k VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-12 FOR THE MONTH OF DECEMBER, 1981 1
l i
i i
f J
+r 8211100027 820112 PDR ADOCK 05000271 R
pop
OPERATING DATA REPORT DOCKET NO.
50-271 DATE 820112 COMPLETED BY F. J. Burger TELEPHONE (802)257-7711 Ext 137 OPERATING STATUS r' Notes
- 1. Unit Name: Vermont Yankee
- 2. R porting Period: Dect.mber 1981
- 3. Licensed Thermal Power (int):
1593
- 4. Ntmeplate Rating (Gross We):
540
- 5. Design Electrical Rating (Net We): 514(oc) 504 Tec)
- 6. Maximum Dependable Capacity (Gross We): 535
- 7. Maximum Dependable Capacity (Net We):
504
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasonse
- 9. Power Level to Which Restricted,If Any(Net We):
- 10. R:asons For Restrictions, If Any:
This Month Yr-to-Date Cumulative 8760.00
- 11. Hours In Reporting Period 744.00
- 12. Number Of Hours Reactor Was Critical 651.42 7542.37 65,078.15 0.00 0.00 0.00
- 13. R: actor Reserve Shutdown Hours 576.73 7409.61 63,011.19
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 806,141.50 11.312,243.50 89.915,760.50
- 17. Gross Electrical Energy Generated (MWH) 267,155.00 3,759,124.00 29.871.971.00
- 18. Nat Electrical Energy Generated (MWH) 256,031.00 t 568.707.00 28,316,286.00
- 19. Unit Service Factor 77;.52 84.58 77.47 77.52 84.58 77.47
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 68.28 80.83 69.07 66.95 79.26 67.73
- 22. Unit Capacity Factor (Using DER Net) 15.95 2.78 6.80
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
\\.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 820112 COMPLETED BY F.J. Burger (802) 257-7711 Ext 137 g pgggg MONTH December 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
518 2.
0 18.
518 3.
28 19.
519 4,
61 20.
497 5.
29 21.
519 22.
520 6.
o 23.
520 7.
82 24.
482 8.
29s 25.
520 9.
3s2 26.
482 10.
396 11, 481 27.
0 12.
517 28.
70
^
13.
511 29 :
365 14.
518 30.
398 15.
518 31.
488 16.
518 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
't
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee REPORT MONTH December 1981 COMPLETE B J Burger TELEPHONE
_(802) 257-7711 ext 137 l
1 of 2 m
i
$oE Y Ef o y
Cause & Corrective N
No.
Date j
- jy g
- jg ge Action to License H
R port #
0
"*O n
g u
E 81-19 811016 S
57.80 C
N/A N/A ZZ ZZ Refueling outage in progress (cont) 81-20 813203 F
17.38 A
N/A N/A HA TURBIN Turbine rotor out of balance.
Rebalanced rotor.
81-21 811205 F
56.90 A
2 N/A CB PUMPXX Shutdown to replace degraded reactor recirc culation pump seal.
r:
81-22 811209 S
0 B
4 N/A RB CONROD Power reduction for control rod pattern (Power adjustment.
[
Reduct) 81-23 811220 S
0 B
4 N/A HA TURBIN Power reduction for main turbine and control (Power RB CONROD rod surveillance Reduct)
F: For[ed Reason:
Method:
Exhibit G-Instructions S Sdheduled A-Equipment Failure (Explain) 1-Manual' for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refuelingx 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative 5 Exhibit I -_Same Source-G-Operational Error (Explain)
H-Other (Explain) n/rra
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 820112 REPORT MONTH December 1981 COMPLETED BY F.J. Burger TELEPHONE (802) 257-7711 ext 13/
2 u Eu A
cm u
ME "c dO License En ause & Corrective N@.
Date is E.
NE E
l$ U E Event E
E$
$2
$23 E
fS$
Report #
E,0 E"' O o
M em m
g U
S 81-24 811224 F
0 A
4 N/A HG DEMINX Power reduction to precoat the "C" conden-(Power sate demineralizer.
Spare demineralizer Reduct) already out of service 81-25 811226 F
35.18 A
3 N/A HB MECFUN Main turbine pressure regulator failed resulting in a high flux scram. Fail-ure caused by sticky mechanical linkage which was cleaned, lubricated, and adjustec 81-26 811230 S
0 B
4 N/A RB CONROD Power reduction for a control rod pattern (Power CB PUMPXX adjustment and maintenance of the "B" Reduct) reactor recirculation pump speed control circuit.
1 2
3 4
F: Fogced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data l
B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREG 0161) l E-Operator Training & License Examination I
F-Administrative
~,
i Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain) 7/80
DOCKET No.
50-271 UNIT Vermont Yankee DATE 820112 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext 137 SAFETY RELATED MAINTENANCE 1 of 3 NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION UPS System Alarms Corrective N/A Incorrect Wiring at Wrong Alarms Corrected Wiring Errors MR 79-0873 Annunciator Panel Annuciate CAD Isolation Valve Corrective N/A Dirt Valve Would Not Disasssabled and Cleaned FSO 109-75-D1 MR 81-0853 Shut Valve Rscirc Sample Valve, Corrective N/A Loose Clevis Hanger Not Sup-Tightened and Anchored FCU-40, Hanger MR 81-1217 porting Valve Clevis to Valve RWCU Valve V12-32B Corrective N/A Worn Packing Leakage Tightened Packing -
MR 81-1456 RWCU Ragenerative Heat Ex-Corrective N/A Unknown Leakage Plugged Leak Off chtngs E-15-lC MR 81-1458 lInterConnectingPiping Canatruction Leak Off N/A Worn Gasket Leakage Replaced Gasket l Corrective RHR Hast Exchanger-MR 81-1459 E-14-1B Cora Spray Valve V14-11A Corrective LER 81-35/3L Fault / Breaker Breaker Tripped Replaced Breaker Mstor Operator Breaker MR 81-1460 During Operatior N
Drywell Pressure Indicator Corrective '
N/A Failed Amplifier Erroneous Readiog Replaced Amplifier PI-16-19-12A MR 81-1468 l
l g-
DOCKET NO.
50-271 UNIT Vcra:nt Ycnkte DATE 820112 COMPLETED BY F.J. Burger TELEPHONE (802) 257-7711 ext 137 SAFETY RELATED MAINTENANCE 2
NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION R::ctor Recirculation Pump Corrective N/A Faulty Mechanical High Seal Temp-Rebuilt seal P18-1A MR 81-1470 Seal erature Drywell Personnel Access Corrective N/A Failed G asket Air Leakage Replaced Gasket Hitch Outer Door MR 81-1475 R::ctor Building Personnel Corrective N/A Loose Seal Air Leakage Adjusted Seal, Calked Air L ck Outer Door MR 81-1485 Door Casing S rvice Water Pump Corrective N/A Worn Packing Leakage Adjusted Packing.
P7-1B MR 81-1490 S:rvice Water Pump Corrective N/A Worn Packing Leakage Adjusted Packing P7-lD l-01 81-1491 Recctor Recirc Valves Corrective N/A Worn Packing Leakage Adjusted Packing V2-304A-C and V2-98A, Main MR 81-1498 Stera Valves V60-72B-F and 11
/
RHR H ng$r H-192 Bolting Corrective N/A Construction Worn threads, Replaced Bolting Minimal Thread j
MR 81-1521 i
Engagement RHR Service Water Valve Corrective N/A Worn Packing Leakage Adjusted Packing V70-89B MR 81-1530 i-
DOCKET NO.
50-271 UNIT Vernont Yenk2e DATE 820112 COMPLETED BY F.J. Burger TELEFi!ONE (802) 257-7711 ext 137 SAFETY RELATED MAINTENANCE 3
NATURE OF MALFUNCTION ER OR OUTAGg EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION SLC Velve V11-25 Corrective N/A Corroded Seat Valve Leakage-Lapped Seating Surfaces MR 81-1572 Smrvics Water Pump Corrective N/A Worn Packing Leakage Adjusted Packing T7-1C MR 81-1582 RWCU Vsive V12-19B Corrective N/A Worn Packing Leakage Adjusted Packing MR 81-1604 RilR Service Water Pump Corrective LER 81-37/3L Worn Bushings Breaker Trips Replaced B2shings-P8-1A Circuit Breaker MR 81-1612 Upon Pump Start e*
1 l
i
DOC".ET No.
50-271 UNIT Vermont Yankee DATE 820112 COMPLETED BY F.J. Burger TELEPHONE (802) 257-7711 ext 137 REPORT MONTH December 1981
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 68.02% of rated thermal power for the month.
Gross electrical generation was 267,155 MWH, or66.50% of design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
12/1/81 At the beginning of the reporting period the plant was shut down for refueling.
At 1949 hours0.0226 days <br />0.541 hours <br />0.00322 weeks <br />7.415945e-4 months <br /> a reactor start up was initiated.
12/3/81 At 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br />, after completing main turbine overspeed testing, the main turbine was shut down for rotor balancing.
12/4/81 At 1333 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.072065e-4 months <br /> the main turbine was phased into the grid.
12/5/81 At 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> a reactor shutdown was initiated to replace a degraded seal in the "A" reactor recirculation pump.
12/7/81 At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> a reactor start up and power ascension was initiated 12/9/81 At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> a power reduction was initiated for a control rod pattern adjustment.
At 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> a return to full power initiated.
12/20/81 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> a power reduction was initiated for control rod and main turbine surveillance testing.
At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> a return to full power was initiated.
12/24/81 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> a power reduction was initiated to remove the "C" condensate demineralizer from service for precoating.
The sparc demineralizer was already out of service.
At 0610. hours a return to full power was initiated.
12/26/81 At 1944 hours0.0225 days <br />0.54 hours <br />0.00321 weeks <br />7.39692e-4 months <br /> the plant was shutdown by a reactor high flux scram caused by a faulty main turbine pressure regulator.
\\
12/27/81 At 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br /> a reactor start up and return to full power,was initiated.
o '.
Operating Summary (continued)
I 12/30/81 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> a power reduction was initiated for a control rod pattern adjustment and maintenance of the "B" reactor recirculation pump speed centrol circuit.
At 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> a return to full power was initiated.
12/31/81 At the end of the reporting period the plant was operating at 99.7% of rated thermal power.