Text
-
r ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT v.c. sumer I DATE 10-13-82 COMPLETED BY G.J. Taylor TELEPHONE (803) 345-520 )
MONTH SEPTEMBER 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
0 17 0
0 2
1, 3
0 0
39 4
0 0
3 5
0 0
21 6
0 O
n 7
0 23 0
24 0
3 0
9 0
0 3
10 0
.0 26 11 0
p 0
12 0
0 28 13 0
0 29 30 0
14 0
15 0
N/A 31 16 0
8211110163 821015 PDR ADOCK 05000395 R
ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V.C. Summer I DATE 10-13-82 COMPLETED BY G. J. Taylor TELEPHONE (803) 345-5209 OPER ATING STATUS 1
- 1. REPORTING PERIOD:
SEPTD1BER 1982 _.- GROSS HOURS IN REPORTING PERIOD: 720 l
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 7775 MAX. DEPE ND. CAPACITY (MWeNet): N/A DESIGN ELECTRICAL RATING (MWe Net):
90n
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
N/A (5% MWe)
- 4. REASONS FOR RESTRICTION (IF ANY):
The Operating License allows operations up t THIS MONTH YR TO DATE CUMULATIVE 5% MWt for Low Power Testing O
O O
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL D
0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS.
O O
n
- 7. HOURS GENER ATOR ON LINE O
O n
- 8. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 9. GROSS THERMAL ENERGY GENER ATED (MWH) 0 0
0
- 10. GROSS ELECTRICAL ENERGY GENER ATED (MWH)....
O O
O
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
N/A N/A N/A
- 12. REACTOR SERVICE FACTOR N/A N/A N/A
- 13. REACTOR AVAIL ABILITY FACTOR N/A N/A N/A
- 14. UNIT SERVICE F ACTOR N/A N/A N/A
- 15. UNIT AVAILABILITY FACTOR
- 16. UNIT CAPACITY FACTOR (Using DC) i..................
N/A M/A M/A
^
- 17. UNIT CAPACITY F ACTOR (Using Design MWe)
~
N/A
'N/A N/A
- 18. UNIT FORCED OUTAGE RATE
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl:
D-3 Steam Generator Modification - December, 1982 thru, January, 1983
- 20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED OATE OF STARTUP: N/A
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED 10/20/82 INITIAL CRITICALITY 11/l7/82 INITI AL ELECTRICITY COMMERCI AL OPER ATION
_ =.
4 l
ATTACHMENT III DOCKET NO.
50/395 V.C. Summer UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME I.) ATE 10-13-82 COMPLETED BY
- c. J. Taylor TELEPilONE (803) 345-5209 REPORT MONTi{
SEPTEMBER 1982 METHOD OF TYPE SHUTTING DOWN
{
F: FORCED DURATION THE REACTOR OR l
NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS N/A 820930 S
1332.0 B
4 Initial Plant Startup e
4 e
ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.: 50/395 Unit: V.C. Summer I Date: 10-13-82 Completed By: G. J. Taylor Telephone: (803) 345-5209 Virgil C. Summer Nuclear Station Unit No. 1 operated in Mode 5 (< 200*F) for the first twenty-one days of September. During this time, the Incore Moveable Detector System (CST-4) checkout was satisfactorily completed. Snubber support expansion measurements (TE-3) were taken at various increasing Reactor Coolant System temperature levels. Entry into Mode 4 (350 F <TAVb
}
September 22, 1982, with the startup test program continuing.