

50-301 UNIT NAME Point Beach, Unit 2 DATE January 9, 1991 COMPLETED BY J.

W. Jack TELEPHO!,'E 414/755-2321 Unit 2 operated at approximately 500 MWe not thrcughout this report period with the following load reductions:

December 2 Power was reduced to 469 MWe for condenser steam dump testing.

l Power was reduced to 369 MWe for turbine stop December 9 valve testing.

December 13 -

Power was reduced to 200 MWe in response to inadvertent actuation of relay 2ClaX.

An operator accidentally bumrv? containment pressure concensate isolattun relay 2CPAX while attempting to verify wiring in a control board.

The relay in turn tripped the condensate pumps and heater drain tank pumps.

Operators promptly responded by initiating a manual runback from 100 percent to 38 percent power and restarting the condensate the heater drain tank pumps prior, thereby preventing a unit trip.

December 20 -

Power was reduced to 295 MWe to repair condensate pump B.

Safety-related maintenance included the following:

Corrosion repaired on cooling water supply lines to the turbine-driven aux 311ary feedwater pump.