1 f
Wisconsin 1 Electnc POWER COMPANY m w uanan to Na 2xt.wea#w a sam imim txs VPNPD-91-014 NRC-91-00' January 10, 1991 k
U..S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station Pl~137 Washington, D.
C.
20555 Gentlement-DOCKETILiQ-266 AND 50-301 liQtiTilk.L.QEERATING REPORTS EQlllT. EEH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of December 1990.
Very truly yours, f(6 ;tt !
C. W.
Fay' Vice President Nuclear Power Attachments Copies to R.
S.
Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector g
9101150001 901231 POR ADOCK 05000266 g
PDR d
y o.. 1 l-A suhsf4 vihvmin Dum amvatiw
OPERATING DATA REPORT DOCKET NO. 50-266 DATE January 9, 1991 COMPI.c. A r.u BY J.
W. Jack TELEPHONE 414 755 2321 OPERATING STATUS 1.
UNIT NAS'.E:
POINT BEACH NUCLEAR PLANT UNIT 1
. NOM
- 2. REPORTING PERIOD: DECEMBER 1990
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NE~ MWE):
485.
8.
IF CHANGES OCCUR IN CAPACITY PATINGS (I M S NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE PIASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHIC9 RESTRICTED, IF ANY l NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 744 8,760 176,664
- 11. HOURS IN REPORTING PERIOD 744.0 7,423.8 145,767.5
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 652.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 744.0 7,364.3 142,903.5
- 14. iiOURS GENERATOR ON LINE O.0 0.0 837.9
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THEPJd.AL ENERGY GENERATED (MWH) 1,127,913 10,93S,303 199,406,695
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 382,910 3,697,690 67,302,380
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 366,401 3,530,349 64,121,040 100.0 84.1 80.9
- 19. UNIT SERVICE FACTOR 100.0 84.1 81.4
- 20. UNIT AVAILABILITY FACIUR
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.5 83.1 74.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 81.1 73.0 O.0 0.0 1.7
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Forty-two day refueling and naintenance outage scheduled to start April 5, 1991.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDCic DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NPC LE l a tu< DATED SEPTEMBER 22, 1977
POITT BEACil NUCLEAR PIANT Docket No.
50'Y4 Unit Name Ent Beac!t Unit L LINIT SiltrIT) OWNS AND NMVER REDttTTONS Date
_ Januarvo.191 t
(
Compicted By
_J. W.Jxt REPORT LiC,NTII DECEMBER Teicphme No.
414 f55 '521 I
MetW of Sherring Cmsse aM Correarve Aoina No.
Date Type' Duration Reasorr Down Isemee Dent Svsaern Compo en 2
O kms)
Restd Renan %
Gw*e*
cme' fo P m m F-rw e 1
l l
I I
2
'_'.f etkxi-
' Exhibit G - Intructions
'F: Forced Reason-S: Scheduled A - Equipment Failure (explain) 1 - Afamtal for preparation of B - Maintenante or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER fide (NUREG-0161)
D - Regulatory Restrictitm 4 - Continuat'ma of Predous Shutdown E - Operator Training &
Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) run w esh (0190)
M
POINT BEACH NUCLEAR PLANT DOCKET NO.
M2M AVERAGE DAILY UNIT POWER LEVEL UNIT NAME
_P<st Beach. Urst 1 MONTH DECEMBER DATE Januarv 9.1*J91 COMPLETED BY J.W Jack m
TEIIPHONE 4!4/755-T I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
493 11 492 21 WM l
2
- 8 12
- U 22 495 3
- 14 13
- G 23 465 4
- 11 14 SC 24 M
5 493 15
- )4 25
- 4 6
493 16
- G 26
- 6 7
493 17
- C 27 494 8
- S 18 SO 28 56 9
- 14 19
- C 29 Su 10 494 20
- G 30 494 31 SM rinuunsa (03 90)
DOCKET NO.
50-266 UNIT NAME Point Beach, Unit 1 DATE Januwry 9, 1991 COMPLETED BY J. W. Jack TELEPHONE 414/755-2321 Unit 1-operated at approximately 493 MWe net throughout this leport period with the following load reduction:
p December 23 - Power reduced to 357 Mwe for turbine stop valve testing Sefety-related maintenance included the following:
Motor rebalanced on service water pump F Corrodion repaired on cooling water supply lines to motor-driven auxiliary feedwater pumps A and B and turbine-driven auxiliary feodwater pump Repaired steam leak on pipe thr:oads of "B" steam generator samplo isolation valve Adjusted packing on pressurizer liquid sample valve
a s
1I j
i J
~
S 5742 02291
. N E
O V
94692903661 91
. S I
481 100668887 A
T E,0,2 9,'3 4,2,0,
. E A
R L
1 1 8
4 7 2 U
64 3
693 E
F 11 1
1 2,1, V
U I
C 974 G
766 7
1 7
9 T
1 1
. R 2
O 3
. P 2
2 E
N 2
k
. R 801 0 1 131 0 E'
R c
5 E
X 1
a 5
. T T
0804O3063897 0 :
E I
T B
9 J
7 S
A 63 1
7 4 58888
)
9
. A D
7, 7, 7,
8, 0, 4, H
U M
1 4
L C
H E
1 W
1 O
87 7
G23 A
S T
0 4
E T
87 9 E
P 3
9 T
E C
5, 9, 7, J
N R
F O
S 0
y
. I E
T 133 O
N 5
r Y
E S
L 1
D a
B N
B N
E T
u O
A O
)
O n
u H
. 7 C
I P
A N
a uE P
I T
U D
J
. 9 L
A T
T E
L G
P R
R R
0 0 0. O 0.O.61 0. U A
c I
L E~
. U P
H
,y P
E P
T O
A T
4404' 1 01 0O2 0OD T
u C
T M
.S R
N 4 4 4
09 7 0C00 S
O A
O
.E H
T O
7 7 7
5, 8, ', 1 N
F L
I 1 1 D
e D
D C
T
. T O
M
.O N
060 A
O
- N
. 3 S
78 7 C
E R
E I
1,3 3 R
E T
N
- L H
B T
1 T
A E
)
B EA A
D N
M WC D
I U
MI DE D
?
9 N
L 0.
TP E
T E
T 55 S EP P
A T
I 8 M NA Y
M S
E
(
T I
E N
- 4. T T
T U
U 7 :
(
i S
Q 9)
I YO 4E:
NN H
S E
E
(
T 58 W)
A W)
H R
1 N
MES L
T MH
)
) )
A 83 :
WG F
A H( W TT N
D S
L 1 2) SMN I
)
C W
.M EE O
O A
T P
55ES. I Y
I MD(
NN M
I R
0 1 WOTT
,N T
E R
D
(
O R9 MREA DA I
T D CR 6
E E
P A9 GNP E
RS DAE DE P
T F(, Y CI U
TEA X
T L
TF CR ERT MD T
A E
E1 : :
(
R L
) )
CRTENYYT I (
R U
A UEWW( TTI R
AH RREE NN N
O C
c DW UEGN I I P
L T
NBMM I I C T
A C N. (
GCCA SS O
N ON E
RSS R
E A
H SNAAP EN I RWEHEYG OUUEE R
C O
TV T(
G G'Y C
AO F
S
(
G AEEOTAAC I
ETDI N R
N EDWRACC HT PCTLWYEG ARRR O
R I
B OGR NECC Ai OGNRRFOO D
O T
P(
T A
T:
LLL BHR NRSOTE NTYCCGL N
C R
NDLGABBRAWT I
UNLECTAAAU E
A E
I OANCAAUC S
TSERHEA AI FFTD F
P OI MI I DDCI OE POEAEARNEBTT RRVOS C
FL UE T
OURT
.LI I YYOH A
D O
PRRTRNNCLTR S
EEATEECP C
N U
PHRCPP P LR CAI I DSE N
A EHSRVMT'RI T
T EEES AEO R
EERRC LCCE N
W A
E G' ELDD2 VF FRNEEETVI AACS O O
D T
MNDTE GTE NO ESHLCRAPPRN N D
E S
.AI EA MMNOLS I
RGCTEEEVAAOW T
T NTSLNUUAN N
RO R
LSACCFO U
R G
H O
N TOEEI I I C ES RB CRTS S TTTTTT S
P I
I P CMSXX WA UMAUI OOTI I I I I U E
T NEI AEAAF OE OUEONRRENNNNNH F
R A
URLNDMMI PR HNRHUGGNUUUUUS I
P A
E T
P 1234S67 8 90 123 4 567S901 23 4 5
A O
1 1 111 1 1 1 I 1 22222 2
D L_
~
POINT BEACil NUCLEAR PLANT
' DOCKET NO.
3D-RM '
AVERAGE DAILY UNIT POWER LEVEL.
UNIT NAME Point Beach. Unit 2 MONTII DECEMBER DATE Januarv 9.1991 COMPLETED BY J. W. Jack TELEPIIONE 414/755-2321 AVERAGE.
/"ERAGE AVERAGE.
DAILY LAILY DAILY POWER LEVEL POWER LEVEL POWER LEVil DAY MWe NET DAY MWe NET DAY MWe NET 1
502 11 501 21 501 2
499 12 503 22 500 3
504 13 472 23 4%
4 500 14 501 24 501 5
501 15 Sn* ___
25 5(0 6
502 16 503 26 4W 7
502 17 501 27 500 8
502 18 503 23 501 C
4R4 19 501 29 501 10 502 20 432 30 500 31 S1 _._
PBF T)28a (0190)
~..
"OINT BEACH NUCLEAR PLANT Docket No.
50-%1 Unit Name _
Foint Beach. Unit 2 UNITSIIUTDOWNS AND POuTR REDUCOONS
~ Date" Januarv 9.1991 '
~ Completed Sy.
J. W. Jack REPORT MONTII DECEMBER Tclephone No.
414/755-2321 Method of Shutting 2
No.
Dave Type' Duration R$ en Donn lxecsee bem System Component Cause and Conectwe Action 3
filours)
Reactor Remet W Cn5e*
Code' To Prevent Reconence
' F: Forced Reason-
' Method-
' Exhibit G - Instructions 2
S: Scheduled A - Equipment Failure (explain) 1 - Manual.
for preparation of
. B - Maintenance or Testing 2 - Manua: Sc am data entry sheets C - Refueling 3 - Automatic Scro LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previo2s Shutdonti Licensing Exam 5 - Reduced lead F-Administratim 6 - Other (explain)
' Exhibit I - Same Sou ce G - Operational Error (explain)
Ii - Other (explain) ;.
PDF4028b (03-90)
- s,
- DOCKEf NO.
50-301 UNIT NAME Point Beach, Unit 2 DATE January 9, 1991 COMPLETED BY J.
W. Jack TELEPHO!,'E 414/755-2321 Unit 2 operated at approximately 500 MWe not thrcughout this report period with the following load reductions:
December 2 Power was reduced to 469 MWe for condenser steam dump testing.
l Power was reduced to 369 MWe for turbine stop December 9 valve testing.
December 13 -
Power was reduced to 200 MWe in response to inadvertent actuation of relay 2ClaX.
An operator accidentally bumrv? containment pressure concensate isolattun relay 2CPAX while attempting to verify wiring in a control board.
The relay in turn tripped the condensate pumps and heater drain tank pumps.
Operators promptly responded by initiating a manual runback from 100 percent to 38 percent power and restarting the condensate the heater drain tank pumps prior, thereby preventing a unit trip.
December 20 -
Power was reduced to 295 MWe to repair condensate pump B.
Safety-related maintenance included the following:
Corrosion repaired on cooling water supply lines to the turbine-driven aux 311ary feedwater pump.
l t
l l
l L