ML20066C781

From kanterella
Jump to navigation Jump to search
Forwards Revised Response to Question 620.8 to Clarify Position Re Standardized Training Matls,Per NRC 900727 & 0902 Ltrs.Samples of ABWR Sys Operating Procedures & Integrated Operating Procedures Also Encl
ML20066C781
Person / Time
Site: 05000605
Issue date: 01/09/1991
From: Robare D
GENERAL ELECTRIC CO.
To: Chris Miller
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20066C783 List:
References
EEN-9104, MFN-003-91, MFN-3-91, NUDOCS 9101110211
Download: ML20066C781 (3)


Text

-

i GE Nuclear Energy.

January 9,1991 MFN No 003 91 i

Docket No. STN 50 605 EEN 9104 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

l Attention:

Charles L Miller, Director i

Standardization and Non Power Reactor Project Directorate

Subject:

GE/NRC 12/20/90 Conference Call to Discuss GE AI!WR RAI Responses 7

Reference:

1. Submittal of Responses to AdditionalInformation as Requested in NRC Letter from Dino Scaletti, dated July 27,1990, MFN Nos.

i 129 90,130 90,137 90 and 138 90, dated September 2,1990 1

In response to NRC's request during the subject conference call for GE to clarify its position i

relative to standardized training materials, GE has enclosed a revised response to Question 620.8.(Reference 1). OE agrees with the NRC that it would be possible to prepare training i

materials w!thout knowledge of the site specific equipment but GE has elected to defer preparatici, of this training material to the First applicant referencing the ABWR design, -

Also enclosed are samples of the ABWR System Operating Procedures and Integrated Operating Procedures requested during the subject conference call.

o Sincerely, D.J. Robare, Manager Regulatory and Analysis Services M/C 382, (408) 925 6948

(=

l cc: F. A. Ross (DOE) w/o enclosure D. C. Scaletti(NRC) w/ enclosure S.F.Shankman (NRC) w/ enclosure D. R. Wilkins (GE) w/o enclosure J. F. Quirk ' (GE) w/o enclosure i

fDR101110211 910 top A

ADOCK 05000605 (f{

1COU814 PDR

e e

QUESTION 620.8 Describe the content and format of training materials to be provided by GE to purchasers of the ABWR.

Will these materials be offered as customi:ed options, or will they be included and standardized?

RESPONSE 620.8 (REVISED)

The ABWR Standard Safety Analysis Report (SSAR) is based upon plant system design definitions and equipment as depicted in attached Figure 1.

As indicated in this figure, it would be possible to prepare training' materials as part of the design certification.

GE has elected, however, to defer preparation of this training material to the first applicant referencing the ABWR design since the associated cost is prohibitive at this time (estimated to be in excess of two million dollars ) and the training materials are not part of the design.

Subsequent applicants will utill e the training-material developed by the first applicant (which will be subject to NRC review on the docket of the first applicant) thereby providing standardized training material.

Deferral of the preparation of training materials will be included as an interface requirement in the SSAR.

l

.1