Monthly Operating Rept for Sept 1982
ML20066D110
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/13/1982
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20066D105 List:
References
NUDOCS 8211110163
Download: ML20066D110 (4)


Text

-

r ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT v.c. sumer I DATE 10-13-82 COMPLETED BY G.J. Taylor TELEPHONE (803) 345-520 )

MONTH SEPTEMBER 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

0 17 0

0 2

1, 3

0 0

39 4

0 0

3 5

0 0

21 6

0 O

n 7

0 23 0

24 0

3 0

9 0

0 3

10 0

.0 26 11 0

p 0

12 0

0 28 13 0

0 29 30 0

14 0

15 0

N/A 31 16 0

8211110163 821015 PDR ADOCK 05000395 R

PDR

ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V.C. Summer I DATE 10-13-82 COMPLETED BY G. J. Taylor TELEPHONE (803) 345-5209 OPER ATING STATUS 1

1. REPORTING PERIOD:

SEPTD1BER 1982 _.- GROSS HOURS IN REPORTING PERIOD: 720 l

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 7775 MAX. DEPE ND. CAPACITY (MWeNet): N/A DESIGN ELECTRICAL RATING (MWe Net):

90n

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

N/A (5% MWe)

4. REASONS FOR RESTRICTION (IF ANY):

The Operating License allows operations up t THIS MONTH YR TO DATE CUMULATIVE 5% MWt for Low Power Testing O

O O

5. NUMBER OF HOURS REACTOR WAS CRITICAL D

0 0

6. REACTOR RESERVE SHUTDOWN HOURS.

O O

n

7. HOURS GENER ATOR ON LINE O

O n

8. UNIT RESERVE SHUTDOWN HOURS 0

0 0

9. GROSS THERMAL ENERGY GENER ATED (MWH) 0 0

0

10. GROSS ELECTRICAL ENERGY GENER ATED (MWH)....

O O

O

11. NET ELECTRICAL ENERGY GENERATED (MWH)

N/A N/A N/A

12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAIL ABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE F ACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR
16. UNIT CAPACITY FACTOR (Using DC) i..................

N/A M/A M/A

^

17. UNIT CAPACITY F ACTOR (Using Design MWe)

~

N/A

'N/A N/A

18. UNIT FORCED OUTAGE RATE
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl:

D-3 Steam Generator Modification - December, 1982 thru, January, 1983

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED OATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED 10/20/82 INITIAL CRITICALITY 11/l7/82 INITI AL ELECTRICITY COMMERCI AL OPER ATION

_ =.

4 l

ATTACHMENT III DOCKET NO.

50/395 V.C. Summer UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME I.) ATE 10-13-82 COMPLETED BY

c. J. Taylor TELEPilONE (803) 345-5209 REPORT MONTi{

SEPTEMBER 1982 METHOD OF TYPE SHUTTING DOWN

{

F: FORCED DURATION THE REACTOR OR l

NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS N/A 820930 S

1332.0 B

4 Initial Plant Startup e

4 e

ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50/395 Unit: V.C. Summer I Date: 10-13-82 Completed By: G. J. Taylor Telephone: (803) 345-5209 Virgil C. Summer Nuclear Station Unit No. 1 operated in Mode 5 (< 200*F) for the first twenty-one days of September. During this time, the Incore Moveable Detector System (CST-4) checkout was satisfactorily completed. Snubber support expansion measurements (TE-3) were taken at various increasing Reactor Coolant System temperature levels. Entry into Mode 4 (350 F <TAVb

}

September 22, 1982, with the startup test program continuing.

i f

l l

I l

l I.

l l

i

.. - _....,,