Monthly Operating Rept for Sept 1982
ML20066D110
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/13/1982
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20066D105 List:
References
NUDOCS 8211110163
Download: ML20066D110 (4)


Text

-

r ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 -

UNIT v.c. sumer I DATE 10-13-82 ,

COMPLETED BY G.J. Taylor TELEPHONE (803) 345-520 )

MONTH SEPTEMBER 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 0 0 2 1, ,

3 0 0 39 4 0 3 0 5 0 21 0

6 0 n O 7 0 23 0 3 0 24 0 9 0 3 0 10 0 26 .0 11 0 p 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 N/A 31 16 0 8211110163 821015 PDR ADOCK 05000395 R PDR

ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V.C. Summer I DATE 10-13-82 G. J. Taylor COMPLETED BY TELEPHONE (803) 345-5209 OPER ATING STATUS 1 1. REPORTING PERIOD: SEPTD1BER 1982 _.- GROSS HOURS IN REPORTING PERIOD: 720 l

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 7775 MAX. DEPE ND. CAPACITY (MWeNet): N/A DESIGN ELECTRICAL RATING (MWe Net): 90n
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

N/A (5% MWe)

4. REASONS FOR RESTRICTION (IF ANY):

The Operating License allows operations up t THIS MONTH YR TO DATE CUMULATIVE 5% MWt for Low Power Testing O O O

5. NUMBER OF HOURS REACTOR WAS CRITICAL ... .........

D 0 0

6. REACTOR RESERVE SHUTDOWN HOURS . .. ..............

O O n

7. HOURS GENER ATOR ON LINE .. .. .. ....... . .....

O O n

8. UNIT RESERVE SHUTDOWN HOURS ................ ....

0 0 0

9. GROSS THERMAL ENERGY GENER ATED (MWH) ... ........ .

0 0 0

10. GROSS ELECTRICAL ENERGY GENER ATED (MWH) . . . . ..... ..

O O O

11. NET ELECTRICAL ENERGY GENERATED (MWH) ............

N/A N/A N/A

12. REACTOR SERVICE FACTOR .........................

N/A N/A N/A

13. REACTOR AVAIL ABILITY FACTOR ,....................

N/A N/A N/A

14. UNIT SERVICE F ACTOR ,... . ......................

N/A N/A N/A

15. UNIT AVAILABILITY FACTOR . .......................

N/A M/A M/A

16. UNIT CAPACITY FACTOR (Using DC) i ..................

^

17. UNIT CAPACITY F ACTOR (Using Design MWe) . ........ ....

~

N/A 'N/A N/A

18. UNIT FORCED OUTAGE RATE . .. ............ ......
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl:

D-3 Steam Generator Modification - December, 1982 thru, January, 1983

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED OATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 10/20/82 INITI AL ELECTRICITY 11/l7/82 COMMERCI AL OPER ATION

- . _ =. - . .

4 l ATTACHMENT III DOCKET NO. 50/395 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME V.C. Summer I.) ATE 10-13-82 COMPLETED BY c. J. Taylor SEPTEMBER 1982 TELEPilONE (803) 345-5209 REPORT MONTi{

METHOD OF TYPE SHUTTING DOWN

{ F: FORCED DURATION THE REACTOR OR l

! NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS N/A 820930 S 1332.0 B 4 . Initial Plant Startup e

4 e

ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50/395 Unit: V.C. Summer I Date: 10-13-82 Completed By: G. J. Taylor Telephone: (803) 345-5209 Virgil C. Summer Nuclear Station Unit No. 1 operated in Mode 5 (< 200*F) for the first twenty-one days of September. During this time, the Incore Moveable Detector System (CST-4) checkout was satisfactorily completed. Snubber support expansion measurements (TE-3) were taken at various increasing Reactor Coolant System temperature levels. Entry into Mode 4 (350 F <TAVb } "

  • September 22, 1982, with the startup test program continuing.