ML20066C564

From kanterella
Jump to navigation Jump to search
Informs That Final Submittal for Deficiency Rept DER 82-39 Re C-E Valve Limit Switches Below Max LOCA Flood Level in Containment Will Be Finalized by 820203
ML20066C564
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/28/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22138-GHD, DER-82-39, NUDOCS 8211100087
Download: ML20066C564 (2)


Text

._. _ _ _ _ _ _ _ _ - _ _

Dockst Noa.- 50-528/529/530

    • ,r 50.55 (c) ' Report REggITO HRC IFFDF:!MJt@ @B3F@f11CdfEll@gg E TEZ(HE&A 3003 go, p.o. sox 21sse -

PHOENIX, ARIZONA 85036 October gi

,1g82 ANPP-2213 !p'CilB/s$K U. S. Nuclear, Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-39 A 50.55(e) Potentially Reportable. Deficiency Relating to C. E. Valve Limit Switches (Class 1E) May Be Below Maximum LOCA Flood Level In Containment File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between G. Hernandez and G. Duckworth on July 30, 1982 (B) ANPP-21722 dated August 30, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by November 2, 1982.

Due to the extensive investigatior,and evaluation required, it is now expected that this information will be finalized by February 3, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

(

CLLL

~nh E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Projec.: Director EEVBJr/GHD:db cc: See Attached Page 2 8211100087 821028

~

PDR ADOCK 05000528 S

PDR

r n

U. S. Nuclear. Regulatory Commission October 28, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22138-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of-Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods,-Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S..Kaplan

.W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 1.