ML20066C877
| ML20066C877 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/16/1982 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20066C859 | List: |
| References | |
| LIC-82-240, NUDOCS 8211100532 | |
| Download: ML20066C877 (1) | |
Text
_
h,
- Q... -
- C% %1; Omaha Public Power District 1623 HARNEY E OMAHA. NEBRASKA 68102 m TELEPHONE 536-4000 AREA CODE 402 June 16, 1982 LIC-82-240 t
7_
Mr. J. T. Collins, Administrator i
U. S. Nuclear Regulatory Commission l
Region IV M 221982 h 611 Ryan Plaza Drive, Suite 1000 r1 Arlington, Texas 76011 J U,L
Reference:
Docket No. 50-285
Dear Mr. Collins:
Pursuant to 10 CFR 50, Appendix E, Section IV, Paragraph V, thirteen (13) copies of changes (two sets) to the Fort Calhoun Station Emergency Plan Implementing Procedures are being provided to the Comriission.
Three (3) copies (fer control copy numbers 154, 155, and 156) are pro-vided for your office. Ten (10) copies (for control copy numbers 157 through 166) have been provided to the Office of Nuclear Reactor Regu-l ation. Please note that copies numbers 165 and 166 vere sent addressee only to Mr. Rohrer and Mr. Tourigny, respectively. A transmittal sheet is provided for each copy to confirm receipt of the serialized document.
It is requested that these sheets be completed and returned within five (5) days of receipt.
Sincerely, k k f$Y
'< t/ W. C. Jones Division Manager Production Operations Enclosures cc: Mr. Harold R. Denton, Director (10)
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 8211100532 821028 PDR ADOCK 05000285 F
__.-m
_ _,_. _,.o __. _
.